Why is the Canada (embarrassment) Line built the way it is?

Despite its high cost, the C+Line was designed to have shorter stations than the underground stations in Edmonton & Seattle. Even shorter than the ground level stations in Calgary & Portland. Considering that a Montreal Metro station is 152.5m or 500 feet in length, the absurd C Line stations are only 50m. 

A one third size train still could have been designed for proper future capacity expansion. Unfortunatly, this joke of a train was only designed to have 2 coaches & eventually 2.5 car trains, not 5 & certainly not 10. Because that's what a proper big city would do.

The light rail train bridge to Richmond wasn't designed to have any bus lanes, just 1 bike lane. No proper bus & HOV lane bridge has been built next to the narrow Knight+Street+Bridge , Oak+Street+Bridge , or Arthur+Laing+Bridge. By now, all 3 road bridges should have had 4 lane bus & HOV bridges next to them. Indeed, each bridge should have had 2 bus & 2 HOV lanes beside them by now. But why do that when everything can be crammed into just 2 lanes each way. Combine that with no breakdown lanes or wide shoulders & you have classic BC bottleneck planning. Since the C Line isn't running 24 hours, there should have been a 24 hour express bus to the airport on 2 dedicated lanes on the C Line bridge. That would have made it possible to always have an airport express bus, especially when the C Line is only running 2 car trains.

It's all such a sad joke that should be laughed at all over the world. It's also symbolic of the refusal to properly think & build big in backwards BC. Its like a whole lot of money was never efficiently or properly put into the regional infrastructure over the course of several generations.