Saturday, January 17, 2026

The Great SkyTrain upgrade (potential)

 https://www.youtube.com/watch?v=_D2CXdZ_4Ro 

Unfortunatly, the first 2 Skytrain lines were designed to only have 80m stations and trains. The 3rd line to YVR and Richmond was only designed to have 50m stations. In contrast, the Montreal Metro has stations long enough to accomodate 152.4m long trains. Thus, the greatest mistake was to not enable the Skytrain to eventually become a very high capacity train system. Combine that with mostly narrow bridges and roads in Greater Vancouver and you have the epitome of congestive urban planning. 

At least by late 2025 some of the new 5 car trains were out, along with some of the old 6 car little box trains on the 1st line. The 2nd and 3rd lines are still running 2 car joke trains, but that symbolically fits right in with the, KEEP BC SMALL AND BACKWARDS mentality. 

A proper big city long-term plan would have been to allow for 10 car trains, with at least 5-6 car trains at the start when each line opened.