Showing posts sorted by date for query New Westminster. Sort by relevance Show all posts
Showing posts sorted by date for query New Westminster. Sort by relevance Show all posts

Monday, April 27, 2026

Old Pattullo Bridge and its Still Narrow Replacement

 https://www.youtube.com/watch?v=8_mNfn4zjcI 

Even in the 1930s there should have been some type of a big city vision, but with NW being so small and Surrey being so out of the way, this part of BC was on the urban periphery. Apparently, there was no concept of an emergency lane on the Pattullo Bridge. Still, in addition to the 2 narrow lanes each way, there should have been 2 lane for horses and wagons. Then, by the 1950s the PB could have had 3 wide lanes each way, pulse a strong traffic divider. Instead, the narrow PB was stuck with only two lanes each way, no safety divider and only 1 narrow sidewalk.

For most of its history, NW just saw it self as a provincial backwater. The lack of a big city vision in the early 1900s meant that it never bothered to absorb what would become the Tri-Cities. For most of its history, Surrey never considered that it could eventually become the largest city in BC. Of course now that has changed.

Despite being so small, NW has become a Metro Vancouver regional transit hub, because of the New_Westminster_station

Scott_Road_station is a transit hub for the South_Westminster area.

Surrey and NW really should have had a proper big city size bridge.

This is how the new road configuration could have gone for what should have been a 10 lane bridge, not another 4 lane BC joke. Even if it can eventually have 6 lanes, there is no provision for a lower deck for trains and busses.

This shows how existing key roads could have linked into a 10 lane bridge, all without having to widen the surrounding roads. Thus, no need for any major land expropriation.

2 lanes from Royal Avenue onto the new bridge and 2 lanes from the bridge onto Royal Avenue in New+Westminster.   

One lane onto and one lane off linking the bridge to the South_Fraser_Perimeter_Road in Surrey.

2 lanes onto McBride boulevard and 2 lanes onto the bridge from McBride in New+Westminster.  

From Columbia_Street_in New_Westminster, 1 lane onto the bridge, as well as 1 lane off the bridge

2 lanes from King_George_Boulevard onto the new bridge and 2 lanes from the bridge onto KGB in Surrey

2 lanes from Scott Road onto the new bridge and 2 lanes from the bridge onto Scott_Rd in Surrey.  

Things weren't properly explained to the public as to how important a wide big city bridge could have been possible and without having to widen the roads connecting to it.

Unfortunately, all of this is being funneled into just 2 lanes each way. Its as if someone symbolically wanted the new bridge to open without any bus and HOV lanes. That's how BC bottleneck and chokepoint planning works. 


https://en.wikipedia.org/wiki/Metro_Vancouver_Regional_District  

https://en.wikipedia.org/wiki/Fraser_Valley

Some day, the BC Lower_Mainland should be planned and developed to function more like a proper big urban area. 

Wednesday, April 22, 2026

Temporary stal̕əw̓asəm Bridge closure will impact all traffic this weekend for construction

 https://dailyhive.com/vancouver/bridge-temporary-closure-surrey-new-westminster 

Lets open a bridge without 2 wide emergency lanes or 2 wide shoulders. Especially make sure that it didn't open with enough space for 2 bus lanes and 2 HOV lanes. Of course don't design the Bridge to have a potential lower deck for trucks and trains. Its an instant classic BC bottleneck chokepoint! 

https://www.pattullobridgereplacement.ca/about/projectoverview Just like the SkyBridge, apparently, there was no need to open it with 2 bus lanes, despite the train not running 24/7.

Unfortunately, the Bridges_over_the_Fraser_River in the BC Lower_Mainland just weren't designed to have proper bus lanes. Its so strange that the narrow SkyBridge was_for_SkyTrain only. 

Just like the new tunnel between Richmond and delta, there is no provision for 2 train tracks. While there are 2 bus lanes, there won't be any exclusive HOV lanes. Eventually, there will have to be a proper train and rapid bus bridge or another tunnel beside it. 

https://www.highway99tunnel.ca/project-overview-frt "The Fraser River Tunnel Project includes a new, eight-lane immersed tube tunnel that will replace the existing George Massey Tunnel on Highway 99. The new tunnel will have three vehicle lanes and a dedicated transit lane in each direction, with a separated active transportation corridor for cyclists and pedestrians." 

Given that this is supposed to be a major port region, a train and rapid bus crossing needs to eventually be there. A train connecting YVR to the Tsawwassen Ferry terminal and 2 rapid bus lanes. Then the main tunnel could still provide 3 general lanes each way, plus a HOV lane each way. https://www.infrastructurebc.com/project/fraser-river-tunnel-project/  

Unfortunately, proper big city size infrastructure is a difficult thing to achieve in backwards BC. Since the decision was made to not have a rail component in the new highway99tunnel, the middle 2 bike lanes should have been wide enough to eventually become 2 rapid bus lanes. Then a new bridge or parallel tunnel could have a YVR to ferry terminal train, plus 2 truck lanes, 2 bike lanes an 2 sidewalks. 

This is what a proper big regional port crossing should be like, but for backwater BC, its a different set of priorities. 

Thursday, April 2, 2026

Major upgrades to busy Queensborough Bridge will close lanes until 2027

https://dailyhive.com/vancouver/queensborough-bridge-upgrades-lane-closures-new-westminster-richmond 

When the Queensborough_Bridge opened in 1960, there wasn't any serious consideration for future capacity. The QB should have had 2 wide shoulders and 2 wide emergency lanes. Then, by the 1980s 2 bus lanes could have been opened. Then, by around 2000 the QB could have had 3 lanes each way, plus 1 bus lane each way.

https://vancouver.citynews.ca/2026/04/02/construction-to-close-queensborough-bridge-lanes-overnight-until-2027

https://www2.gov.bc.ca/gov/content/transportation-projects/other-transportation-projects/queensboroughbridge

https://en.wikipedia.org/wiki/Queensborough_Bridge Unfortunatly in 2026, the QB remains as a 4 lane funnel. Just 2 lanes each way as its another classic BC bottleneck-chokepoint, by design. There is enough space east of the bridge for a new northbound bridge to be built. 

New_Westminster has always been a small city, because it never absorbed what would become the Tri-Cities. Thus, a narrow QB fits in with such a little provincial backwater. However, as part of the BC Lower_Mainland its part of a region with over 3 million people. This puts NW in the position of being a regional hub city. 

https://604now.com/queensborough-bridge-upgrades-richmond-new-westminster-2026-2027/

https://dailyhive.com/vancouver/queensborough-bridge-upgrades-new-westminster-richmond

https://www.patrickjohnstone.ca/2013/07/alas-queensborough-bridge-works.html

http://archives.newwestcity.ca/permalink/24422 , http://archives.newwestcity.ca/permalink/99415/  

https://en.wikipedia.org/wiki/Queensborough,_New_Westminster , https://www.newwestcity.ca/database/rte/122554-QB.PDF

Bike+bridges aren't a problem in many Australian cities and around the world. However, as usual, its more difficult to get such things done in backwards BC.

https://www.newwestcity.ca/database/files/library/Q2Q_Bridge_Brochure_2015_02_02.pdf  

https://www.patrickjohnstone.ca/2013/07/connecting-qb-to-quay.html There should have been a proper bike and foot bridge between Queensborough and downtown NW, decades ago. 

https://www.newwestcity.ca/planning-building-and-development/projects-on-the-go/articles/3475.php


 https://jfdatalinks.blogspot.com/search?q=Queensborough+Bridge

The Pattullo Bridge replacement, so far

 https://www.pattullobridgereplacement.ca/construction/bridge-opening/ 

There are still months of finishing touches.

https://www.pattullobridgereplacement.ca/construction/current-works/ 

Over the course of the year, many more people will start to realize that despite there being adequate bike lanes, there are no bus lanes, no wide shoulders and especially no emergency lanes. Its currently still too narrow for all of that.

https://www.reddit.com/r/SurreyBC/comments/1omufv6/the_new_pattullo_bridge_will_gradually_open_to/  

In fact, the bridge was deliberately designed to be so narrow that there is only enough future deck space for either 2 bus lanes or 2 emergency lanes, but not both. For now, its just another 4 lane BC funnel.

https://www.google.com/maps/place/New+Westminster,+BC 

No lower deck for a potential truck connection between Surrey and Front Street and especially, no lower deck for a future LRT crossing.

https://www.vancouverisawesome.com/highlights/pattullo-bridge-renamed-stalwasm-set-to-open-soon-11595501

It seems that whenever its possible, a 4 lane BC bottleneck-chokepoint is all that's necessary.

https://www.reddit.com/r/SurreyBC/comments/1rb4nmd/bus_connect_surrey_and_coquitlam/ 

It really would be a good idea to eventually have a couple of bus lanes on that bridge, especially since the Skytrain doesn't run 24 hours a day.

https://www.google.com/maps/place/New+Westminster,+BC/@49.2037496,-122.8791442,674m/data=!3m1!1e3!4m6!3m5!1s0x5485d8753ddb5097:0xeca8e918f64dfeee!8m2!3d49.2057179!4d-122.910956!16zL20vMDF2cXEx!5m1!1e1?entry=ttu&g_ep=EgoyMDI2MDMzMS4wIKXMDSoASAFQAw%3D%3D 

Its still amazing how the SkyBridge (1990) was never built with 2 bus lanes, 2 bike lanes and 2 sidewalks. Such is the narrowminded planning methodology that is backwards BC.  

https://en.wikipedia.org/wiki/SkyBridge_(TransLink)#Details   


https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge+replacement 

https://jfdatalinks.blogspot.com/search?q=Queensborough+Bridge 

https://jfdatalinks.blogspot.com/search?q=SkyBridge

Friday, January 30, 2026

Major upgrades for Queensborough Bridge in NW

 https://dailyhive.com/vancouver/queensborough-bridge-upgrades-new-westminster-richmond 

Another classic BC bottleneck-chokepoint. This bridge is so narrow, because there aren't any emergency lanes, let alone any bus & HOV lanes. The narrow and inadequate Queensborough+Bridge just wasn't designed for a properly growing seaport region. A twin or duplicate bridge should have been built immediately east of the first bridge, decades ago. A parallel 4 lane bridge would allow for 3 lanes on each bridge, plus a 4th lane for buses. However, that would go against the regional congestive planning agenda. 


https://jfdatalinks.blogspot.com/search?q=Queensborough+Bridge

Wednesday, September 24, 2025

Wednesday, August 27, 2025

Tuesday, August 26, 2025

Port Moody and New Westminster

Port_Moody is very small in area at 25.85 km2 (9.98 sq mi). New_Westminster is such a tini area at 15.62 km2 (6.03 sq mi). PM only has around 40 thousand people & NW has around 90 thousand residents. 

There has never been a proper transportation corridor between Port+Moody and Deep+Cove. Certainly no ferry between PM, DC & Downtown_Vancouver. NW is also a transportation joke of a city, because there should have been at least 2 other bridges. One to Richmond and another bridge to Surrey.

Of course there is no direct Airport_rail_link between NW & Richmond. Even an express Airport_bus_link would be an improvement. However, a 24 hour Airport-ferry_connection between MissionMaple_RidgePitt_MeadowsPort_CoquitlamFraser-MillsNW and Richmond.

https://en.wikipedia.org/wiki/Intermodal_passenger_transport#Train-ferry_connection

There is so much of a need for proper Intermodal_passenger_transport in BC. 

https://en.wikipedia.org/wiki/Intermodal_passenger_transport#Bus_to_public_transport_nodes


https://en.wikipedia.org/wiki/Port_Moody#Transportation  

https://en.wikipedia.org/wiki/New_Westminster#Transportation  

Friday, February 28, 2025

Metro Vancouver regional district governance review changes

 https://dailyhive.com/vancouver/metro-vancouver-regional-district-governance-review-changes

https://www.cbc.ca/news/canada/british-columbia/metro-vancouver-treatment-plan-audit-1.7239051 Why have a train tunnel fromWest Vancouver to Waterfront_Station in Vancouver when instead, you can put a few extra billion dollars into a North Shore shit-pipe?


"The reasons behind the escalation are the subject of duelling lawsuits between the contractor Metro Vancouver fired and the regional district, but the now $3.9 billion is five times beyond the original $700 million budget Metro set a decade ago and more than double a revised $1 billion budget from 2021.

The issue’s complexity lies in the fact that Metro Vancouver’s sewage treatment services are broken up into four sewerage areas, unlike the drinking water system that is operated as a single entity.

Article content
Article content

The sewerage areas are: North Shore; Vancouver, which includes UBC and parts of Burnaby and Richmond; Lulu, which is most of Richmond and Fraser, which is most other Metro municipalities.

Article content
Article content

All municipalities pay for the capital costs of new facilities, but those within each district pay a bigger share for facilities in their own district." https://vancouversun.com/news/local-news/metro-vancouver-will-pay-for-north-shore-sewage-plant


https://www.nsnews.com/in-the-community/north-vancouver-district-asks-province-for-public-inquiry-on-sewage-plant-debacle-9777554 So much extra money will have to be paid out for a shit-box & a shit-pipe cost overrun. A few extra billion dollars could have easily paid for an improved Canada+Line and extension from downtown Vancouver to Park+Royal and the Horseshoe+Bay ferry terminal.


https://vancouversun.com/news/new-westminster-mayor-sides-with-metro-vancouver-in-surrey-spat Surrey wants to eventually become the biggest city in BC. That means not having similar restrictions that Vancouver, NW & Victoria have. Surrey wants to have taller buildings than restrictive Vancouver. First, it will have to rival Burnaby & Bellevue, WA and ultimately, Vaughan, Ontario. Instead of having 1 big downtown area, there will be a few town centres as well. 

While Surrey might want to have more autonomy, its still part of the Metro_Vancouver_Regional_District.


https://jfdatalinks.blogspot.com/search?q=SHIT-BOX

Saturday, February 15, 2025

Three dead, one injured in crash on Pattullo Bridge

 https://vancouversun.com/news/three-dead-in-crash-pattullo-bridge

https://vancouver.citynews.ca/2025/02/15/new-westminster-surrey-pattullo-bridge-fatal-crash/

https://www.castanet.net/news/BC/533640/Three-killed-one-seriously-injured-in-crash-on-Metro-Vancouver-bridge

https://www.cbc.ca/news/canada/british-columbia/pattullo-bridge-crash-closed-1.7460474

https://www.ctvnews.ca/vancouver/article/3-dead-1-hospitalized-with-life-threatening-injuries-after-major-crash-on-metro-vancouver-bridge/

https://dailyhive.com/vancouver/pattullo-bridge-fatal-crash-february-2025

https://www.pattullobridgereplacement.ca Fortunately, the replacement bridge will have a central safety divider.

https://www.pattullobridgereplacement.ca/about/projectoverview Unfortunatly, the new bridge will open with only 4 lanes & no provision for a lower deck. However, there will be 2 bike & 2 footpaths. Despite being what is supposed to be a major port region, there are no truck lanes. Since Skytrain isn't a 24hr system & the Skybridge wasn't designed to have 2 bus lanes open at least during track maintenance, the new bridge should have had 2 bus lanes. Instead, cars, trucks & busses will all be funneled into only 2 lanes each way. So just like with the first bridge, BC bottleneck planning wins out.

https://www.highway99tunnel.ca While its several decades behind schedule, an 8 lane crossing is at least on the horizon.

https://www.highway99tunnel.ca/project-overview-frt Unfortunatly, in accordance with backwards BC infrastructure planning, there is no provision for a train tunnel or a bridge to Delta & especially the Tsawwassen_ferry_terminal. That seems to fit right in with not having a train from Waterfront_station to Park_Royal_Shopping_Centre and the Horseshoe_Bay_ferry_terminal

Until the stations on the first 2 Skytrain lines are lengthened, they will be stuck with 5 car trains. Proper long-range planning should have allowed for 8-10 car trains. The joke that is the Canada Line, should have had stations that could initially handle 4-5 car trains, with a provision to eventually accommodate 8-10 car trains. The existing ridiculously short stations can only handle 2.5 car trains. WTH? 

This unofficial congestive BC planning initiative is a multigenerational ME$$! Aparenty, narrow bridges & no regional bus bridges & short trains, can adequately move people around in a region of over 3 million people. Fortunately, when greater Toronto, Montreal, Boston, Sydney, Melbourn, Seattle & especially the SFBA all surpassed having 3 million people, they weren't bound by anything like the backwater BC mentality.


https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge