Showing posts sorted by date for query YVR. Sort by relevance Show all posts
Showing posts sorted by date for query YVR. Sort by relevance Show all posts

Wednesday, April 22, 2026

Temporary stal̕əw̓asəm Bridge closure will impact all traffic this weekend for construction

 https://dailyhive.com/vancouver/bridge-temporary-closure-surrey-new-westminster 

Lets open a bridge without 2 wide emergency lanes or 2 wide shoulders. Especially make sure that it didn't open with enough space for 2 bus lanes and 2 HOV lanes. Of course don't design the Bridge to have a potential lower deck for trucks and trains. Its an instant classic BC bottleneck chokepoint! 

https://www.pattullobridgereplacement.ca/about/projectoverview Just like the SkyBridge, apparently, there was no need to open it with 2 bus lanes, despite the train not running 24/7.

Unfortunately, the Bridges_over_the_Fraser_River in the BC Lower_Mainland just weren't designed to have proper bus lanes. Its so strange that the narrow SkyBridge was_for_SkyTrain only. 

Just like the new tunnel between Richmond and delta, there is no provision for 2 train tracks. While there are 2 bus lanes, there won't be any exclusive HOV lanes. Eventually, there will have to be a proper train and rapid bus bridge or another tunnel beside it. 

https://www.highway99tunnel.ca/project-overview-frt "The Fraser River Tunnel Project includes a new, eight-lane immersed tube tunnel that will replace the existing George Massey Tunnel on Highway 99. The new tunnel will have three vehicle lanes and a dedicated transit lane in each direction, with a separated active transportation corridor for cyclists and pedestrians." 

Given that this is supposed to be a major port region, a train and rapid bus crossing needs to eventually be there. A train connecting YVR to the Tsawwassen Ferry terminal and 2 rapid bus lanes. Then the main tunnel could still provide 3 general lanes each way, plus a HOV lane each way. https://www.infrastructurebc.com/project/fraser-river-tunnel-project/  

Unfortunately, proper big city size infrastructure is a difficult thing to achieve in backwards BC. Since the decision was made to not have a rail component in the new highway99tunnel, the middle 2 bike lanes should have been wide enough to eventually become 2 rapid bus lanes. Then a new bridge or parallel tunnel could have a YVR to ferry terminal train, plus 2 truck lanes, 2 bike lanes an 2 sidewalks. 

This is what a proper big regional port crossing should be like, but for backwater BC, its a different set of priorities. 

Sunday, March 29, 2026

YVR-Canada Line and REM Train

 https://www.youtube.com/watch?v=a1ouk0VifwM&t=42s Even if the YVR-Canada Line had to initially be built as a symbolically small city train, urban transportation infrastructure can be designed in ways that can double or even triple capacity to meet future demand. Unfortunately, its very difficult to build anything in BC with significant future capacity in mind.

Ultimately, the YVR-Canada Line should have had level station clearances to eventually be able to accommodate 10 car trains. Unfortunately, in typical backwards BC planning the stations weren't even designed with enough level clearance to accommodate 5 car trains. The joke that is the Canada Line only has a level station clearance of 50m to eventually accommodate just a 2.5 car train. 

Most other cities actually build long stations to accommodate long trains right in the first place. Or, at least allow for enough level clearance so that the stations can eventually be doubled or tripled in length. 

The YVR-Canada Line should have started with the Vancouver & Richmond segment, then the Vancouver and Horseshoe+Bay+ferry+terminal segment. Then finally, the YVR to Delta and the Tsawwassen+ferry+terminal

The SkyTrain Stations in Greater Vancouver https://www.youtube.com/watch?v=6Qg78Bmf1fk

Unfortunately, proper big city transportation planning is very difficult to achieve in backwards BC. So much is watered down in Vancouver.


Montreal’s Biggest REM Expansion Yet https://www.youtube.com/watch?v=4G1oeIAfxDU&t=106s 

The Montreal REM https://www.youtube.com/watch?v=g9O6RzsXIqQ 

While the REM was designed to help the Metro, it should have the capability to be gradually expanded. Eventually, REM trains should be lengthened from 4 car trains to 6 and even 8 car trains. 

In contrast, every Skytrain line should have been designed with enough level future station clearance to eventually accommodate a train as long as a 152.5 (500 ft.) long Montreal Metro train. The first 2 Skytrain lines have 80m stations and the joke that is the Canada Line only has 50m stations. 

While the first 2 lines can accommodate 5 car trains, the C Line wasn't designed to accommodate 5 car trains. Just 2.5 car trains, someday. 

Despite there being such a symbolic push for Vancouver to keep having short trains, narrow bridges and stumpy buildings, things are gradually changing in backwards BC. The Vancouver or BC Mind Virus should have been challenged decades ago, but too many loud people wanted to perpetuate the, KEEP THINGS SMALL AND INDEQUATE agenda.

Given how most of the bridges in Greater Vancouver are so narrow, there isn't enough room for proper bus and HOV lanes, or even wide emergency lanes. One would think that at least the trains & stations would have been designed to eventually be doubled or tripled in length. But that would go against the mutigenerational congestive planning agenda. That's why there still is only a 3 lane LGB when there should have been at least a parallel bus, HOV and train tunnel. The Pattullo+Bridge replacement didn't open with 2 bus and 2 HOV lanes, not even wide shoulders or emergency lanes. NW really likes the congestive planning approach. Of course the new tunnel between Richmond and Delta won't have an additional provision for a train tube. This will also help to perpetuate the congestive transportation mandate. 

Fortunately, Selective_door_operation technology can eventually allow more sensible transportation planners to enable longer trains. 

https://en.wikipedia.org/wiki/Selective_door_operation#International_variations , https://www.youtube.com/watch?v=YdH5d1ZthmM 

This means that a 5 car Skytrain (85m) could eventually become a 7 car train, despite the 80m stations. 

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)_rolling_stock#Alstom_Mark_V Thus, an 80m train can become a 117m train.

A two car and 2.5 car (50m) train on the multibillion dollar Canada Line is so absurd and inept! With some slight station modifications, there could be a potential to eventually accommodate three, 20m cars at such short platforms. Then, once 3 car trains could become possible, its just a matter of having an extra 20m car at both ends of each train. A 5 car train of 100m is so much better than a 50m joke of a train. 

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)#Alstom_Mark_V_fleet 


https://jfdatalinks.blogspot.com/search?q=SkyTrain-Canada+Line

https://jfdatalinks.blogspot.com/search?q=REM

Friday, March 13, 2026

The Dunsmuir Tunnel in Downtown Vancouver, SkyTrain service to be reduced on weekends until June

https://dailyhive.com/vancouver/downtown-vancouver-skytrain-service-delays-weekends Had the old railway tunnel been originally designed to be double tracked, it could have been converted into a double level, 4 track LRT tunnel, instead of a 2 track LRT tunnel.

Ideally, if a subway or metro line doesn't have 4 tracks, 3 would be the next best thing. Then, 2 tracks could always remain operational while the 3rd is being repaired. For the most part, Skytrain is just a double track system. Unfortunately, the YVR-Canada Line is even single tracked at the end of the line in YVR and in downtown Richmond. 

The Canada Line should have been the 1st phase of an eventual south extension to Delta and the BC ferry terminal. Plus, a north extension from Waterfront_station_in Vancouver to Lonsdale_Quay and the ferry terminal. This would be a vital link between Canada_Line and the two regional ferry terminals. Unfortunately, Vancouver and BC are about maintaining congestion and transportation inefficiency.

Perhaps someday, if Vancouver is ever allowed to function like a proper big city, the Dunsmuir_Tunnel could be extended under Stanley Park and the 1st Narrows to Park Royal and to the ferry terminal. However, what's more likely to happen is that after the Dunsmuir_Tunnel reaches Waterfront_station, the line will continue east. 

https://evelazarus.com/the-dunsmuir-tunnel 

https://buzzer.translink.ca/2022/04/new-tunnel-technology-will-transform-your-skytrain-trip/ 

https://searcharchives.vancouver.ca/construction-progress-photo-of-cpr-dunsmuir-tunnel-10 

https://searcharchives.vancouver.ca/construction-progress-photo-of-cpr-dunsmuir-tunnel-9

Tuesday, February 24, 2026

Delays out of North Shore continue after truck stalls for hour on Lions Gate Bridge

 https://vancouver.citynews.ca/2026/02/24/stall-on-lions-gate-bridge-causing-massive-delays-out-of-north-shore/ 

The LGB bottleneck is indicative of how some people don't want Vancouver to become a properly planned functioning big city.

https://www.reddit.com/r/vancouver/comments/1mehud6/theres_a_single_car_stopped_in_the_only/

Unfortunatly, Vancouver still isn't allowed to function like a real proper big city. For several decades, so many key people, especially urban planners don't want to have a wider structural crossing to at least match what Prince George and Kamloops have. Or, to match what Kelowna has and especially don't want to have what Ft. McMurray has. 

Indeed, most proper major cities by now would have had a 6-8 lane tunnel right under the park and close to the LGB. Georgia Street is already 7 lanes wide in the first few bloks closest to the park, so the potential for a 7-8 lane tunnel should be possible.

An 8 lane tunnel would be best in that the 3 & 4 lane counterflow on Georgia could easily feed into an 8 lane tunnel. Then once in the tunnel there world be 3 standard lanes each way, plus a bus lane each way. 

A commuter train tunnel or an extension of the YVR-Canada Line should also run close to where the LGB is. Unfortunatly, some key people for several decades don't seem to want or understand the benefits of having a train connecting YVR with both of the regional bc-ferries terminals. That's because it could actually help to relieve transportation congestion. https://www.bcferries.com/current-conditions/TSA-SWB

It's always amazing to see what other cities around the world can do, simply because they aren't trapped within the backwards Vancouver mindset or don't have a backwater BC mentality to thwart them. 

https://www.th.gov.bc.ca/atis/lgcws/index.html 

This has to be one of the worlds best examples of bottleneck-chokepoint planning around. 

https://www.translink.ca/schedules-and-maps/skytrain A rail rapid transit connection to both ferry terminals and YVR would be a huge improvement, but it's still not likely in the foreseeable future.

Saturday, January 17, 2026

The Great SkyTrain upgrade (potential)

 https://www.youtube.com/watch?v=_D2CXdZ_4Ro 

Unfortunatly, the first 2 Skytrain lines were designed to only have 80m stations and trains. The 3rd line to YVR and Richmond was only designed to have 50m stations. In contrast, the Montreal Metro has stations long enough to accomodate 152.4m long trains. Thus, the greatest mistake was to not enable the Skytrain to eventually become a very high capacity train system. Combine that with mostly narrow bridges and roads in Greater Vancouver and you have the epitome of congestive urban planning. 

At least by late 2025 some of the new 5 car trains were out, along with some of the old 6 car little box trains on the 1st line. The 2nd and 3rd lines are still running 2 car joke trains, but that symbolically fits right in with the, KEEP BC SMALL AND BACKWARDS mentality. 

A proper big city long-term plan would have been to allow for 10 car trains, with at least 5-6 car trains at the start when each line opened.

Thursday, January 15, 2026

Early nightly closures at Oakridge-41st Avenue SkyTrain station for construction extended by two months

 https://dailyhive.com/vancouver/oakridge-41st-avenue-skytrain-station-early-closure-2026 

While some improvements are possible with the very short Canada+Line stations, there was a lack of vision to allow for enough level clearance to be able to double the length of the stations.

https://dailyhive.com/vancouver/skytrain-oakridge-41st-avenue-station-upgrade-design-renderings 

Indeed, the stations should have been at least 100m long, but only can be 50m. So instead of eventually having 5 car trains, only 2.5 car trains will be the maximum. WTH? 


https://jfdatalinks.blogspot.com/search?q=YVR-Canada+Line

Wednesday, January 14, 2026

SkyTrain's Canada Line service disruption

(service disruption ends after 14 hours) https://dailyhive.com/vancouver/skytrain-canada-line-service-disruptions-january-14-2026 

For a rapid transit line that opened in 2009, on the surface, it sure wasn't designed to be an efficient high capacity line for the future. It's still just a 2 car joke of a train. Fortunately, most real cities around the world planned for not only 6 car trains, but even 8-10 car trains. 

Unfortunatly, Vancouver has been hit very hard with a multigenerational agenda of continually imposed small scale infrastructure. Vancouver has water on 3 sides, as its on a peninsula. Since the powers that be couldn't build a Boundary+Road moat or trench, the next best thing was to symbolically show the reluctance to build proper big city size infrastructure. This stunted approach to things is about symbolically holding the scale of the city back for as long as possible. 

Despite backwards Vancouver not being able to apply a castle-moat-and-drawbridge control system, the next best thing was to symbolically keep things smaller than what normal or proper big cities allow. 

Here are some of the best examples of holding the size of things back. The 3 lane joke that is the Lions+Gate+Bridge has never had a rapid transit rail tunnel and no express bus tunnel next to it. Especially, no 6 lane highway tunnel. It's a classic BC bottleneck-chokepoint, by design.

From a 3 lane joke of a bridge to a two car Canada+Line joke of a train. It met the symbolic requirement to be shorter than the LRT in Edmonton, the C Train in Calgary and the trains in Seattle and Portland. 

The+Post+building+complex could have been Vancouver's first 50 story office tower, it's not even 25 floors. It would be impressive if it were in Victoria, Kelowna, Kamloops or Prince George. That's the unfortunate thing about Vancouver, so much is done to only be impressive to small cities or towns.  

https://jfdatalinks.blogspot.com/search?q=The+small+Westin+Bayshore+Hotel+in+Vancouver

Things have been kept so small in Vancouver throughout its history, that any big city stuff might seem overwhelming. There has been an unofficial KEEP THEM OUT mentality, but since the city cant have checkpoints, building things small symbolically demonstrates the perpetual reluctance to not allow a big city in backwater BC. 

Since Vancouver can't control Burnaby and can't stop Surrey from eventually becoming the biggest city in BC, they are able to build things on a larger scale than Vancouver.


https://jfdatalinks.blogspot.com/search?q=YVR-Canada+Line

Friday, January 9, 2026

Original cars on SkyTrain's Canada Line set to be refurbished

 https://dailyhive.com/vancouver/skytrain-canada-line-original-trains-refurbishment 

Perhaps allowing for enough future station clearance to accommodate 10 car trains would require too much forward thinking in backwards BC. However, this line should have been started with at least 5 car trains. Unfortunatly, the very short stations were only designed to accommodate 2.5 car trains. As of 2026, only 2 car joke trains are still being run.

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)#Canada_Line It's one thing to say that having very short stations can save on construction costs, but to not allow for significant future expansion defeats the purpose. Someone clearly didn't want the Canada_Line to eventually have proper, long big city trains. 

There still is hope that this Half-A$$ED, small-scale line can become a little closer to that of a proper big city train, someday. 

Feb 12, 2020 https://www.richmond-news.com/local-news/canada-line-continues-to-break-records-translink-3116818 "On an average weekday last year, the Canada Line had an average of 150,000 boardings, continuing to “outperform projections,” according to TransLink."

https://en.wikipedia.org/wiki/Canada_Line "During the 17 days of the 2010 Winter Olympics, the line carried an average of 228,190 passengers per day."


https://jfdatalinks.blogspot.com/search?q=YVR-Canada+Line


Wednesday, January 7, 2026

Metro Vancouver's SkyTrain transit system turns 40

 https://www.youtube.com/watch?v=VeSQtHusn1A  

The history of SkyTrain 1985-2025 https://www.youtube.com/watch?v=pEt76BgRP5E 

Expo Line Extension (Surrey - Langley) https://www.youtube.com/watch?v=CavX1TWYUsE 

Surrey Langley Skytrain Construction https://www.youtube.com/watch?v=yRARdwNIbls 

17 years and waiting for UBC SkyTrain https://www.youtube.com/watch?v=ZIEhFrTuqkc  

YVR-Skytrain: Canada Line https://www.youtube.com/watch?v=wvwFeKtbyxU

Tuesday, December 23, 2025

How air cargo is driving Vancouver International Airport's evolution and growth beyond passenger travel

 https://dailyhive.com/vancouver/vancouver-international-airport-yvr-cargo-freight 

Unfortunatly, the antigrowth crowd will always try to thwart the improvement and expansion of infrastructure. 

Tuesday, November 25, 2025

Airport Rail Links

The Transit Every Airport Needs https://www.youtube.com/watch?v=4YeVZVluQWI&t=247s 

https://www.upexpress.com/en/about-up/things-are-looking-up Its only a two and three car train, when it should be between 4-6 cars, depending upon the time of day. https://www.torontopearson.com/en/transportation-and-parking/up-express

At least it's not a perpetual 2 car train joke that is the YVR-Canada Line. The eventual airport REM line should consist of 4 car trains, but the entire REM should eventually have 6 car trains.

Somehow, Melbourne, Sydney, Brisbane & Perth all are able to have longer trains to the airport. The 10 car SFO-BART trains are pretty cool.

Wednesday, November 19, 2025

A Richmond encampment under the Oak Street bridge

 https://vancouver.citynews.ca/2025/11/19/growing-calls-to-clear-richmond-encampment 

Of course any neighborhood will be concerned when a bunch of people are living under a bridge and wandering around.

Living under a bridge is hardly affordable housing. There needs to be proper secure housing with plenty of security and staff to help people who are stuck living outside. 

That bridge is so narrow and inadequate. 

SW-Vancouver needs a proper transportation upgrade. Granville Street should be extended across the Fraser River on a parallel bridge to the Oak Street Bridge (OSB). Then, the 2 bridges could provide 4 general lanes each way. Plus, another 4-lane parallel bridge to accommodate 2 BRT lanes and 2 HOV lanes. 

Or, a totally built a new version of the Oak+St+Bridge that could provide 6 lanes northbound. Then, a Granville Street extension could provide 6 southbound lanes onto a new OSB. Four general lanes each way, plus a rapid bus lane each way & 1 HOV lane each way. 

For the most part, the Oak+Street-Granville+Street+Corridor has 12 lanes. A yellow paint strip designates 3 lanes each way. Instead, Oak could have 6 northbound lanes and Granville could have 6 southbound lanes. The 5th & 6th lanes could be for the Oak & Granville BRT lane & HOV lane on complete one way streets.

Unfortunately, the OSB remains as a 4 lane traffic bottleneck or chokepoint. 

The 2009 Canada (embarrassment) Line is still only using 2 car trains in 2025. A proper big city YVR-Canada Line should have been started with 5 car trains. Unfortunately, this joke of a train is only designed to ultimately run a 2.5 car train, someday. 

This stunted infrastructure approach is so absurd. Transportation planning in the most populated parts of BC is so inadequate, but its all part of backwards BC symbolism. The symbolism is all about showing a thwarted or watered down a city can be. Narrow bridges and short trains are some of the best ways to increase congestion and inefficiency in backwater BC.

The LA Metro's Airport Station is a Huge Success!

 https://www.youtube.com/watch?v=4TsUH1tmmBM , https://en.wikipedia.org/wiki/LAX/Metro_Transit_Center

https://en.wikipedia.org/wiki/Los_Angeles_International_Airport#Metro_Rail_and_the_LAX_Automated_People_Mover

https://www.flylax.com , https://www.flylax.com/lax-traffic-and-ground-transportation 

https://en.wikipedia.org/wiki/LAX_Consolidated_Rent-A-Car_Facility 

Although not as grand as a 10 car BART train, at least LA never opted to have a 2 car joke of an airport train like YVR has.  

Evolution of the Los Angeles Metro 1900-2028 https://www.youtube.com/watch?v=nH9toJw6-k8