Showing posts sorted by date for query backwards Vancouver. Sort by relevance Show all posts
Showing posts sorted by date for query backwards Vancouver. Sort by relevance Show all posts

Monday, November 16, 2026

Metro Vancouver highway closure could delay travel to BC Ferries this week

 https://dailyhive.com/vancouver/sea-to-sky-highway-99-closures-bc-ferries 

If only backwards BC had a proper transportation infrastructure mindset. Then a train might have already been running between the Horseshoe+Bay+ferry+terminal, YVR and the Tsawwassen+ferry+terminal.

Thursday, November 12, 2026

The Firth of Forth bridges

 https://en.wikipedia.org/wiki/Firth_of_Forth#Bridges 

All possible, because there is nothing like the BCMV there to hinder it.

https://604now.com/massey-bridge-vs-massey-tunnel-which-is-better-for-metro-vancouver/

Almost everything is more difficult to do in backwards BC.

Greta Thunberg now laughs at climate protests

https://nypost.com/2026/11/12/world-news/greta-thunberg-laughs-hysterically-when-told-fridays-for-future-climate-change-group-she-founded-still-protesting-they-still-do-that/

Unfortunately, it's no laughing matter for backwards Vancouver. The metropolitan region is stunted with its transportation infrastructure. While there was a serious concern between the late 1950s into the early 1970s about a few planned swaths of freeways, which would have torn Vancouver a series of gashes, something else happened. Bridges were kept narrow, or traffic lanes were removed. The ALB, Oak, Knight & Iron Bridges all should have had bus and bike bridges next to them, with enough space for truck lanes, because this is supposed to be a major port region. 

https://www.huffpost.com/archive/ca/entry/vancouver-has-canadas-worst-traffic-congestion-report_n_1959412

Decades of environmental extremism has held the city and region back from having proper big city infrastructure. Indeed, the environment has been used as an excuse to thwart and stunt the growth of the Greater Vancouver Region. 

While most of the imposed, KEEP THINGS SMALL agenda are within Vancouver, it's also in other parts of backwards BC. 

Somehow the Vancouver anti-freeway movement between the 1960s and 1970s, also prevented Vancouver from having wide enough bridges for a proper express bus network and especially an efficient regional BRT system. No LRT line between  Of course the trains are half or even a 3rd of the length of a proper big city train.

The few blocks of Georgia Street closest to Stanley Park are 7 lanes wide, it's all still funneled into the 3 lane Lions+Gate+Bridge. An 8 lane tunnel should have been built next to the LGB a few decades ago. Such a tunnel would not only provide 2 express or BRT lanes, but an extra section for LRT and trucks. 

The 6 lane Iron+Bridge should have also had a bus and LRT bridge built next to it decades ago. 

Vancouver seems to have a serious problem with bike+bridges, because the city hasn't built a proper series of bike bridges. Instead, the city has repurposed some traffic lanes from its limited bridges. While this might seem like a cheaper solution, it makes things more difficult to have bus lanes on those bridges. 

If a bike bridge was built next to the Burrard+Street+Bridge, it could have still had 6 lanes. Apparently, it was more important to have 2 bike lanes on the BSB than having 2 bus lanes with a bike bridge built next to it. 

Instead of widening the western sidewalk on the Cambie+Street+Bridge, so that there could be a bike lane and a footpath on each side, a traffic lane was repurposed for bikes. Having a 3rd lane each way on the CSB would have made it easier for buses. 

It's strange that the sidewalks on the Granville+Street+Bridge weren't made to be double their width. Then each side of the GSB could have a bike lane and a sidewalk. Half of each curb lane could have become built-up for a bike lane. Then there would still have been enough space to have a center traffic divider. Instead, the GSB & the BSB are set up for head-on collisions. 

If a 10 car train was considered to be too close towards big city size infrastructure, the YVR-Canada+Line still should have opened with 5 car trains. Instead, a cost saving measure meant that all of the underground stations can only accommodate a 2.5 car joke of a train. 

There is still no train link from YVR to the Horseshoe+Bay+ferry+terminal and YVR to the Tsawwassen+ferry+terminal. Indeed, there should have already been a train between the North_Shore, Downtown Vancouver, Richmond and Delta. 

https://604now.com/massey-bridge-vs-massey-tunnel-which-is-better-for-metro-vancouver 

https://upload.wikimedia.org/wikipedia/commons/e/eb/BC99_at_BC17_Aerial_-_Delta This should have been twinned or duplicated by the 1980s. 

The Pattullo+Bridge+replacement should have opened with 6 lanes, with a provision to become at least 8 lanes. Plus, having a lower deck for a future LRT crossing. 

https://vancouver.ca/parks-recreation-culture/vancouver-aquatic-centre-renewal.aspx A new 25 m pool, instead of a 50 m pool is another example of the VMV. It all fits in with the warped symbolism of keeping things stunted, small and backwards in Vancouver. Since a wall can't be built around the provincial backwater of a city, imposing smallness symbolism is the next best thing. 

Any carbon taxes in BC should have gone towards BC infrastructure. Instead, a few of the biggest cities in BC remain so far behind with transportation funding and development.

Unfortunately, the VMV and the BCMV keeps watering things down into a Half-A$$ attempt of big city infrastructure. The strange thing is, where has so much of the money gone? How come several other cities around the world are able to have the funds to build proper big city infrastructure? Well, they aren't hindered by anything like the Vancouver Mind Virus!

Incoming Premier Doerkson urges outgoing BC NDP government to halt any further new George Massey Tunnel commitments ahead of review for a bridge

 https://dailyhive.com/vancouver/incoming-premier-doerkson-urges-outgoing-bc-ndp-government-to-halt-any-further-new-george-massey-tunnel-commitments-ahead-of-review-for-a-bridge 

An 8-10 lane tunnel or bridge with a provision for an LRT section should have been built 3-4 decades ago. This 10 lane bridge should have been built at least a decade ago. Transportation infrastructure planning is such a sad joke in backwards BC. 

https://www.ctvnews.ca/vancouver/article/doerkson-calls-for-halt-to-massey-tunnel-replacement-until-options-finalized/

https://604now.com/massey-bridge-vs-massey-tunnel-which-is-better-for-metro-vancouver/

Wednesday, November 11, 2026

Is Vancouver is one of the best cities in the world for Gen Z?

 https://dailyhive.com/vancouver/vancouver-best-cities-for-gen-z 

Backwater BC has plenty of room for growth. For the young, the old and all those in-between. However, there has been a strong reluctance towards economic growth in BC, vs Alberta and Washington State. 

https://dailyhive.com/vancouver/vancouver-median-income-fraser-institute-report Unfortunatly, Vancouver and the metropolitan region have been thwarted and stunted for generations.

Provincial BC has yet to reach the same population as mountainous Switzerland.

https://www.mapfight.xyz/compare/british.columbia-vs-ch 

https://www.factmagazines.com/uae/the-best-cities-in-the-world-for-gen-z Of course the top 4 cities and the other 6 on this list have longer trains, wider bridges and taller buildings than what backwards Vancouver allows. 

Federal budget's $1.3 billion for Eastern Canada ferries sparks calls for more BC Ferries funding

 https://dailyhive.com/vancouver/canada-federal-budget-eastern-canada-bc-ferries-funding-criticism 

Perhaps some day Canada will start to be planned like a big country. In some ways Australia is already there. 

Canada doesn't even have 1% of the worlds population. It has yet to even accommodate half a percent of the human population, despite its size. 

In smaller, but warmer Australia, Sydney and Melbourne were the 2 major cities in Australia for a long time. Then Perth was allowed to have a wider bridge and taller buildings than what restrictive Vancouver allows. Even the trains are longer in Perth, just like in Seattle. 

Brisbane and the Gold Coast were allowed to have buildings that would even be impressive by Melbourne and Sydney standards. The Sir_Leo_Hielscher_Bridges provide a 12 lane crossing with easy access to the airport and the seaport. In contrast, provincial Vancouver only has 4 lane bridges to the airport. Greater Vancouver has been stuck with a 4 lane bottleneck-chokepoint tunnel to the Delta Seaport and Tsawwassen ferry terminal. Of course there is no train connection between the ferry terminal and YVR.

For the longest time, Canada only had 2 major cities. First, it was Montreal in the 1960s, then Toronto really took off by the 1970s. 

Halifax should have been a big bustling city on the scale of Montreal or Boston by now. 

Vancouver still has underground train stations that are shorter than the underground stations in Edmonton and Seattle. 

https://www.dictionary.com/browse/paint-oneself-into-a-corner That's the Vancouver, Greater Vancouver and backwards BC approach to things. The VMV and the BCMV.

Thursday, October 22, 2026

Wednesday, October 14, 2026

B.C. Court blocks demolition of Vancouver Aquatic Centre until Nov 3 (after civic election)

 https://cityhallwatch.wordpress.com/tag/vancouver-aquatic-centre-2 

The go backwards mentality really wants to have a 25 m pool, because a 50 m pool is big city infrastructure. Just like a 3 lane Lion Bridge, which still has no bus and LRT tunnel next to it. Of course Vancouver just had to have the shortest train in Canada and is still only running a 2 car joke of a train between Richmond, YVR and downtown Vancouver.

A 25 m pool, a 3 lane bridge and a 2 car train, are all fine examples of the KEEP VANCOUVER SMALL AND BACKWARDS MENTALITY. Classic stunted infrastructure thats right in line with the Vancouver Mind Virus VMV

Is Skytrain just a basic Airport People Mover?

https://cityhallwatch.wordpress.com/2026/10/13/skytrain-the-people-mover-that-could-by-lewis-villegas/ 

The biggest mistake about the Skytrain is not allowing enough future level clearance for proper long, big city trains and stations.

The Montreal Metro has a level station clearance of 152.5 m, or 500 feet. It would have costed a lot more in the long run if the stations were only about 66% or 33% of that length. Thus, it was better to build proper big city stations right from the start. Fortunately, the BC Mind Virus (BCMV) never made it to Quebec.

The first 2 Skytrain lines only have 80 m stations, when there should have been enough level clearance for twice that length. Unfortunately, the YVR-Canada Line is still running 2 car trains. All of the YVR-C-Line stations should have been built to accommodate at least 5 car trains. Unfortunately, the 80 m level station clearance can only accommodate a 2.5 car train.


https://en.wikipedia.org/wiki/AirTrain_JFK#Rolling_stock No one in any normal big city would even pretend that a short airport people mover could also do the job of a big city subway or metro system. Of course backwards Vancouver had to be different. 

Appeal court pauses Vancouver Aquatic Centre demolition until early November

 https://dailyhive.com/vancouver/vancouver-aquatic-centre-demolition-pause-bc-appeal-court-decision 

BC is 23 ties the size of Switzerland, but has less population. Greater Vancouver and especially the Lower Mainland of BC has the potential to be a properly planned big urban area. Despite the city of Vancouver having a slightly smaller area than Boston and SF, the size or scale of things in Vancouver are still significantly small than what's in Boston and SF. The city of Paris is only slightly smaller than the area of Vancouver, yet Paris has been able to have longer trains, wider roads and taller buildings. 

Unfortunately, the VMV with its propensity to keep things small, hold things back, or just take a backwards approach, is trying to prevent a new big city version of the Vancouver+Aquatic+Centre. While a 25 m pool might be impressive for PR, PG, Kamloops, Kelowna and Victoria, Vancouver should always have at least a 50 m pool complex, especially in the growing downtown area. 


Wednesday, October 7, 2026

Old Pattullo Bridge arches to come down this Thanksgiving weekend

 https://dailyhive.com/vancouver/old-pattullo-bridge-arch-deconstruction-process-october-2026 

Over a century ago, there was no concept of having bus lanes across a Fraser River bridge between NW and Surrey.

Even with the new bridge, there aren't 2 dedicated bus lanes. That's despite the Skytrain not being a 24hr system. So, busses have to be funneled into only 2 crowded lanes each way. Its been that way since the late 1930s on the old bridge, as well as the new bridge.

Apparently, in the 1930s, there just wasn't any big city vision to build a significantly wider bridge to better handle the future traffic in the 1960s & 70s. The new bridge should have been built in the 1980s or 90s. 

Now, little NW is still stuck with a narrow 4 lane bridge that doesn't even have 2 wide emergency lanes, or 2 wide shoulders, & especially no bus lanes. 

"A couple of Pacific Stage Lines buses can be seen at the BCER bus terminal." https://archives.newwestcity.ca/Results.aspx?AC=NEXT_RECORD&XC=/Results.aspx&BU=http%3A%2F%2Farchives.newwestcity.ca%2Fsearch.aspx&GI=&TN=internet&SN=AUTO80&SE=555&RN=8&MR=100&TR=0&TX=1000&ES=0&XP=&RF=WebStartDate&EF=&DF=WebFull&RL=0&EL=0&DL=0&NP=255&ID=&MF=GENERICENGWPMSG.INI&DT=&ST=0&IR=4702&NR=0&NB=0&SV=0&SS=0&BG=&FG=&QS= 

https://archives.newwestcity.ca/Results.aspx?AC=NEXT_RECORD&XC=/Results.aspx&BU=http%3A%2F%2Farchives.newwestcity.ca%2Fsearch.aspx&GI=&TN=internet&SN=AUTO80&SE=555&RN=7&MR=100&TR=0&TX=1000&ES=0&XP=&RF=WebStartDate&EF=&DF=WebFull&RL=0&EL=0&DL=0&NP=255&ID=&MF=GENERICENGWPMSG.INI&DT=&ST=0&IR=4702&NR=0&NB=0&SV=0&SS=0&BG=&FG=&QS= 

https://archives.newwestcity.ca/Results.aspx?AC=NEXT_RECORD&XC=/Results.aspx&BU=http%3A%2F%2Farchives.newwestcity.ca%2Fsearch.aspx&GI=&TN=internet&SN=AUTO80&SE=555&RN=37&MR=100&TR=0&TX=1000&ES=0&XP=&RF=WebStartDate&EF=&DF=WebFull&RL=0&EL=0&DL=0&NP=255&ID=&MF=GENERICENGWPMSG.INI&DT=&ST=0&IR=4702&NR=0&NB=0&SV=0&SS=0&BG=&FG=&QS=

https://www.surreyhistory.ca/pacificstage.html 


Even the old Port_Mann_Bridge wasn't designed to have 2 bus lanes, just 2 lanes each way with no emergency lanes, or wide shoulders.

https://en.wikipedia.org/wiki/Port_Mann_Bridge#Original_bridge Once a 5th lane was squeezed onto the narrow bridge, a parallel 5 lane bridge should have been built. Plus, an extra 2 lane section for express buses and a lower deck provision for future LRT. 

https://en.wikipedia.org/wiki/Port_Mann_Bridge#Opposition_to_twinning_plan Unlike in Australia, bridge duplication or twinning is culturally difficult in backwards BC. 

https://en.wikipedia.org/wiki/Port_Mann_Bridge#New_bridge While the new bridge has 10 lanes and can eventually accommodate an LRT line, there should have been a provision for 2 express bus lanes. That's because there is no 24 hour LRT service in Greater Vancouver. 

When a train is shutdown for the night, or there is an emergency that stops service, there should always be a high capacity, or rapid bus route in place. 

Its very difficult to have a proper regional express bus network in Greater Vancouver. Especially, a proper regional BRT system. That's because most of the bridges are so narrow there isn't enough space for 2 bus lanes. 

Since LRT and subways can't cover the entire urban area, the region also needs to have an extensive network of express buses and BRT lines. That can only be accomplished in Greater Vancouver by having a series of bus-bridges. 

https://movementyvr.ca/what-even-is-a-brt


https://jfdatalinks.blogspot.com/search?q=BRT

Friday, September 11, 2026

How the City Rail Link Transforms Auckland's Train Network while Vancouver is trapped by the BCMV

 https://www.youtube.com/watch?v=OmtSI3N57kM Auckland, like Brisbane, Sydney, Melbourne, Perth, Seattle, Edmonton, Toronto & Montreal... are just some of the cities that get to have longer train than provincial Vancouver.

https://en.wikipedia.org/wiki/City_Rail_Link  

"Although the trains are capable of having extra cars added in groups of three, the CRL station platforms, as originally specified, would not be long enough to accommodate nine-car trains. The proposed new capacity is 54,000 passengers per hour with the station platforms to be made longer so they can take the longer trains..." https://en.wikipedia.org/wiki/City_Rail_Link#Capacity_forecast_forces_platform_enlargements 

9 car trains are possible for Auckland, because there isn't anything like a Vancouver Mind Virus (VMV) to thwart it. 

https://www.cityraillink.co.nz/meet-your-stations 

https://en.wikipedia.org/wiki/Waitemat%C4%81_railway_station#Capacity Proper big city infrastructure planning and development, unlike backwards Vancouver.

https://en.wikipedia.org/wiki/Waitemat%C4%81_railway_station#Electrification 


In contrast is the joke that is the two car Canada_Line. There was a deliberate decision, (apparently to save money) to not have a future station level clearance of at lest 100 m, if not even 160 m. So instead of planning for at least 5 car trains, there is only enough space for a 2.5 car joke of a train, some day.

https://en.wikipedia.org/wiki/Canada_Line#Stations "The five busiest stations have platforms 50 metres (160 ft) long, while the rest of the stations have 40-metre (130 ft) platforms that can be easily extended to 50 metres." 

Being that this is a line which could eventually link YVR to the Tsawwassen Ferry Terminal & eventually Waterfront station with Park Royal and even the Horseshoe Bay Ferry Terminal, the BC Mind Virus (BCMV) got in the way.

https://en.wikipedia.org/wiki/Canada_Line#Technology "The capacity of the trains is estimated at 334 people per pair of cars (comfortably) or 400 people at crush load." 

Since each car is 20 m and the stations are designed to a maximum of 50 m, every effort should be made to try to eventually have 60 m platforms. Unfortunately, it might be difficult enough just to try to gradually have 55 m stations. Still, the initial goal should be to try to have a 3 car train of 60 m. 

Then with Selective+Door+Operation, a 3 car train could become a 5 car train. Its unfortunate that there is such bad transportation planning in Greater Vancouver. Compared to backwards Vancouver, its great that nothing like a VMV has prevented Auckland from eventually having 9 car trains. The Montreal Metro and the Stockholm Subway can also have 9 car trains. Unlike Vancouver, several cities have no problem thinking big.

Auckland is so far away from the backwards mentality of Vancouver. Thus, Auckland is allowed to have longer trains than provincial Vancouver and taller buildings and even a wider harbor bridge. Of course the same can be said about Sydney and several other cities. 

Thursday, September 10, 2026

The Dutch Are Replacing This Entire Bridge — By Moving It

 https://www.youtube.com/watch?v=eS8jNDgBr9A 

https://en.wikipedia.org/wiki/Van_Brienenoord_Bridge 

Wow, no VMV or BCMV was able to get the Dutch to reduce the 12 lane Van_Brienoordbrug_Bridge back to a 6 lane bottleneck, or even a 4 lane chokepoint. 

If you are Dutch and Visit Vancouver & Victoria, BC, you will be shocked as to how scaled back the infrastructure is. So far, no 12 lane crossing has been allowed in BC. Yet, for the Dutch, big city transportation infrastructure isn't a problem. 

BC is 23 times the size of Switzerland, but doesn't even have the population of one CH. 

Its very difficult to think big and tall in backwards BC. Thus, it takes a long time for big things to get approved and completed.

https://canada.constructconnect.com/joc/news/projects/2026/09/vancouver-city-council-approves-trio-of-tall-towers

Monday, August 31, 2026

VMV and BCMV

What is the Vancouver Mind Virus and the BC Mind Virus?

Sometimes, it can be a provincial backwater approach to things. Other times, its a total Half-A$$ED attempt towards getting something done in backwards BC.

Its taken the City of Vancouver a very long time to surpass half a million residents. Its amazing that Vancouver finally surpassed having 3 quarters of a million people. 

https://worldpopulationreview.com/cities/canada/vancouver 751,644 

It remains to be seen if Vancouver will ever have more people than Winnipeg. Indeed, Winnipeg, like Edmonton and Calgary don't have something like a Burnaby next to them, or a Surrey & Coquitlam close by. While Vancouver barely makes it into the top 10 biggest cities in Canada, Greater Vancouver is still the 3rd largest urban region in Canada. However, so much of the urban scale and infrastructure is being heled back.

The biggest cities in Canada don't have anything like a VMV to thwart or impeded their scale. Thus, Toronto, Calgary, Montreal & Edmonton all have taller buildings than stunted Vancouver. Edmonton and Montreal, like Seattle and Perth, WA are allowed to have wider bridges. Most major cities around the world have longer trains than what's in provincial Vancouver.

Is there a Canadian Mind Virus (CMV)? Of course not officially. Fortunately, nothing like a CMV ever made it to Australia. Otherwise something absurd like provincial Trade Barriers could have really thwarted things down under.

https://www.cbc.ca/news/politics/interprovincial-trade-barriers-9.7323970 

https://www.mnp.ca/en/insights/directory/what-are-the-barriers-to-interprovincial-trade-in-canada

https://www.canada.ca/en/intergovernmental-affairs/services/internal-trade/federal-investments-internal-trade.html 

Despite Canada being surrounded by water on 3 sides, there is no blue on the national flag. Fortunately, nothing like a CMV ever got Australia, NZ, the UK, France and even the US to remove blue from their flags. 

Of course the flags of England, Switzerland and Japan have no blue in them, but blue is still a very nice color to behold. 

Nothing on the scale of the 10 lane Narrows_Bridge_(Perth) is allowed in Vancouver, Victoria or Kelowna. Certainly, nothing like the Sir_Leo_Hielscher_Bridges exists in Halifax. Even Boston and Montreal don't have a 12 lane crossing like the Gateway_Bridges. 

Despite Australia having fewer people than Canada, its been able to exist on a larger scale in some ways. Its like there is still a plan to have a big country down under.


https://jfdatalinks.blogspot.com/search?q=VMV

https://jfdatalinks.blogspot.com/search?q=BCMV

Why New York City has a Two-Car Subway Train and provincial Vancouver is stuck with a 2 car airport train

 https://www.youtube.com/watch?v=xH37SqlW0Ks 

https://en.wikipedia.org/wiki/Franklin_Avenue_Shuttle 

https://en.wikipedia.org/wiki/R68_(New_York_City_Subway_car) 75-foot (22.86 m) length for each car. So roughly, a 2 car joke of a train is almost 46 m, or 150 ft. The absurd Canada_Line-Stations with its 2 car trains are in the 40 m to 50 m range. Thus, only two car & 2.5 car trains are only possible. In contrast, a 9 car Montreal_Metro train can be up to 152.5 m, or 500 ft.

Train length
  • 2 car train: 150 feet (46 m)
  • 4 car train: 300 feet (91 m)
  • 8 car train: 600 feet (180 m)

https://en.wikipedia.org/wiki/R68_(New_York_City_Subway_car)#Description So, an 8 car, 600 foot long train is 100 feet longer than a 500 foot, 9 car Montreal train. 

The end of the line for the Franklin_Avenue_Shuttle is only a single track platform. 

Unfortunately, the YVR and the Richmond end if the Canada_Line stations are also a single track platforms. Even if this was initially decided as a cost saving measure, a double track guideway still should have been built. Then, a proper double track station could eventually be completed. Especially if the line is ever extended to the Delta Ferry terminal.

The YVR-Airport_station was deliberately designed to be narrower and shorter than what a proper big city airport station should be. Its another example of the unofficial BCMV reducing and thwarting the scale of things. 

https://en.wikipedia.org/wiki/Pearson_Airport_station Almost like REM quality for Toronto, but not for provincial Vancouver. https://www.upexpress.com/en/up-express-stations/pearson-station , https://www.torontopearson.com/en/transportation-and-parking/up-express Wow, Toronto like Perth can run 3 car big city type trains. https://en.wikipedia.org/wiki/Union_Pearson_Express#Rolling_stock Vancouver can only hope for a 2.5 car train, someday. 

https://en.wikipedia.org/wiki/Union_Pearson_Express#Route Sometimes, a 2 car joke of a train might be OK to start with, but there should already be enough station clearance for at least 3-5 car trains. Then, as long as its a walk-through train, Selective_Door_Operation (SDO) can make it possible to add an extra car at both ends of a short train. SDO can be an intermediate step before having to extensively lighten each station. 

Stubborn, backwards Vancouver will eventually have to seriously consider SDO in order to have longer big city type trains. Unfortunately, as long as its stuck in the BC backwater mentality or under the spell of the BCMV, things won't improve.

https://canada.constructconnect.com/dcn/news/projects/2026/05/montreals-airport-rem-station-will-have-signature-iceberg-motif , https://montrealgazette.com/news/rem-has-begun-testing-trains-on-airport-branch Of course the YUL-P.E. Trudeau_station, like the Honolulu Airport station, will be longer and wider than the one at YVR.

Perhaps the short, single track & platform at the YVR-Airport_Station would be impressive if it were in Victoria, Prince George, Kamloops or Kelowna, but its hardly impressive when compared to the SeaTac/Airport_station, Portland_Airport_station, Lelepaua_station in Honolulu, Brisbane_Airport station, Sydney_Airport stations, the future Melbourne_Airport station and Perth_Airport station. The scale of the San_Francisco_International_Airport_station, which can accommodate 10 car trains, is on a whole other scale. All major airports and their train stations in Asia & Europe are so far beyond what Canada has. There is no reason as to why Greater Vancouver and some other cities in BC, can't be upgraded to a Pacific Rim infrastructure level, instead of  being stuck in a perpetual BC backwater mindset. 

The VMV, under the umbrella of the larger BCMV, is such a horrible impediment and it doesn't even officially exist. 

Saturday, August 29, 2026

Vancouver International Airport (YVR) is Getting MASSIVE Upgrades

 https://www.youtube.com/watch?v=XQw18DQ4TlY MA$$IVE Upgrades? Compared to what, other provincial backwaters? 

SkyTrain Front Window View - Canada Line to YVR https://www.youtube.com/watch?v=WxTEBfxYH0g This is very sad & pathetic that the stations weren't designed to be long enough to accommodate a 5 car train. The stations can only accommodate a 2.5 car joke of a train. The real sad joke is that the line is still only running 2 car trains on what is supposed to be a major urban area on the Pacific Rim.

Unfortunately, even if Vancouver-Surrey & Abbottsford, Victoria & Nanaimo, Prince Rupert & Kitimat were all upgraded to proper big urban areas on par with Melbourne, Sydney & Brisbane, or even Seattle & Calgary, BC just isn't as warm as Australia, or even NZ for half of of the year. Edmonton & Calgary, Seattle & Portland are able to have wider bridges & roads, and even longer trains than Vancouver to Richmond & Vancouver to Surrey-Langley. 

Fortunately, the Pacific Rim part of Australia hasn't been trapped in a provincial backwater mentality like the Pacific Rim part of Canada. For too long there has been a keep BC small and backwards mindset. AKA, the BC Mind Virus (BCMV).

Running short & frequent trains could be seen as a cost saving measure initially, but unless there is a genuine to have proper long big city type trains, the BCMV still wins out. The fanatical approach to keep most of the bridges in BC so narrow has made it very difficult to have a proper regional express bus network, let alone BRT. 

The 3 main seaport regions of BC, Greater Vancouver, Victoria-Nanaimo-Kitimat should become proper big city ports on the Pacific Rim. BC is 23 times the size of Switzerland, yet it doesn't even have the population of 1 CH. Canada in turn, has less than half of 1% of the worlds population. 


Monday, August 24, 2026

BRT in backwards BC

 Of course Greater Vancouver really needs a big city BRT network, but unless a proper series of bus and bike bridges are built, its all just a Half-A$$ED joke of an attempt.

https://www.pattullobridgereplacement.ca/about/projectoverview Of course the new bridge opened without any express bus lanes, especially no BRT corridor. Yet, Skytrain isn't a 24hr system, but a bus can be.

https://www.railforthevalley.com/latest-news/translinks-hype-and-hoopla-about-brt-is-just-another-wet-squibb 

https://www.railforthevalley.com/tag/brt 


https://jfdatalinks.blogspot.com/search?q=BRT

Saturday, August 22, 2026

The 14 lane George Washington bridge vs...

 https://www.youtube.com/watch?v=tH6Q8yWjYpM There are wider sections of freeways in the US, but the double deck GWB has the most lanes. 

Wow, in backwards Vancouver, or almost anywhere in backwater BC, just having 2 lanes each way is tough enough. A consistent 3rd lane each way could be for busses and a 4th lane for HOVs. Given that Greater Vancouver is supposed to be a major port region, several of the bridges should also have a truck lane each way. However, there is only one bridge in backwards BC that has 5 lanes each way. 

https://en.wikipedia.org/wiki/Port_Mann_Bridge#New_bridge Unfortunatly, it wasn't designed to have a lower deck. Such a lower deck could have had 2 freight train tracks, 2 commuter train tracks and even a provision for 2 BRT lanes. 

Essentially, in any proper big urban area, the bridges should not only provide at least 3 general lanes each way, but a bus and HOV lane each way. That's 5 lanes each way, plus on some crossings that are closer to port activity, there should even be a 6th lane each way. That's the case with the Sir_Leo_Hielscher_Bridges. Unfortunately, unlike Queensland, BC has been very reluctant towards bridge duplication or twinning. 

https://www2.gov.bc.ca/gov/content/transportation/driving-and-cycling/traveller-information/routes-and-driving-conditions/hov-lanes 

https://www.nsnews.com/local-news/bus-hov-lanes-different-2918490

https://www.reddit.com/r/vancouver/comments/1d3fixq/hov_and_bus_lanes_how_to_deter_abuse/ 

While Australia has Melbourne, Sydney and Brisbane as its major Pacific Rim gateways, Canada just has provincial Vancouver, Victoria and Prince Rupert as port gateway cities. 

https://en.wikipedia.org/wiki/Sir_Leo_Hielscher_Bridges#Design

https://upload.wikimedia.org/wikipedia/commons/thumb/6/6e/Gateway_Bridge_aerial4.JPG

https://en.wikipedia.org/wiki/Sir_Leo_Hielscher_Bridges#Duplication A 12 lane crossing.

The Port_of_Brisbane and the Brisbane_Airport are excellent port facilities in Queensland. 

https://en.wikipedia.org/wiki/Port_of_Brisbane#Facilities

https://en.wikipedia.org/wiki/Brisbane_Airport#Rail Far away from the inept transportation planning in Greater Vancouver, Brisbane was able to do things correctly.

https://en.wikipedia.org/wiki/Airport_line,_Brisbane Unfortunatly, backwards BC just can't seem to properly plan big city type infrastructure.

The YVR-Canada_Line is a total embarrassment! 

https://en.wikipedia.org/wiki/Canada_Line#Stations Not 150 m, not 100 m, only a 50 m level clarence was allowed for the stations. Even the first 2 Skytrain lines only have 80 m stations, when they should have almost been twice as long. 

https://en.wikipedia.org/wiki/Canada_Line#Technology Aparently, the inept planning was due to cost saving measures. Thus, instead of designing the stations to be long enough to accommodate 5 car trains, they were only designed to ultimately have 2.5 car trains. Since 2009, the Canada_Line still only has 2 car joke trains. 

The Tilikum_Crossing in Portland vs the North_Arm_Bridge between Vancouver and Richmond. The Tilikum_Crossing accommodates 2 bike lanes, 2 footpaths, 2 MAX-LRT tracks, 2 articulated_bus lanes and even streetcars can cross on it. Such a fine bridge just hasn't been allowed in BC.

https://upload.wikimedia.org/wikipedia/commons/thumb/3/35/NorthArmBridge.jpg 
https://en.wikipedia.org/wiki/North_Arm_Bridge#Details This bridge should have been wide enough to eventually accommodate 2 bike lanes, 2 footpaths and especially, 2 BRT lanes, the the Skytrain doesn't run on a 24hr schedule. 

Given that most of the bridges in BC are so narrow, there needs to be proper bus, bike & HOV bridges built.

Transportation infrastructure doesn't have to be such a sad joke in backwards BC. 

Friday, August 21, 2026

Vancouver PNE vs...

 https://dailyhive.com/vancouver/vancouver-pne-fair-weekend-playland-aug-2026 

At the same time that the madness of Vancouver was making the PNE smaller, the CNE was allowed to grow in size. If anything like a Vancouver Mind Virus had an influence in Toronto, the city would have become a backwards mess. 

https://www.tourguys.ca/post/cne-vs-canadas-wonderland-best-toronto-theme-parks-for-kids-teens-families-2025-guide 

In 1981 Canada's Wonderland had just opened. But the CNE is also on. Which one do you decide to go to - the shiny new theme park or a Torontonian classic? https://www.youtube.com/watch?v=ItiWGErRyZM

Toronto would go onto becoming as big as Chicago. However, the GTA still isn't quite as big as the overall Chicagoland Area. Vancouver is still stuck in its provincial backwater trap mentality.