Sunday, May 26, 2024

The Pattullo Bridge replacement now delayed by 1 year

 https://dailyhive.com/vancouver/pattullo-bridge-construction-opening-delay-2025

https://www.cbc.ca/news/canada/british-columbia/pattullo-bridge-delays-1.7215198

https://www.pattullobridgereplacement.ca/construction/current-works/

The new PB should open with 6 lanes with a provision to have at least 8 lanes. A 4th lane each way could be a nice bus & HOV corridor. But once again, everything will be funneled into a 4 lane BC bottleneck.

https://www.surreynowleader.com/local-news/pattullo-bridge-replacement-delayed-again-now-projected-to-open-in-2025-7364978

https://globalnews.ca/news/10523439/broadway-subway-pattullo-bridge-delay/

Since the Skytrain isn't open 24hrs, 2 bus lanes should have been part of the bridge right from the start. Its sad that the multigenerational BC mentality never allowed for a much wider SkyBridge. Fortunately, Oregon was able to build their fantastic Tilikum_Crossing, because it doesn't have anything like the BC mentality to thwart it. 

Of course the Skybridge was never designed to have bus & bike lanes, but that's something Portland would eventually do. The extremely narrow SkyBridge should have been designed to not only have 2 bike lanes, but 2 bus & 2 HOV lanes to take some of the pressure off the old PB, as well as its replacement. But that would conflict with the narrow minded, multigenerational backward BC mentality.

After all these decades, backward BC still wants to make sure that there is no provision for a streetcar or a tram-train between Surrey & NW. That's despite Surrey eventually becoming the largest city in BC. 

https://en.wikipedia.org/wiki/Skybridge_(TransLink) The narrow minded BC joke of a transit bridge.

https://en.wikipedia.org/wiki/Tilikum_Crossing Perhaps, the most amazing bridge in Oregon. https://trimet.org/tilikum


https://jfdatalinks.blogspot.com/search?q=NW