https://www.vancouverisawesome.com/highlights/capstan-canada-line-station-in-richmond-to-open-friday-9984359 Why design the old & new stations to eventually accomodate 8-10 car trains? The Catheter Line wasn't even designed to officially accommodate enough space for 5 car trains. Thus, in accordance with the BC antigrowth mentality or slow growth agenda, the stations were only designed to eventually just have 2.5 car trains. However, even in 2025, the Catheter Line will still only be using 2 car trains. All the SkyTrain stations should have been designed to eventually be 150.5 meters long, just like the Montreal Metro stations, with even more long-term provisions. Unfortunatly, the first 2 lines only have 80m stations & the C Line only has a clearance for 50m stations.
https://dailyhive.com/vancouver/skytrain-capstan-station-canada-line-opening-date
It's been very difficult to get urban planners in BC to properly plan for future transportation demands. The main excuse is governmental budgetary constraints. Even if that's usually the case, at least build half the length of a proper size urban station, with a provision to eventually double or triple its length, for future demand. However, that would go against the Greater Vancouver congestion planning mentality. Thus, even if you have the skills, once you get to BC, you realize that several things are watered down & you must think small or backwards.
https://bc.ctvnews.ca/video/c3050886-metro-vancouver-facing-population-boom With the Metro-Vancouver-population-expected-to-reach-4-million-by-2045, BC is so unprepared & inept, as usual. https://www.kelownacapnews.com/news/metro-vancouver-expected-to-push-past-4-million-by-2045-as-growth-accelerates-7717888
There seems to be an outright refusal in the Metro Vancouver Region to avoid building up to the same level of infrastructure as when Greater Toronto, Greater Montreal, Greater Seattle, Greater Sydney, Greater Melbourn & the SF Bay Area, all exceeded 4 million people.
Going into 2025, the SkyTran will still only have 2-4 car trains, not counting the old Mark 1 rolling stock. By 2025, every SkyTrain should have consisted of 6-8 car trains, not the two-car & four car congested joke that it is.
There is no valid reason as to why the Greater_Vancouver Region can't eventually have an urban train system on par with the Montreal Metro & a regional train system that's as good & frequent as the GO Trains or the Caltrain.
The refusal to build proper bus & truck bridges to help the mostly narrow bridges, still seems to be a half-assed pipedream. Yet, the GV Region pretends that it will eventually have a good Rapid Bus Network without bus-bridges.
While the GV Region is supposed to be a major seaport, there is still a false_front approach to things. How can this false-front & half-ass approach still be the norm in backwater BC? Not only should all the freight-train bridges be at least double tracked, there should also be truck port bridges.
The Oak_Street_Bridge, Knight_Street_Bridge & the Queensborough_Bridge are all so narrow, there is no room for truck & bus lanes. Therefore, a truck & bus bridge should be built next to all of them. Otherwise, everything can just continue to be funneled into only 2 lanes each way.
Of course the Arthur_Laing_Bridge wasn't designed to have 2 bus lanes & 2 truck lanes. Yet, a lot of trucks have to be able to get in & out of YVR. Why have any bus lanes when busses & trucks can all be funneled into only 2 lanes each way? Even though the C-Line doesn't run 24hr a day, the North_Arm_Bridge should have had two 24hr bus lanes & 2 bike lanes & a provision for a middle track. Instead, the narrow North-Arm-Bridge only has 2 tracks & just 1 bike lane.
Fortunately, Greater Vancouver & backward BC hasn't been able to get most place around the world to adopt such a ridiculously reduced infrastructure approach to things.