Using the limited funds and low capacity argument is excrement! It's only because of inept urban planning that the Canada+Line is such a transportation embarrassment & sad joke since 2009. Several other cities around the world are able to think big, they plan & build in a long-term way. Thus, if there are only enough funds to build a 2.5 car train, the stations could have been designed to eventually accomodate 5 car trains as demand increases. Plus, all the stations should have been designed with enough clearance to gradually be long enough for 10 car trains.
An ultimate capacity of 10 car trains connecting both ferry terminals with the airport & downtown Vancouver, would really have been properly planning for the future. 10 car trains running every 2 minutes during the busiest times of the day would efficiently allow a lot people to get around. Unfortunatly, it will be challenging enough just to eventually have 5 car trains.
https://dailyhive.com/vancouver/canada-line-skytrain
The absurdity to design the stations to only handle 2.5 car trains is a sad joke. The ultimate capacity of two 20m cars with a 10m filler car is so inadequate & pathetic, but this is the BC part of Canada. This backwards & backwater thinking must be challenged.
https://dailyhive.com/vancouver/skytrain-future-station-locations
With some modifications, three 20m cars could form a 60m train, despite the absurd platforms only having a clearance for 50m. A 60m walkthrough train makes this possible, its just that the doors at either end wouldn't reach the short station platform. Selective_door_operation could enable the Canada Line to go from a 2 car & 2.5 car joke, to a 3 car & ultimately, a 5 car train. That's still a far cry from cities with 10 car trains running every 2 minutes. However, a 5 car train running every minute could make all the difference for Greater Vancouver.
https://www.cbc.ca/news/canada/british-columbia/what-you-need-to-know-north-shore-wastewater-treatment-plant-1.7235368# Aparently, there is enough money to overpay for a $HIT-PIPE and a $HIT-BOX, but not enough funds to build a proper high capacity train over a couple of decades.
The Canada_Line opened in 2009 with its short 2 car trains & in 2025, there still aren't any 2.5 car trains. By now, it really should have been running 5 car trains, connecting the 2 ferry terminals & the airport. Fortunately, most real cities are able to do proper long range planning for their infrastructure, unlike backwards Vancouver.
https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)_rolling_stock#Canada_Line_fleet
There should have been enough informed people to not only make sure that the C+Line was properly designed, but that the whole Greater Vancouver Region had proper planning measures for future transportation infrastructure capacity. Unfortunatly, backwards BC has been under a multi-generational backwater agenda.