Its one thing to build a line with stations that are only a 3rd of the length of a Montreal Metro station, but to no not properly allow for enough future level clearance is so inept.
https://en.wikipedia.org/wiki/Selective_door_operation#International_variations
https://dailyhive.com/vancouver/skytrain-canada-line-rebuilding
https://dailyhive.com/vancouver/canada-line-skytrain This and the 3 lane Lion Bridge should get an award for the blatant symbolism of not wanting to build proper big-city infrastructure in backwards BC.