Showing posts sorted by date for query The Pattullo Bridge replacement. Sort by relevance Show all posts
Showing posts sorted by date for query The Pattullo Bridge replacement. Sort by relevance Show all posts

Monday, April 27, 2026

Old Pattullo Bridge and its Still Narrow Replacement

 https://www.youtube.com/watch?v=8_mNfn4zjcI 

Even in the 1930s there should have been some type of a big city vision, but with NW being so small and Surrey being so out of the way, this part of BC was on the urban periphery. Apparently, there was no concept of an emergency lane on the Pattullo Bridge. Still, in addition to the 2 narrow lanes each way, there should have been 2 lane for horses and wagons. Then, by the 1950s the PB could have had 3 wide lanes each way, pulse a strong traffic divider. Instead, the narrow PB was stuck with only two lanes each way, no safety divider and only 1 narrow sidewalk.

For most of its history, NW just saw it self as a provincial backwater. The lack of a big city vision in the early 1900s meant that it never bothered to absorb what would become the Tri-Cities. For most of its history, Surrey never considered that it could eventually become the largest city in BC. Of course now that has changed.

Despite being so small, NW has become a Metro Vancouver regional transit hub, because of the New_Westminster_station

Scott_Road_station is a transit hub for the South_Westminster area.

Surrey and NW really should have had a proper big city size bridge.

This is how the new road configuration could have gone for what should have been a 10 lane bridge, not another 4 lane BC joke. Even if it can eventually have 6 lanes, there is no provision for a lower deck for trains and busses.

This shows how existing key roads could have linked into a 10 lane bridge, all without having to widen the surrounding roads. Thus, no need for any major land expropriation.

2 lanes from Royal Avenue onto the new bridge and 2 lanes from the bridge onto Royal Avenue in New+Westminster.   

One lane onto and one lane off linking the bridge to the South_Fraser_Perimeter_Road in Surrey.

2 lanes onto McBride boulevard and 2 lanes onto the bridge from McBride in New+Westminster.  

From Columbia_Street_in New_Westminster, 1 lane onto the bridge, as well as 1 lane off the bridge

2 lanes from King_George_Boulevard onto the new bridge and 2 lanes from the bridge onto KGB in Surrey

2 lanes from Scott Road onto the new bridge and 2 lanes from the bridge onto Scott_Rd in Surrey.  

Things weren't properly explained to the public as to how important a wide big city bridge could have been possible and without having to widen the roads connecting to it.

Unfortunately, all of this is being funneled into just 2 lanes each way. Its as if someone symbolically wanted the new bridge to open without any bus and HOV lanes. That's how BC bottleneck and chokepoint planning works. 


https://en.wikipedia.org/wiki/Metro_Vancouver_Regional_District  

https://en.wikipedia.org/wiki/Fraser_Valley

Some day, the BC Lower_Mainland should be planned and developed to function more like a proper big urban area. 

Thursday, April 2, 2026

The Pattullo Bridge replacement, so far

 https://www.pattullobridgereplacement.ca/construction/bridge-opening/ 

There are still months of finishing touches.

https://www.pattullobridgereplacement.ca/construction/current-works/ 

Over the course of the year, many more people will start to realize that despite there being adequate bike lanes, there are no bus lanes, no wide shoulders and especially no emergency lanes. Its currently still too narrow for all of that.

https://www.reddit.com/r/SurreyBC/comments/1omufv6/the_new_pattullo_bridge_will_gradually_open_to/  

In fact, the bridge was deliberately designed to be so narrow that there is only enough future deck space for either 2 bus lanes or 2 emergency lanes, but not both. For now, its just another 4 lane BC funnel.

https://www.google.com/maps/place/New+Westminster,+BC 

No lower deck for a potential truck connection between Surrey and Front Street and especially, no lower deck for a future LRT crossing.

https://www.vancouverisawesome.com/highlights/pattullo-bridge-renamed-stalwasm-set-to-open-soon-11595501

It seems that whenever its possible, a 4 lane BC bottleneck-chokepoint is all that's necessary.

https://www.reddit.com/r/SurreyBC/comments/1rb4nmd/bus_connect_surrey_and_coquitlam/ 

It really would be a good idea to eventually have a couple of bus lanes on that bridge, especially since the Skytrain doesn't run 24 hours a day.

https://www.google.com/maps/place/New+Westminster,+BC/@49.2037496,-122.8791442,674m/data=!3m1!1e3!4m6!3m5!1s0x5485d8753ddb5097:0xeca8e918f64dfeee!8m2!3d49.2057179!4d-122.910956!16zL20vMDF2cXEx!5m1!1e1?entry=ttu&g_ep=EgoyMDI2MDMzMS4wIKXMDSoASAFQAw%3D%3D 

Its still amazing how the SkyBridge (1990) was never built with 2 bus lanes, 2 bike lanes and 2 sidewalks. Such is the narrowminded planning methodology that is backwards BC.  

https://en.wikipedia.org/wiki/SkyBridge_(TransLink)#Details   


https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge+replacement 

https://jfdatalinks.blogspot.com/search?q=Queensborough+Bridge 

https://jfdatalinks.blogspot.com/search?q=SkyBridge

Sunday, March 29, 2026

YVR-Canada Line and REM Train

 https://www.youtube.com/watch?v=a1ouk0VifwM&t=42s Even if the YVR-Canada Line had to initially be built as a symbolically small city train, urban transportation infrastructure can be designed in ways that can double or even triple capacity to meet future demand. Unfortunately, its very difficult to build anything in BC with significant future capacity in mind.

Ultimately, the YVR-Canada Line should have had level station clearances to eventually be able to accommodate 10 car trains. Unfortunately, in typical backwards BC planning the stations weren't even designed with enough level clearance to accommodate 5 car trains. The joke that is the Canada Line only has a level station clearance of 50m to eventually accommodate just a 2.5 car train. 

Most other cities actually build long stations to accommodate long trains right in the first place. Or, at least allow for enough level clearance so that the stations can eventually be doubled or tripled in length. 

The YVR-Canada Line should have started with the Vancouver & Richmond segment, then the Vancouver and Horseshoe+Bay+ferry+terminal segment. Then finally, the YVR to Delta and the Tsawwassen+ferry+terminal

The SkyTrain Stations in Greater Vancouver https://www.youtube.com/watch?v=6Qg78Bmf1fk

Unfortunately, proper big city transportation planning is very difficult to achieve in backwards BC. So much is watered down in Vancouver.


Montreal’s Biggest REM Expansion Yet https://www.youtube.com/watch?v=4G1oeIAfxDU&t=106s 

The Montreal REM https://www.youtube.com/watch?v=g9O6RzsXIqQ 

While the REM was designed to help the Metro, it should have the capability to be gradually expanded. Eventually, REM trains should be lengthened from 4 car trains to 6 and even 8 car trains. 

In contrast, every Skytrain line should have been designed with enough level future station clearance to eventually accommodate a train as long as a 152.5 (500 ft.) long Montreal Metro train. The first 2 Skytrain lines have 80m stations and the joke that is the Canada Line only has 50m stations. 

While the first 2 lines can accommodate 5 car trains, the C Line wasn't designed to accommodate 5 car trains. Just 2.5 car trains, someday. 

Despite there being such a symbolic push for Vancouver to keep having short trains, narrow bridges and stumpy buildings, things are gradually changing in backwards BC. The Vancouver or BC Mind Virus should have been challenged decades ago, but too many loud people wanted to perpetuate the, KEEP THINGS SMALL AND INDEQUATE agenda.

Given how most of the bridges in Greater Vancouver are so narrow, there isn't enough room for proper bus and HOV lanes, or even wide emergency lanes. One would think that at least the trains & stations would have been designed to eventually be doubled or tripled in length. But that would go against the mutigenerational congestive planning agenda. That's why there still is only a 3 lane LGB when there should have been at least a parallel bus, HOV and train tunnel. The Pattullo+Bridge replacement didn't open with 2 bus and 2 HOV lanes, not even wide shoulders or emergency lanes. NW really likes the congestive planning approach. Of course the new tunnel between Richmond and Delta won't have an additional provision for a train tube. This will also help to perpetuate the congestive transportation mandate. 

Fortunately, Selective_door_operation technology can eventually allow more sensible transportation planners to enable longer trains. 

https://en.wikipedia.org/wiki/Selective_door_operation#International_variations , https://www.youtube.com/watch?v=YdH5d1ZthmM 

This means that a 5 car Skytrain (85m) could eventually become a 7 car train, despite the 80m stations. 

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)_rolling_stock#Alstom_Mark_V Thus, an 80m train can become a 117m train.

A two car and 2.5 car (50m) train on the multibillion dollar Canada Line is so absurd and inept! With some slight station modifications, there could be a potential to eventually accommodate three, 20m cars at such short platforms. Then, once 3 car trains could become possible, its just a matter of having an extra 20m car at both ends of each train. A 5 car train of 100m is so much better than a 50m joke of a train. 

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)#Alstom_Mark_V_fleet 


https://jfdatalinks.blogspot.com/search?q=SkyTrain-Canada+Line

https://jfdatalinks.blogspot.com/search?q=REM

Monday, March 9, 2026

The narrow Pattullo Bridge Replacement

https://www.pattullobridgereplacement.ca/construction/current-works Its a nice 4 lane bottleneck choakpoint. There should have been a provision for a lower deck for bus lanes, HOV lanes and LRT, but that would help to alleviate some transportation congestion.

It wasn't designed with that much future capacity in mind, just like the absurd Canada+Line. The SkyTrain-Canada+Line is still only running 2 car trains. The New stal̕əw̓asəm Bridge is only 2 lanes each way. This is congestive urban planning in BC at its best. Narrow bridges and short trains are some of the best ways to symbolically demonstrate a reluctance to accommodate future growth capacity. 

People aren't suppose to wonder where all the money went over the past several generations, because it seems that not enough funds have gone towards proper big city infrastructure.

 

Thursday, March 5, 2026

Why the Widest Freeway on Earth still Made Traffic Worse in Houston

 https://www.youtube.com/watch?v=vMwKgT4ZUvQ It is utterly foolish to not have enough space for a commuter train to run above, or in the middle or underneath the widest highways. 

https://kinder.rice.edu/urbanedge/houstons-15-year-growth-three-charts Simply building wide roads like in Houston, L.A. and Toronto is just as bad as having mostly narrow bridges in Greater Vancouver.  

Whether its 10 lanes or 20 lanes wide, there should always be 2 dedicated bus lanes and 2 HOV lanes. While the highway will get clogged up during the day, at least the buses and trains can still get through quickly. 

The Pattullo+Bridge+replacement is only 2 lanes each way with narrow shoulders. It should have opened with enough space for 2 bus lanes and 2 HOV lanes, but that would go against the congestive urban planning mentality of BC.

The Samuel-De+Champlain+Bridge in Montreal is just as good as similar wide highway and train bridges in Seattle+and+Perth. All were possible, simply because they aren't limited by anything like the Vancouver and BC Mind Virus.

The narrow-minded Vancouver and BC approach is to try to funnel everything into just 2 or 3 lanes each way. Then there just isn't enough space to have 2 bus lanes and 2 HOV lanes. Greater Vancouver has certainly gone in the extreme opposite direction of Houston, L.A. and Toronto...

A wide Greater Houston highway has lots of space, but without 2 bus lanes and 2 HOV lanes, everything gets plugged up. In contrast, Greater Vancouver has most of its bridges and highways so damn narrow, there isn't enough space to accomodate a proper express bus and HOV network. 

This deliberate backwards BC bottleneck-chokepoint planning approach is totally absurd. 

There is no commuter train tunnel near the Lions+Gate+Bridge or even for the Massey+Tunnel+replacement. Thus, they are the best examples of BC choke-point urban planning. Despite having twice the lanes as the inept 3 lane LGB, the newer Iron+Bridge never had any emergency lanes. A bus and HOV bridge was never built next to it. Plus, no commuter train bridge. It's another fine example of BC choke-point, bottleneck planning. 

A north and south Boundary+Road bridge system would provide direct access between the North+ShoreRichmond+and+Delta, but that's what a proper big city would do. Backwards BC has quite a problem with thinking and building big. The 2 car Canada+Line is another example. Don't build it to at least have a 5 car train, just design it to only have 2.5 car trains, someday.

https://en.wikipedia.org/wiki/Greater_Houston#Transportation

https://en.wikipedia.org/wiki/Interstate_610_(Texas)#Lane_configurations There is a point when simply adding more lanes won't provide long-term improvement. However, when combined with dedicated bus and HOV lanes, other options become available. Especially, if there is rail rapid transit and commuter rail as well. 

https://en.wikipedia.org/wiki/METRORail While not as extentise as DART_rail, it still works like a tram-train. 

Of course longer streetcars or tram-trains are still slow on the actual surface street segments.

https://en.wikipedia.org/wiki/Trams_in_Melbourne#System_upgrades 

https://en.wikipedia.org/wiki/Toronto_streetcar_system

https://en.wikipedia.org/wiki/Muni_Metro SF

Saturday, February 21, 2026

The Pattullo Bridge Replacement

 https://news.gov.bc.ca/releases/2026TT0025-000178 Its only 2 lanes each way for the foreseeable future. No bus lanes and no HOV lanes, it's just another classic BC funnel for congestion.

Wednesday, January 7, 2026

Four Lane Pattullo Bridge Replacement Project

 https://www.youtube.com/watch?v=o-ING5Pfrdk 

The old bridge has 4 narrow lanes and no traffic divider. However, the new bridge won't have any bus or HOV lanes and no emergency lanes. 

Chokepoint-bottleneck planning remains firmly entrenched in backwards BC.

Wednesday, December 24, 2025

Driving over the Pattullo Bridge replacement

 https://www.youtube.com/watch?v=DwwOqxqzNrQ 

It's great symbolism with opening the bridge with just 1 lane. In 1800s backwater BC, it was amazing just to have a wagon road anywhere. Well the new bridge, when it's fully open,will have 2 wagon roads each way, just like the old bridge. https://www.youtube.com/watch?v=b0EeyJmmpuM 


Partial opening of the Pattullo Bridge replacement

 https://www.youtube.com/watch?v=tDFkc9Oa-j0 

Unfortunatly, the old bridge is such bad shape that it can't be refurbished. Otherwise, each bridge could have provided 3 or 4 lanes each way. People will be in for a shock once the old bridge is dismantled. Then the new bridge will become just another classic 4 lane BC bottleneck-chokepoint. 

No bus lanes or HOV lanes and especially no wide emergency lanes. 


https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge

One lane of new Pattullo Bridge now open to vehicle traffic

 https://dailyhive.com/vancouver/riverview-bridge-opening-official-christmas-pattullo-replacement 

They should have had a horse and waggon going over the bridge to symbolize the desire by some urban planners to have roads and bridges that aren't much wider than a wagon road.

Wednesday, November 26, 2025

Pattullo to partially close for three nights as 4 lane replacement bridge opening draws near

 https://dailyhive.com/vancouver/pattullo-bridge-closures-replacement-opening 

No matter how much NW wants to be one of the smallest cities in backwards BC, it can't stop Surrey from eventually being the biggest city in what should be bustling BC. The SkyBridge was deliberately designed to not have any HOV or truck lanes. The narrow SkyBridge wasn't even designed to eventually become a bus and bike bridge. Just a train bridge without even any sidewalks. It really should have been given an award for one of the worlds best examples of inept urban infrastructure. 

It's like the SkyBridge (1990) was designed to be the first part of the new inadequate crossings between NW and Surry.

Indeed, just like its 1937 predecessor, the Pattullo_Bridge_replacement will open with only for lanes, but at least it will have 2 bike lanes and 2 sidewalks. The Pattullo_Bridge_replacement should have opened with 6 lanes and 2 wide shoulders or emergency lanes, but that would go against funneling everything into just 2 lanes each way. No emergency lanes or wide shoulders helps to reduce emergency vehicle inefficiency. No bus & HOV lanes helps to increase transportation congestion. Despite being a seaport region, there aren't any truck lanes. Perhaps the best feature of all is than the bridge wasn't designed to eventually have a lower deck for trains and trucks. 

Multibillion dollar bridges can be designed with future widening capabilities, or at least having a provision for a lower deck. Unfortunatly, it's very difficult for BC to design prober big city size transportation infrastructure. 

Wednesday, October 29, 2025

Long-term plan to completely rebuild and expand Vancouver General Hospital

 https://dailyhive.com/vancouver/vancouver-general-hospital-vgh-campus-redevelopment-preliminary-concept 

It's about time that backwards BC start building up a proper big city size medical center in watered-down Vancouver. Another proper big city medical complex should be built in Surrey

https://en.wikipedia.org/wiki/Guy%27s_Hospital#Facilities

Houston, TX has been building theirs over the past several decades. 

https://en.wikipedia.org/wiki/Texas_Medical_Center 

https://en.wikipedia.org/wiki/Texas_Medical_Center#Hospitals

https://www.tmc.edu/about-tmc  

https://en.wikipedia.org/wiki/Texas_Medical_Center#Cityscape_and_infrastructure 

https://en.wikipedia.org/wiki/Memorial_Hermann_Memorial_City_Medical_Center#Facilities

https://en.wikipedia.org/wiki/Orion_Complex_Goi%C3%A2nia

https://en.wikipedia.org/wiki/List_of_tallest_hospitals 

https://en.wikipedia.org/wiki/Lurie_Children%27s_Hospital 

https://en.wikipedia.org/wiki/Tokyo_Medical_and_Dental_University#Campuses 

https://en.wikipedia.org/wiki/Herlev_Hospital 

https://en.wikipedia.org/wiki/List_of_largest_hospital_campuses#Ranked_by_capacity  

Backwater BC has been under a multigenerational, KEEP THINGS SMALL OR INADEQUATE agenda for too damn long. The overbearing implemented symbolism is too much! An inept 3 lane Lions+Gate+Bridge and an absurd Canada+Line with only 2 car trains, are classic BC Mind Virus (BCMV) B$! Even the 4 lane Pattullo+Bridge+replacement is another example of the BCMV. Somehow, Vancouver & BC fell behind with having enough hotel rooms. Its as if the city & province just didn't think that adding hotels would actually help the local tourism business. The Greater Vancouver Region should have made it easier for more hotels to be built by cutting out so much red tape. 


https://jfdatalinks.blogspot.com/search?q=BC+hotels


Friday, October 10, 2025

Rainbow Bridge (Tokyo)

 https://en.wikipedia.org/wiki/Rainbow_Bridge_(Tokyo) Unfortunatly, such double deck bridges just aren't allowed in Vancouver and BC in general.

https://www.instagram.com/p/DEjugfrP3wS/?img_index=2 

https://www.kanpai-japan.com/tokyo/rainbow-bridge 

https://www.alamy.com/rainbow-bridge-to-rainbow-town-daiba-tokyo-japan-image921088.html Tokyo has no problems with curves and loops. Unfortunatly, the Vancouver Mind Virus (VMV) and the BC Mind Virus keeps the city and metropolitan region as a warped mess just going round in circles.

https://www.gov-online.go.jp/eng/publicity/book/hlj/html/202403/202403_02_en.html 

https://japannews.yomiuri.co.jp/society/general-news/20230828-132566/ 

https://www.tokyobybike.com/2014/08/tokyos-rainbow-bridge-by-bicycle.html 

https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge+replacement Will open with only 4 lanes, not 6 or 8 and no provision for a lower deck. Another fine example of BC bottleneck planning. There just isn't any interest in correcting most of the chokepoints in Greater Vancouver. A key giveaway is the lack of funding for a regional network of bus-bridges. 

https://en.wikipedia.org/wiki/North_Arm_Bridge This should have had 2 tracks for the airport and another 2 tracks for an eventual Vancouver-Richmond & Delta extension to the ferry terminal. 

https://upload.wikimedia.org/wikipedia/commons/f/f9/North_Arm_Bridge_%284378906640%29.jpg

https://upload.wikimedia.org/wikipedia/commons/d/de/North_Arm_Bridge_shot_from_SkyTrain_3622.JPG

Friday, October 3, 2025

The outlook of B.C.’s economic action plan for 2026

 https://bcbusiness.ca/industries/invest-in-bc/the-outlook-b-c-s-economic-action-plan-for-2025-2026/ 

BC has so much red tape to resolve that Alberta & Washington State never had or had gotten rid of long ago. 

The transportation infrastructure is so lacking.

https://jfdatalinks.blogspot.com/search?q=Lions+Gate+Bridge A lingering sad 3 lane joke of a bridge. No interest in at least having a bus, truck and train tunnel near it. 

https://jfdatalinks.blogspot.com/search?q=YVR-Canada-Line A 2 car joke of a train.

https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge+replacement A modernern 4 lane joke of a bridge with no emergency lanes, let alone no bus and HOV lanes. Of course there is no provision for a lower deck to accommodate trains and trucks. 

Thursday, September 25, 2025

The New 4 lane Pattullo Bridge is expected to open by Christmas

 https://vancouver.citynews.ca/2025/09/25/new-pattullo-bridge-to-open-by-christmas-bc-government 

Not 8, not 6, just another 4 lane BC funnel chokepoint. Officially, NW isn't against bus and HOV lanes, they just weren't part of the new bridge design. Of course there was no provision for a lower deck, because that would go against the congestion planing mentality. This new bridge not only should have had 2 bus lanes, but 2 wide emergency lanes or shoulders as well. Even if it can eventually have 6 lanes, there still won't be any emergency lanes or HOV lanes.

This BC bottleneck planning mentality is so bad for transportation. So much of backwards BC is about doing things that are impressive to the Yukon or Labrador. Not Quebec, Ontario and Alberta. 


https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge In 1800s BC, having the width of 2 wagon roads would be amazing.  

https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge+replacement In the 2020s, having 2 wagon roads each way is still amazing. 

There seems to be an unwritten rule that whenever possible, no bridge system in BC should be as wide as the widest in Fort+McMurray,+AB or Edmonton,+AB.

https://www.canambridges.com/projects/athabasca-river-bridge

Most Albertans have no idea of what it would be like to be under something like a BC Mind Virus. 

The same goes for Southern Quebec and Southern Ontario.

https://www.canambridges.com/projects/ile-des-soeurs-bypass-bridge/ 

Alberta, Ontario & Quebec would collapse or implode, if they had to do things the backwards BC way.

https://www.canambridges.com/projects/new-champlain-bridge-corridor-project/

Friday, July 25, 2025

Four lanes or 6? MLA comments reignite Pattullo Bridge debate

 https://www.surreynowleader.com/local-news/four-lanes-or-6-mla-comments-reignite-pattullo-bridge-debate-8151111

Two bike lanes & 2 sidewalks are great, but the government really tipped their hand with this. Despite the SkyTrain not running 24hrs, the new bridge won't open with any bus lanes & no HOV lanes. Despite Greater Vancouver being a port region, there won't be any dedicated truck lanes & worst of all, no emergency or breakdown lanes. 

Since there was such a push to only have 2 lanes each way, the new bridge still should have opened with 2 wide emergency lanes & 2 wide breakdown lanes. Thats 6 lanes already in place, with a provision to eventually add 2 more. However, that would go against the congestive planning agenda that is Greater Vancouver & backwards BC.

It's one thing to say or pretend to support bus & HOV lanes, but opening this new bridge without such additional lanes all fits in with the congestive planning agenda. Just like a 5 car SkyTrain squeezed into an 80 m station, is a far cry from a 9 car Montreal Metro train with 152.5 m stations. Thinking, planning & building big in BC goes against the congestive planning agenda.

Symbolism is very important in backwards BC. Thus, half-size infrastructure is one of the best ways to demonstrate an ongoing reluctance to accommodate growth & efficiency. There have been several decades, even generations where funding has only created half-size & HALF-A$$ED infrastructure. So the big question is, where did so much of the money go, when BC still needs proper size infrastructure?

This multigenerational backwards BC mind Virus is horrible!


https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge 4 narrow lanes & a narrow sidwalk.

https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge+replacement 4 wide lanes with a central divider, pulse 2 sidewalks & 2 bike lanes. 

Saturday, June 21, 2025

The Pattullo Bridge replacement project

 https://dailyhive.com/vancouver/pattullo-bridge-new-indigenous-renaming-art

While it's great to have a new name for the new bridge, there should have been a few more bridges between Surrey, NW, Coquitlam & Port Coquitlam.

https://604now.com/pattullo-bridge-new-indigenous-name

Another lost opportunity for backwards BC. This new bridge should have opened with 6 lanes, plus have at least 2 wide shoulders for future capacity. Then there could have been 2 HOV lanes, as well as 4 general lanes. There also should have been a lower deck for something similar to what the Tilikum_Crossing has. https://trimet.org/tilikum

Such a lower deck not only could have provided 2 sidewalks & 2 bike paths, but a provision for 2 streetcar or tram-train tracks and even 2 separated SkyTrain tracks. Instead, all the traffic will be crammed into just 2 lanes each way with no bus & no HOV lanes & especially no breakdown lanes. In the future, the existing 2 track Skybridge between Surrey & NW might not be adequate. People from all over the world should study the BC bottleneck planning mentality & avoid such bad planning at all costs.

It is foolish for the most urban part of BC to not have wide or double deck bridges. Unfortunatly, this new 4 lane bridge wasn't designed to have 2 bus & 2 HOV lanes & no provision for at least 2 train tracks. At least it will have more than 1 sidewalk & 1 more lane than the LGB and even a safety divider. 

Despite Surrey eventually becoming the most populous city in backwater BC, no 2 track train bridge like the Tilikum has been allowed to be built in backwards BC. https://trimet.org/tilikum/#about

https://trimet.org/tilikum/#:~:text=Bus%20lines%20FX2%2DDivision%2C%209,both%20sides%20of%20the%20river.


https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge+replacement

https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge

Thursday, May 15, 2025

Pattullo Bridge closed over Victoria Day weekend

The shutdown to motor vehicles is needed as part of the replacement project on the span between Surrey and New West https://vancouversun.com/news/traffic-alert-pattullo-bridge-closed-victoria-day-weekend