Showing posts sorted by relevance for query Richmond-Delta Tunnel. Sort by date Show all posts
Showing posts sorted by relevance for query Richmond-Delta Tunnel. Sort by date Show all posts

Wednesday, July 31, 2024

LRT, Semi-metro and Heavy Rail Rapid Transit...

https://en.wikipedia.org/wiki/Light_rail , https://en.wikipedia.org/wiki/Light_rail#Types , 

https://en.wikipedia.org/wiki/Light_rail#Comparison_to_other_rail_transit_modes


 https://en.wikipedia.org/wiki/Premetro 

https://en.wikipedia.org/wiki/Semi-metro 

https://en.wikipedia.org/wiki/Rapid_transit 


Of course when Vancouver & the greater urban region became obsessed with keeping the roads & bridges narrow, it was as if there wasn't a proper concept of having express bus lanes & dedicated rapid bus lanes. Short trains is just another example of the congestive transportation approach to things in BC.

https://dailyhive.com/vancouver/translink-funding-issues-impacts-traffic-congestion 

The 1959 George_Massey_Tunnel should have opened with 3 lanes each way. Plus, 2 wide emergency lanes. Then over the course of its first 2 decades, it could have become a 6 lane crossing with 2 bus & HOV lanes. 

By the 1980s, the inept 4 lane George_Massey_Tunnel should have had a parallel higher & wider bus & HOV tunnel consisting of at least another 4 lanes & at least 2 emergency lanes. Thus making it more capable as an eventual replacement to the old tunnel. Then by around 2000, there should have been a bike, truck & train bridge or tunnel as well. 

George_Massey_Tunnel#Replacement by the 2030s? The first phase of this really should have been started by the 1980s. Of course the new tunnel with 8 lanes & 2 bike lanes, won't have 2 truck lanes & there won't be 2 HOV lanes. Plus, in accordance with a perpetual congestive planning mentality, there is no provision for an extension of the Canada Line to Delta.

The new Richmond-Delta+Tunnel should not only have had 3 general lanes each way & 1 bus lane each way, there should be 1 truck lane each way as well. Plus, 2 wide emergency lanes which could eventually be repurpose for a north & southbound rapid bus transit corridor. That's because, even if there is ever a YVR-Canada-Line to the ferry terminal, it won't be open 24 hours.

Someday the YVR-Canada-Line should not only have 2.5 car trains, but an actual 5 car train consisting of five, 20m coaches. Selective_Door_Operation (SDO) technology would make this possible. Of course it would have simply been much better to have designed all the stations to already be at least 100m, instead of the inept 50m. Unfortunately, backward BC thinking keeps getting in the way.

https://www.richmond-news.com/local-news/province-considering-filling-george-massey-tunnel-with-sand-8777369 Despite the old tunnels height restrictions, a slightly smaller version of the Road_Train could have been ideal for it. https://en.wikipedia.org/wiki/Road_train#Trailer_arrangements

Keeping the old tunnel as a freight corridor between Delta & Richmond would be of tremendous benefit. Delta has the Roberts_Bank_Superport & the Tsawwassen_ferry_terminal.

Richmond has the Vancouver_International_Airport & the inept Canada_Line

Despite budget limits at the time, the Canada_Line should have been designed to eventually have 5 car trains & ultimately, 10 car trains. It should have been envisioned as a high capacity rail link between downtown Vancouver, YVR, Richmond & Delta. With an ultimate connection between the Tsawwassen_ferry_terminal and the Horseshoe_Bay_ferry_terminal

For some reason Vancouver & BC never seemed to really take off in the 1980s like Calgary, Seattle & Perth. Indeed, while Vancouver seemed to continue on its sleepwalking path after Expo_86, Brisbane really started to boom after its World_Expo_88

Unlike SW BC, the Brisbane Airport & seaport are much closer to each other. Being from Vancouver, its hard to fathom how the Brisbane Airport train can be like a proper big city train an station. In backwards BC, its so difficult to get proper big city size infrastructure built. 

https://upload.wikimedia.org If you are from Brisbane & visiting Vancouver, you will be shocked to see such a short airport train. Being from Vancouver, its difficult to grasp how Brisbane was able to build such nice long trains. This is something to be very proud of, as it can move a lot of people in both directions. https://en.wikipedia.org/wiki/International_Airport_railway_station,_Brisbane This opened in 2001 & Vancouver's inept version had to be ready by 2010 with just 2 car trains. Yet, Brisbane designed their train to be high capacity capable as soon as it open for service. From a backwards BC perspective, it's amazing how Queensland is able to think & function on such a grand scale & to properly allocate the necessary funds. Who knows where so much of the funds went in BC? That's because not enough of it seems to have gone into the infrastructure. 

https:://en.wikipedia.org/wiki/Vancouver_International_Airport#Rapid_transit_(SkyTrain) 

Unfortunately, this is an embarrassment line because, that's not a 4 car train, its only two, 2 car trains on a single track. How can Vancouver ever rank as a proper city & metropolitan area, when the trains are so short & most of the bridges are so narrow? 

https://en.wikipedia.org/wiki/YVR-Airport_station Why have a double track station allowing for at least 155m - 200m long trains? Do it the backwards BC way with only a single track & a 50m station. This isn't just an example of extreme cost-cutting. Its not properly designing crucial transportation infrastructure for eventual high capacity. Fortunately, most proper big urban areas are able to think & build big right from the start. Case in point is Queensland.

https://www.google.com/maps/place/Sir+Leo+Hielscher+Bridges,+Queensland,+Australia

https://upload.wikimedia.org/wikipedia/Gateway_Bridge This 6 lane & then a 12 lane crossing was possible, because Queensland isn't under anything like the backwater BC restrictions. 

https://en.wikipedia.org/wiki/Sir_Leo_Hielscher_Bridges This has the potential to still have 4 lanes each way. Plus, 1 bus lane & 1 HOV lane each way.

https://en.wikipedia.org/wiki/Port_of_Brisbane , https://www.portbris.com.au , 

https://www.portbris.com.au/portbris-2060

Unlike backwards BC, Queensland is able to properly think, plan & build for the future. Queensland just isn't hindered by anything like the BC Mind Virus (BCMV).

The YVR-Canada+Line is almost the worlds shortest train, because it only has 2 cars on a 2 billion dollar line of B$.


https://jfdatalinks.blogspot.com/search?q=old+and+new+narrow+bridges 

https://jfdatalinks.blogspot.com/search?q=Brisbane+Airport+Railway+Line

Monday, May 12, 2025

The Richmond-Delta Tunnel

It was first called, the Deas Island Tunnel and then the George_Massey_Tunnel. Perhaps the new tunnel will be given a different name. This narrow tunnel has been a serious chokepoint for several decades. Apparently, there wasn't any proper big city planning, despite there being a ferry terminal & the Delta Port facilities.

https://en.wikipedia.org/wiki/George_Massey_Tunnel#Replacement

Even the new tunnel will be symbolic or indicative of not having a train between the Delta ferry terminal and YVR. The new tunnel or crossing should have been built in 2 phases. 

First, the two 4 lane sections for general traffic & buses. Then, as port & truck traffic increases, a train & truck tunnel or bridge should be built. 

https://www.richmond-news.com/local-news/province-considering-filling-george-massey-tunnel-with-sand-8777369  


https://jfdatalinks.blogspot.com/search?q=Massey+Tunnel+replacement 

https://jfdatalinks.blogspot.com/search?q=Richmond+and+Delta

Thursday, November 6, 2025

Expect noise, vibration during upcoming Massey Tunnel replacement

 https://www.delta-optimist.com/local-news/expect-noise-vibration-during-upcoming-massey-tunnel-replacement-11436394 This B$ should have been done a few decades ago.

A 10 lane bridge with 2 bus lanes, 2 HOV lanes & 2 wide shoulder-emergency lanes, plus at least 3 general lanes each way, could have been a nice wide crossing. Some 12 lanes, including the 2 emergency lanes. Plus, a provision for at least 2 LRT tracks. 

Instead, it's a 3 lane each way tunnel with the 4th being a bus lane. No HOV lanes and no emergency lanes & especially, no train tube section. 

So, just like the YVR-Canada (embarrassment) Line, this new 8 lane tunnel will eventually require some major upgrades. 

Eventually, a YVR-Canada Line bridge or tunnel will have to be built so that someday, trains can go between the airport and the ferry terminal. Such a train crossing should be parallel to the new highway tunnel. A new train tunnel or bridge should have at least 3 tracks, 2 rapid bus lanes and 2 bike lanes and sidewalks. Then the bus lanes in the highway tunnel could become HOV lanes. 


https://jfdatalinks.blogspot.com/search?q=Richmond-Delta+Tunnel

https://jfdatalinks.blogspot.com/search?q=Massey+Tunnel+replacement 

https://jfdatalinks.blogspot.com/search?q=Richmond+and+Delta

Tuesday, March 31, 2026

George Massey Tunnel Replacement

 https://en.wikipedia.org/wiki/George_Massey_Tunnel#Replacement 3 lanes each way and a bus lane each way.

https://dailyhive.com/vancouver/george-massey-tunnel-new-replacement-potential-cost-increase

https://www.cbc.ca/news/canada/british-columbia/massey-tunnel-design-team-chosen-1.7273022# 

https://www.highway99tunnel.ca Of course the new tunnel is missing the crucial train section.

While a 10 lane bridge would have allowed a provision for a train to eventually run between Richmond and Delta, such a train would go against the congestive planning mentality that is BC. 

Of course a train tunnel or bridge will have to eventually link Richmond and Delta, someday. Despite an opportunity to improve regional rail transportation, the BC government just doesn't see it as important enough of a project yet. 


https://jfdatalinks.blogspot.com/search?q=Richmond-Delta+Tunnel

Monday, July 6, 2026

New replacement George Massey Tunnel to cost $8.5 billion and opening in September 2031

 https://dailyhive.com/vancouver/george-massey-tunnel-new-replacement-cost-timeline-update 

Of course with all the extra delays costs, there still won't be an LRT tube and no HOV lanes. While the new tunnel will be 4 lanes each way, there should have been an extra section for 2 LRT tracks and 2 rapid bus lanes. BC has a problem providing 24hr rapid rail transportation, so 24hr BRT is essential. 

A 10 lane version of an Alex_Fraser_Bridge with a provision for LRT, could have been completed a few years ago. However, just because some people didn't want a bridge crossing that part of the river, the plan was scrapped. The result is more cost and delay in what should have been completed a few decades ago. 

If ever a proper LRT and rapid bus crossing can be built parallel to the new tunnel, then that 8 lane tunnel could still have 3 general lanes each way, plus the 4th being an HOV lane. A parallel LRT and rapid bus needs to be built between Richmond and Delta so that there can be an efficient connection between YVR and the 2 ferry terminals.

Something like a Tilikum_Crossing between Richmond and Delta should have already been built decades ago, but there just isn't proper transportation planning in backwards BC.

Either an extension of an improved YVR-Canada Line, or an LRT like the C Train or MAX_Train. Since such a train won't be running 24 hours a day, there would need to be a Rapid bus_crossing as well. Such redundancy is important, especially if there is an occasional problem with the train. A Streetcar_Crossing would also be nice, because the Skytrain, LRT and BRT can't go everywhere. Where as express and local buses and streetcars can fill in the gaps. 

Of course more bicycle and footpaths can be a great improvement.  


https://jfdatalinks.blogspot.com/search?q=Richmond-Delta+Tunnel

Thursday, March 5, 2026

Why the Widest Freeway on Earth still Made Traffic Worse in Houston

 https://www.youtube.com/watch?v=vMwKgT4ZUvQ It is utterly foolish to not have enough space for a commuter train to run above, or in the middle or underneath the widest highways. 

https://kinder.rice.edu/urbanedge/houstons-15-year-growth-three-charts Simply building wide roads like in Houston, L.A. and Toronto is just as bad as having mostly narrow bridges in Greater Vancouver.  

Whether its 10 lanes or 20 lanes wide, there should always be 2 dedicated bus lanes and 2 HOV lanes. While the highway will get clogged up during the day, at least the buses and trains can still get through quickly. 

The Pattullo+Bridge+replacement is only 2 lanes each way with narrow shoulders. It should have opened with enough space for 2 bus lanes and 2 HOV lanes, but that would go against the congestive urban planning mentality of BC.

The Samuel-De+Champlain+Bridge in Montreal is just as good as similar wide highway and train bridges in Seattle+and+Perth. All were possible, simply because they aren't limited by anything like the Vancouver and BC Mind Virus.

The narrow-minded Vancouver and BC approach is to try to funnel everything into just 2 or 3 lanes each way. Then there just isn't enough space to have 2 bus lanes and 2 HOV lanes. Greater Vancouver has certainly gone in the extreme opposite direction of Houston, L.A. and Toronto...

A wide Greater Houston highway has lots of space, but without 2 bus lanes and 2 HOV lanes, everything gets plugged up. In contrast, Greater Vancouver has most of its bridges and highways so damn narrow, there isn't enough space to accommodate a proper express bus and HOV network. 

This deliberate backwards BC bottleneck-chokepoint planning approach is totally absurd. 

There is no commuter train tunnel near the Lions+Gate+Bridge or even for the Massey+Tunnel+replacement. Thus, they are the best examples of BC choke-point urban planning. Despite having twice the lanes as the inept 3 lane LGB, the newer Iron+Bridge never had any emergency lanes. A bus and HOV bridge was never built next to it. Plus, no commuter train bridge. It's another fine example of BC choke-point, bottleneck planning. 

A north and south Boundary+Road bridge system would provide direct access between the North+ShoreRichmond+and+Delta, but that's what a proper big city would do. Backwards BC has quite a problem with thinking and building big. The 2 car Canada+Line is another example. Don't build it to at least have a 5 car train, just design it to only have 2.5 car trains, someday.

https://en.wikipedia.org/wiki/Greater_Houston#Transportation

https://en.wikipedia.org/wiki/Interstate_610_(Texas)#Lane_configurations There is a point when simply adding more lanes won't provide long-term improvement. However, when combined with dedicated bus and HOV lanes, other options become available. Especially, if there is rail rapid transit and commuter rail as well. 

https://en.wikipedia.org/wiki/METRORail While not as extensive as DART_rail, it still works like a tram-train. 

Of course longer streetcars or tram-trains are still slow on the actual surface street segments.

https://en.wikipedia.org/wiki/Trams_in_Melbourne#System_upgrades 

https://en.wikipedia.org/wiki/Toronto_streetcar_system

https://en.wikipedia.org/wiki/Muni_Metro SF 


In the case of backwards BC, the new Richmond-Delta+Tunnel should have been designed to have 8 lanes for the first phase. Then a 2nd phase should have had a 2 lane BRT tunnel, a 2 lane truck tunnel and a provision for 2 LRT tracks. Then the first phase of the new tunnel could be 3 lanes each way, with the 4th being a HOV lane. 

Had this new tunnel or bridge been built decades ago, it would have cost half as much. Unfortunately, its like a choice was made for the new tunnel. Two bus lanes, but no HOV lanes and certainly no separate section for BRT and LRT. Apparently, an LRT line between YVR and the Tsawwassen Ferry terminal would have made too much sense.

Monday, August 31, 2015

The Regional George Massey Tunnel Replacement Project

Of course someday, the Massey+Tunnel+replacement should have a regional rail crossing with extra bus or HOV lanes. 

While it's important to have a train to Coquitlam, it's also important to have a train to the Delta ferry terminal.





Its pitiful that there is no rail bridge between Richmond and Delta to provide an efficient link between YVR and the ferry terminal. 

https://sfb.nathanpachal.com/search/label/Transportation Its very strange that there doesn't seem to a plan to link YVR with the 2 regional ferry terminals.

https://sfb.nathanpachal.com/search/label/Interurban%20Maps Its sad that instead of improving regional rail transportation during the 1950s, 60s and 70s, backwards BC went the other way. Then the 1980s Skytrain had stations that were barely more than half the length of a 152.4 m Montreal Metro station. The YVR Line opened in 2009 and wasn't even built with 80m stations, only enough level clearance for 50m stations.  




Wednesday, January 15, 2025

Half of the new five-lane Steveston interchange on Highway 99 opens to traffic

 https://dailyhive.com/vancouver/new-steveston-interchange-highway-99-richmond-partial-opening

https://www.highway99tunnel.ca/project-overview/

https://www.highway99tunnel.ca/current-work/

https://www.highway99tunnel.ca/project-overview-frt/

https://www.rocktoroad.com/monumental-project/

https://www.delta-optimist.com/local-news/new-fraser-river-tunnel-will-have-a-new-name-when-it-opens-8512194

https://richmondsentinel.ca/article-detail/28157/history-of-the-massey-tunnel It's sad & pathetic that when the old tunnel was designed & then opened, there was no provision to have 3 lanes each way. Thus, despite being a seaport region, cars & trucks had to be funneled into just 2 lanes each way. It would have been too forward thinking to have the tunnel augmented by a couple of parallel bridges in the area.

Now once again, there still won't be another bridge or 2 in the area. A North and a South Boundary+Road Bridge could provide a vital link over the inlet and over the river. Then a Nelson Road Bridge to Delta and the Deltaport.  


https://jfdatalinks.blogspot.com/search?q=Richmond-Delta+Tunnel

Sunday, March 29, 2026

YVR-Canada Line and REM Train in Montreal

 https://www.youtube.com/watch?v=a1ouk0VifwM&t=42s Its as if the YVR-Canada Line had to be built as a symbolically small city train for provincial Vancouver. Urban transportation infrastructure can be designed in ways that can double or even triple capacity to meet future demand. Unfortunately, its very difficult to build anything in backwards BC with significant future capacity in mind.

Ultimately, the YVR-Canada Line should have had level station clearances to eventually be able to accommodate 5-10 car trains. Unfortunately, in typical backwards BC planning the stations weren't even designed with enough level clearance to accommodate 5 car trains. The joke that is the Canada Line only has a level station clearance of 50m to eventually accommodate just a 2.5 car train. 

Most other cities actually build long stations to accommodate long trains, right in the first place. Or, at least allow for enough level clearance so that the stations can eventually be doubled or tripled in length. 

The YVR-Canada Line should have started with the Vancouver & Richmond segment, then the Vancouver and Horseshoe+Bay+ferry+terminal segment. Then finally, the YVR to Delta and the Tsawwassen+ferry+terminal through a proper Richmond-Delta+Tunnel or bridge crossing. 

The short SkyTrain Stations in Greater Vancouver https://www.youtube.com/watch?v=6Qg78Bmf1fk

Unfortunately, proper big city transportation planning is very difficult to achieve in backwards BC. So many things are watered down in small-scale Vancouver.

-----------------------------------------------------------------------

Montreal’s Biggest REM Expansion Yet https://www.youtube.com/watch?v=4G1oeIAfxDU&t=106s 

The Montreal REM https://www.youtube.com/watch?v=g9O6RzsXIqQ 

While the REM was designed to help the Metro, it should have the capability to be gradually expanded. Eventually, REM trains should be lengthened from 4 car trains to 6 car trains, perhaps even 8. 

In contrast, every Skytrain line should have been designed with enough level future station clearance to eventually accommodate a train as long as a 152.5 m (500 ft.) long Montreal Metro train. The first 2 Skytrain lines have 80m stations and the joke that is the Canada Line only has 50m stations. 

While the first 2 lines can accommodate 5 car trains, the C Line wasn't designed to accommodate 5 car trains. Just 2.5 car trains, someday. 

Despite there being such a symbolic push for Vancouver to keep having short trains, narrow bridges and stumpy buildings, things are gradually changing in backwards BC. The Vancouver or BC Mind Virus should have been challenged decades ago, but too many loud people wanted to perpetuate the, KEEP THINGS SMALL AND INDEQUATE agenda.

Given how most of the bridges in Greater Vancouver are so narrow, there isn't enough room for proper bus and HOV lanes, or even wide emergency lanes. One would think that at least the trains & stations would have been designed to eventually be doubled or tripled in length. But that would go against the mutigenerational congestive planning agenda. That's why there still is only a 3 lane LGB when there should have been at least a parallel bus, HOV and train tunnel. The Pattullo+Bridge replacement didn't open with 2 bus and 2 HOV lanes, not even wide shoulders or emergency lanes. NW really likes the congestive planning approach. Of course the new tunnel between Richmond and Delta won't have an additional provision for a train tube. This will also help to perpetuate the congestive transportation mandate. 

Fortunately, Selective_door_operation technology can eventually allow more sensible transportation planners to enable longer trains. 

https://en.wikipedia.org/wiki/Selective_door_operation#International_variations , https://www.youtube.com/watch?v=YdH5d1ZthmM 

This means that a 5 car Skytrain (85m) could eventually become a 7 car train, despite the 80m stations. 

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)_rolling_stock#Alstom_Mark_V Thus, an 80m train can become a 117m train.

A two car and 2.5 car (50m) train on the multibillion dollar Canada Line is so absurd and inept! With some slight station modifications, there could be a potential to eventually accommodate three, 20m cars at the very short platforms. Then, once 3 car trains could become possible, its just a matter of having an extra 20m car at both ends of each train. Thus, a 5 car train of 100m is so much better than a 50m joke of a train. 

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)#Alstom_Mark_V_fleet 


https://jfdatalinks.blogspot.com/search?q=SkyTrain-Canada+Line

https://jfdatalinks.blogspot.com/search?q=REM+Train

Sunday, September 14, 2025

The Boundary Road bridges (BRB)

Unfortunatly, there doesn't seem to be any BRB plan in place.

A North Boundary Road Bridge could provide an excellent BRT crossing between Burnaby and North+Vancouver. This would help to relieve pressure on the Iron Bridge.

https://movementyvr.ca/bby-heights-brt

The same with a South Boundary Roade Bridge with a BRT route between Vancouver and Richmond

Then another BRT bridge between Richmond and Delta to the ferry terminal. This could help to relieve some of the pressure on the new tunnel, because it wasn't designed to have 2 HOV lanes & no train section.

https://www.translink.ca/plans-and-projects/projects/bus-projects/rapidbus-projects 



https://jfdatalinks.blogspot.com/search?q=Boundary+Road 

https://jfdatalinks.blogspot.com/search?q=BRT 

https://jfdatalinks.blogspot.com/search?q=Richmond+and+Delta 

https://jfdatalinks.blogspot.com/search?q=Richmond-Delta+Tunnel

Friday, July 11, 2025

How Bike Lanes have affected Vancouver's urban infrastructure

https://www.youtube.com/watch?v=LvkifuIjq9I The BSB was a 6 lane crossing that even had a provision for a lower deck intended for streetcars. Eventually, 2 lanes were removed & the lower deck was never completed. However, Vancouver was unable to prevent Seattle & Portland from reviving some of their streetcar routes.

The problem isn't bike lanes, it's the lack of interest to build a proper regional network of bus & bike bridges. Thus, if a proper bike bridge was built next to the Burrard+Street+Bridge, then 2 of its 6 lanes could have been for buses or at least HOV lanes. The lower deck could have still been for streetcars or tram-trains going between Vancouver & Richmond. The irony of backwards Vancouver is that it was one of the first cities to get rid of its streetcars & will likely be one of the last to bring them back.

The Fraser River Tunnel Project https://www.youtube.com/watch?v=NWhHJWKa6CQ Unfortunatly, this will still be a chokepoint or congested crossing.

Of course the new Richmond-Delta+Tunnel wasn't designed to be part of a rail link between the airport and the ferry terminal. There should have been 2 HOV lanes, as well as 2 bus lanes, but that would be a big-city 10 lane crossing. Instead, just an 8 lane tunnel with no train component. Eventually, a train and HOV bridge or tunnel will have to be built next to it. 

At least the first SkyTrain line can now have 5 car trains. However, the 2 car joke of a train still exists between Vancouver & Coquitlam, as well as between Vancouver & Richmond. The Montreal Metro can have 9 car trains and BART in SF can have 10 car trains. Such things are possible because they don't have a congestive BC panning mentality.


https://jfdatalinks.blogspot.com/search?q=Bike+Lanes

Sunday, May 3, 2026

What is Happening with Lansdowne Mall in Richmond?

 https://www.youtube.com/watch?v=H9_GQWyo8h0 

Boston and Las_Vegas allow much taller buildings than what's permitted in Richmond. Those cities don't use their airport as an excuse to have stumps. Even San_Diego has taller towers than Richmond. 

Despite New_Orleans being on a delta, it has much taller buildings than Richmond as well. 

Boston & LV have longer trains, while N.O. never totally got rid of their streetcars like Richmond had.

https://en.wikipedia.org/wiki/Lansdowne_station_(SkyTrain) A little 2 car joke of a train that's expected to do the job of what a big size or at least medium size city can do. 

https://en.wikipedia.org/wiki/Rseau_express_metropolitain#Rolling_stock 4 cars.

https://en.wikipedia.org/wiki/Skyline_(Honolulu) 4 cars.

Fortunately, Montreal & Honolulu opted to not have something like a 2 car YVR-C Line joke of a train. 

When stations can't easily be extended, Selective_door_operation can turn a 4 car rain into a 6 car train.

https://en.wikipedia.org/wiki/Selective_door_operation#International_variations  

Unfortunately, the YVR-Canada_Line wasn't designed to have 4 or 5 car trains. The stations were only designed to just accommodate a 2.5 car train. However, with Selective_door_operation, a 2.5 car train could become a 4.5 car train. Perhaps, even a 5 car train with 3 full-length cars accessing the station platform. To still be running a 2 car train to Richmond and a Richmond-Delta tunnel that's still only 2 lanes each way, is a very sad joke.

So much more should have been done between 1986 and 2010. Especially, since 2010 and 2026.

https://vancouver.citynews.ca/2026/05/02/expo-86-40-years-later-the-memories-live-on 

Everything is so much more difficult & costly to do in backwards BC.

Wednesday, October 15, 2025

The Battle continues over Vancouver Aquatic Centre

 https://globalnews.ca/video/11480236/battle-continues-over-vancouver-aquatic-centre-renovations 

There isn't officially a Vancouver Mind Virus (VMV), but somehow through the decades, the KEEP VANCOUVER SMAL AND BACKWARDS mentality keeps manifesting.

https://cityhallwatch.wordpress.com/2025/10/15/aquatic-centre-25vs50m-officials-misled "This scandal exposes how Vancouver’s development approval processes can be corrupted if staff predetermine outcomes and manufacture justifications rather than conducting evidence-based analysis. If municipal staff can systematically mislead elected representatives on a project this significant—with technical evidence this clear—what other decisions have been corrupted in the past or could be corrupted in the future?"

Why have a modern full-size pool, when there can be a half size, Half-A$$ED pool? That's the VMV resurfacing again.

https://vancouversun.com/news/proposed-vancouver-aquatic-centre-seeks-height-density-relaxations "Swimmers have mounted a court petition over plans to replace the 50-metre Olympic-sized pool with one half that length"

A scaled down Vancouver+Aquatic+Centre is part of the pay more to get less mentality. One of the most obvious ways to perpetuate the BC antigrowth agenda is to go backwards and build smaller infrastructure. Where does the money go if it's not always going towards proper big city size infrastructure?

Half sized buildings, half sized trains, half sized bridges, that's the VMV & BCMV in action. 

https://jfdatalinks.blogspot.com/search?q=SHIT-BOX 

https://jfdatalinks.blogspot.com/search?q=Lions+Gate+Bridge An absurd 3 lane bridge without a parallel bus and train tunnel to help relieve this quintessential chokepoint. 

https://jfdatalinks.blogspot.com/search?q=Canada+Line A 2 car train that should have started with 5 cars, but can only be expanded into a 2.5 car train, someday. 

https://jfdatalinks.blogspot.com/search?q=Richmond-Delta+Tunnel No provision for a train tunnel, because that would make it easier to have a line connecting YVR with the Tsawwassen+ferry+terminal. Just like there is no desire to have a train between YVR and the Horseshoe+Bay+ferry+terminal.

The Vancouver+Mind+Virus (VMV) and the BC Mind Virus (BCMV) are so horrible, because they keep stunting or thwarting the potential of BC by watering down the infrastructure. 


https://jfdatalinks.blogspot.com/search?q=VMV

Monday, July 27, 2026

Major water tunnel project between Richmond and Delta put off a few years

 https://www.westerninvestor.com/british-columbia/major-water-tunnel-project-between-richmond-and-delta-put-off-a-few-years-12580852 

Just like the new highway tunnel is pushed back to at least 2031. 

There should have been better highway, LRT and freshwater crossings between Richmond and Delta decades ago. Unfortunately, in backwards BC, things take a very long time to get done and not always properly or efficiently.

Wednesday, April 22, 2026

Temporary stal̕É™w̓asÉ™m Bridge closure will impact all traffic this weekend for construction

 https://dailyhive.com/vancouver/bridge-temporary-closure-surrey-new-westminster 

Lets open a bridge without 2 wide emergency lanes or 2 wide shoulders. Especially make sure that it didn't open with enough space for 2 bus lanes and 2 HOV lanes. Of course don't design the Bridge to have a potential lower deck for trucks and trains. Its an instant classic BC bottleneck chokepoint! 

https://www.pattullobridgereplacement.ca/about/projectoverview Just like the SkyBridge, apparently, there was no need to open it with 2 bus lanes, despite the train not running 24/7.

Unfortunately, the Bridges_over_the_Fraser_River in the BC Lower_Mainland just weren't designed to have proper bus lanes. Its so strange that the narrow SkyBridge was_for_SkyTrain only. 

Just like the new tunnel between Richmond and delta, there is no provision for 2 train tracks. While there are 2 bus lanes, there won't be any exclusive HOV lanes. Eventually, there will have to be a proper train and rapid bus bridge or another tunnel beside it. 

https://www.highway99tunnel.ca/project-overview-frt "The Fraser River Tunnel Project includes a new, eight-lane immersed tube tunnel that will replace the existing George Massey Tunnel on Highway 99. The new tunnel will have three vehicle lanes and a dedicated transit lane in each direction, with a separated active transportation corridor for cyclists and pedestrians." 

Given that this is supposed to be a major port region, a train and rapid bus crossing needs to eventually be there. A train connecting YVR to the Tsawwassen Ferry terminal and 2 rapid bus lanes. Then the main tunnel could still provide 3 general lanes each way, plus a HOV lane each way. https://www.infrastructurebc.com/project/fraser-river-tunnel-project/  

Unfortunately, proper big city size infrastructure is a difficult thing to achieve in backwards BC. Since the decision was made to not have a rail component in the new highway99tunnel, the middle 2 bike lanes should have been wide enough to eventually become 2 rapid bus lanes. Then a new bridge or parallel tunnel could have a YVR to ferry terminal train, plus 2 truck lanes, 2 bike lanes an 2 sidewalks. 

This is what a proper big regional port crossing should be like, but for backwater BC, its a different set of priorities. 

Friday, March 13, 2026

The Dunsmuir Tunnel in Downtown Vancouver, SkyTrain service to be reduced on weekends until June

https://dailyhive.com/vancouver/downtown-vancouver-skytrain-service-delays-weekends Had the old railway tunnel been originally designed to be double tracked, it could have been converted into a double level, 4 track LRT tunnel, instead of a 2 track LRT tunnel.

Ideally, if a subway or metro line doesn't have 4 tracks, 3 would be the next best thing. Then, 2 tracks could always remain operational while the 3rd is being repaired. For the most part, Skytrain is just a double track system. Unfortunately, the YVR-Canada Line is even single tracked at the end of the line in YVR and in downtown Richmond. 

The Canada Line should have been the 1st phase of an eventual south extension to Delta and the BC ferry terminal. Plus, a north extension from Waterfront_station_in Vancouver to Lonsdale_Quay and the ferry terminal. This would be a vital link between Canada_Line and the two regional ferry terminals. Unfortunately, Vancouver and BC are about maintaining congestion and transportation inefficiency.

Perhaps someday, if Vancouver is ever allowed to function like a proper big city, the Dunsmuir_Tunnel could be extended under Stanley Park and the 1st Narrows to Park Royal and to the ferry terminal. However, what's more likely to happen is that after the Dunsmuir_Tunnel reaches Waterfront_station, the line will continue east. 

https://evelazarus.com/the-dunsmuir-tunnel 

https://buzzer.translink.ca/2022/04/new-tunnel-technology-will-transform-your-skytrain-trip/ 

https://searcharchives.vancouver.ca/construction-progress-photo-of-cpr-dunsmuir-tunnel-10 

https://searcharchives.vancouver.ca/construction-progress-photo-of-cpr-dunsmuir-tunnel-9