Saturday, January 4, 2025

The O-Train Line 2 and 4 launch

"The lines will begin a five-day service on Jan. 6 (Monday through Friday) and will continue for a minimum of two weeks. Buses through routes B2 (formerly called Line 2 buses), 99 and 97 will run parallel seven days a week in case of any issues." https://ottawa.citynews.ca/2025/01/03/heres-what-to-know-before-o-train-line-2-and-4-launch

This makes a lot of sense & not just because Ottawa is far away from Vancouver & the backwards BC mentality. Trains & people can break down causing a disruption on the tracks. Plus, there is no urban rail or commuter rail line in Canada that's running 24hrs a day. This means that its a good idea to have an express bus route that closely follows each train line 24hrs a day.

Greater Vancouver seems to always be a sleep at the wheel, or just inept with proper urban planning. Once the public was informed that the Skytrain won't be a 24hr system. Therefore, it would be a good idea to have express busses running parallel to each line 24hrs a day. 

Unfortunatly, the backward BC planning mentality never allowed for the SkyBridge_linking_NW_and_Surrey_with_SkyTrain to have enough space for 2 bus-lanes, 2 bike-lanes & 2 footpaths. https://en.wikipedia.org/wiki/Skybridge_(TransLink) The bridge has none of that, as if to conform to a BC bottleneck agenda. 

The 4 lane Pattullo_Bridge and the 4 lane Queensborough_Bridge were never designed with wide sidewalks & 2 wide emergency lanes. For if they were, then a few decades ago both bridges could have provided 3 lanes each way & have adequate space for bike lanes. A 3rd lane each way would have been great for buses, but that might improve the congestion.

While the new Pattullo_Bridge will actually have wide sidewalks on each side, no serious consideration was given to having 2 bus-lanes, despite the Skytrain not being a 24hr system. So buses, trucks, ambulances & cars will all have to be funneled into only 2 lanes each way. Having 2 bus lanes & 2 wide emergency lanes would actually go against the BC bottleneck mentality.

Even considering budget limitations, the new Pattullo-Bridge should have been designed with a provision for a future lower deck & open with 3 lanes each way & have 2 wide emergency lanes. Apparently, having the Pattullo-Bridge-Replacement with only 2 lanes each way & no emergency lanes somehow will make it easier for emergency vehicles to cross. Of course its the opposite effect, but this is backwards BC.

SurreyDelta & all of Langley, already have as many people, if not even more people than Ottawa, but the infrastructure is so lacking in BC. Thus, a new 4 lane bridge will be an instant chokepoint between NW & SurreyDelta & Langley. A 10 lane bridge & a 10 car Skytrain is what a proper urban area of over 3 million people would plan for.  

While Vancouver has less people than Ottawa, the BC Lower_Mainland has more people than Calgary, Edmonton & Winnipeg, combined. Thus, its very strange that Vancouver & BC insist on a congestive planning approach.

The 4 lane Queensborough_Bridge in NW has enough space to accommodate a parallel 4 lane bridge. While some backwater BC types might freakout with an 8 lane crossing there, they don't realise that a 4 lane bridge is very limited. Thus, by having two 4 lane bridges, there could be a bus & a truck lane each way as well as 2 general lanes each way. Not having dedicated bus & truck lanes for what is supposed to be a major port is absurd, but its OK for backward BC. 

In backwards BC its desired to not have a rail transit component on any of the current road bridges. Indeed, most of the bridges are so narrow that there isn't enough room for either bus lanes or HOV lanes.

https://en.wikipedia.org/wiki/Queensborough_Bridge