Saturday, January 4, 2025

The O-Train Line 2 and 4 launch

"The lines will begin a five-day service on Jan. 6 (Monday through Friday) and will continue for a minimum of two weeks. Buses through routes B2 (formerly called Line 2 buses), 99 and 97 will run parallel seven days a week in case of any issues." https://ottawa.citynews.ca/2025/01/03/heres-what-to-know-before-o-train-line-2-and-4-launch

This makes a lot of sense & not just because Ottawa is far away from Vancouver & the backwards BC mentality. Trains & people can break down causing a disruption on the tracks. Plus, there is no urban rail or commuter rail line in Canada that's running 24hrs a day. This means that its a good idea to have an express bus route that closely follows each train line 24hrs a day.

Greater Vancouver seems to always be a sleep at the wheel, or just inept with proper urban planning. Once the public was informed that the Skytrain won't be a 24hr system. Therefore, it would be a good idea to have express busses running parallel to each line 24hrs a day. 

Unfortunatly, the backward BC planning mentality never allowed for the SkyBridge_linking_NW_and_Surrey_with_SkyTrain to have enough space for 2 bus-lanes, 2 bike-lanes & 2 footpaths. https://en.wikipedia.org/wiki/Skybridge_(TransLink) The bridge has none of that, as if to conform to a BC bottleneck agenda. 

The 4 lane Pattullo_Bridge and the 4 lane Queensborough_Bridge were never designed with wide sidewalks & 2 wide emergency lanes. For if they were, then a few decades ago both bridges could have provided 3 lanes each way & have adequate space for bike lanes. A 3rd lane each way would have been great for buses, but that might improve the congestion.

While the new Pattullo_Bridge will actually have wide sidewalks on each side, no serious consideration was given to having 2 bus-lanes, despite the Skytrain not being a 24hr system. So buses, trucks, ambulances & cars will all have to be funneled into only 2 lanes each way. Having 2 bus lanes & 2 wide emergency lanes would actually go against the BC bottleneck mentality.

Even considering budget limitations, the new Pattullo-Bridge should have been designed with a provision for a future lower deck & open with 3 lanes each way & have 2 wide emergency lanes. Apparently, having the Pattullo-Bridge-Replacement with only 2 lanes each way & no emergency lanes somehow will make it easier for emergency vehicles to cross. Of course its the opposite effect, but this is backwards BC.

SurreyDelta & all of Langley, already have as many people, if not even more people than Ottawa, but the infrastructure is so lacking in BC. Thus, a new 4 lane bridge will be an instant chokepoint between NW & SurreyDelta & Langley. A 10 lane bridge & a 10 car Skytrain is what a proper urban area of over 3 million people would plan for.  

While Vancouver has less people than Ottawa, the BC Lower_Mainland has more people than Calgary, Edmonton & Winnipeg, combined. Thus, its very strange that Vancouver & BC insist on a congestive planning approach.

The 4 lane Queensborough_Bridge in NW has enough space to accommodate a parallel 4 lane bridge. While some backwater BC types might freakout with an 8 lane crossing there, they don't realise that a 4 lane bridge is very limited. Thus, by having two 4 lane bridges, there could be a bus & a truck lane each way as well as 2 general lanes each way. Not having dedicated bus & truck lanes for what is supposed to be a major port is absurd, but its OK for backward BC. 

https://en.wikipedia.org/wiki/Queensborough_Bridge