Wednesday, October 22, 2025

'Insufficient evidence' to conclude city building inspectors taking bribes in Vancouver

 https://www.biv.com/news/entertainment-media-sports/vpd-insufficient-evidence-to-conclude-city-building-inspectors-taking-bribes-vancouver-11383302 

Allegations remain as allegations. 

However, in an unrelated matter, there was a case of total $HIT-BOX mismanagement and excrement.  Billions of dollars wasted in a $HIT-PIPE DREAM. https://www.cbc.ca/news/canada/british-columbia/metro-vancouver-board-votes-to-pause-nswwtp-review-until-legal-dispute-settled-1.7594512 

https://www.nsnews.com/local-news/metro-vancouver-halts-view-into-wastewater-plant-boondoggle-10994469

Then there is the case as to why the Canada+Line+is+so+under-built. Apparently, as a rushed and inept cost saving measure, the Canada+Line wouldn't have 152.4m long stations like the Montreal Metro or even the Edmonton LRT stations, which range from 125m to 130m. Despite its 2 billion dollar cost the Canada-Line wasn't designed with that much future capacity in mind. The ridiculously short 50m stations should have been roughed out or level for at least 100m, if not even 160m. That would have allowed for future 5-8 car trains. 

Ultimately, as a long-term, high capacity link between YVR and the 2 main ferry terminals, the stations should have had a 200m level clearance. That would have allowed for ten, 20m car trains. Unfortunatly, no provision for a 10 car train, not even a 5 car train, just an absurd 2.5 car short train, someday. 

$HIT-BOX mismanagement and opting for short trains is such careless urban infrastructure planning. 

https://www.nsnews.com/local-news/metro-vancouvers-pledge-for-reforms-insufficient-district-of-north-van-councillor-says-10716480

https://www.biv.com/news/economy-law-politics/metro-vancouver-slashes-sewage-plant-cost-by-39b-but-risks-long-term-bill-11303969

The BC Mind Virus is such a horrible thing, but it officially doesn't exist. Yet, the crappy approach to things endures.