Monday, November 17, 2025

Broadway Subway Construction as of November 2025

 https://www.youtube.com/watch?v=Uot7oIA9-ZE The station platforms will be 80m, which can only accomodate a 5 car train.

Unfortunatly, even if this segment had 500' or 152.4m long stations like the Montreal Metro, the rest of the first 2 lines only have 80m stations. Thus, 80m is only about 52% of the length of a Montreal Metro station, which can accomodate 9 car trains. It's taken until 2025 for the SkyTrain to gradually start running 5 car trains. In theory, if two Vancouver 80m trains run at twice the frequency as one 152m Montreal Metro train, a similar capacity could be attained. 

However, in the long run, it would have been much more cost effective to have the first 2 SkyTrain lines stations already roughed out to 152m, or a least have enough level clearance to eventually become twice the length. But that's what a proper big city would do, something that Vancouver is against.   

Even as an initial cost saving measure, the YVR-Canada Line should have opened with 100m stations, instead of the inadequate 50m joke. Then it could immediately accomodate 5 car trains. The station platforms should have had enough level clearance to eventually accommodate a 160m long train consisting of 8 cars reaching both ferry terminals. Of course there seems to be no plan to connect YVR to both ferry terminals.

Its very difficult for BC cities to allow proper big city size infrastructure, because that would symbolize a pro growth initiative. Since the world is mostly composed of non-white people, a slow growth agenda became a clever way to symbolically demonstrate a refusal to build big. BC is multicultural, but Canada has less than 1% of the worlds population. Even in the 2020s, BC still retains some of its colonial outpost mentality. Just keep things small and backwards and try to remain a backwater for as long as possible.