https://www.delta-optimist.com/local-news/expect-noise-vibration-during-upcoming-massey-tunnel-replacement-11436394 This B$ should have been done a few decades ago.
A 10 lane bridge with 2 bus lanes, 2 HOV lanes & 2 wide shoulder-emergency lanes, plus at least 3 general lanes each way, could have been a nice wide crossing. Some 12 lanes, including the 2 emergency lanes. Plus, a provision for at least 2 LRT tracks.
Instead, it's a 3 lane each way tunnel with the 4th being a bus lane. No HOV lanes and no emergency lanes & especially, no train tube section.
So, just like the YVR-Canada (embarrassment) Line, this new 8 lane tunnel will eventually require some major upgrades.
Eventually, a YVR-Canada Line bridge or tunnel will have to be built so that someday, trains can go between the airport and the ferry terminal. Such a train crossing should be parallel to the new highway tunnel. A new train tunnel or bridge should have at least 3 tracks, 2 rapid bus lanes and 2 bike lanes and sidewalks. Then the bus lanes in the highway tunnel could become HOV lanes.
https://jfdatalinks.blogspot.com/search?q=Massey+Tunnel+replacement
https://jfdatalinks.blogspot.com/search?q=Richmond+and+Delta