Showing posts sorted by date for query Canada Line. Sort by relevance Show all posts
Showing posts sorted by date for query Canada Line. Sort by relevance Show all posts

Monday, June 8, 2026

The Unusual transportation approaches used in Vancouver

 https://www.vancouverisawesome.com/history/5-of-a-kind-unusual-modes-of-transportation-used-or-nearly-used-in-vancouver-12388220 

Vancouver is such an unusual and backwards city with its inefficient and congestive approach towards transportation infrastructure.

Getting rid of the streetcars and interurban trams was utterly foolish! Fortunately, such MADNE$$ wasn't adopted in Melbourne, SF, Toronto, Boston, Philadelphia and New Orleans. 

Just because a no freeways mandate was chosen for Vancouver, the streets should have been kept wide enough for busses as well as other vehicles. 

https://movementyvr.ca/the-case-of-vancouvers-nine-missing-bus-lanes

Despite most of the Vancouver bridges being too narrow, some bridge lanes were removed, because the city wasn't interested in building parallel bike bridges. 

Since most of the bridges are so narrow, there isn't enough room for proper express bus lanes. Of course the city isn't interested in building parallel bus bridges next to the narrow bridges. 

Since Vancouver is supposed to be a major, properly functioning city in Western Canada, the city should have pressed the designers of the first 2 Skytrain lines to make sure that all of the 80 m stations could gradually be extended to 152.5 m, the same as the 500 foot long Montreal Metro stations and trains.

Unlike the first 2 Skytrain lines, the Canada Line was only designed to ultimately have 50 m stations and trains. A 2 billion dollar line to YVR could have been designed in such a way that would have allowed it to look and function like a proper big-city passenger train. 

A commuter train to the North Shore keeps taking a long time to be finalized.

https://northshoreconnects.ca/wp-content/uploads/2021/10/BIRT-Benefits-Assessment_Final.pdf

Think small and build backwards, or not at all. 

Tuesday, June 2, 2026

Seoul's Subway System Is Decades Ahead of many others

 https://www.youtube.com/watch?v=PPlGQDpx4xg 

While there could be a reasonable argument that if a subway or elevated line isn't expected to be that busy in its first few years, then just build half-size stations and run half-length trains. However, in the case of backwards Vancouver, what should have been stations that were designed to accommodate at least 5 car trains, were only designed for an eventual 2.5 car train. Thus, it will be challenging enough just to modify the incredibly short Canada Line stations to gradually accommodate 3 full-size 20 m cars, not just some 2.5 car joke of a train for a 50 m station. 

Fortunately the Skyline_(Honolulu) stations can accommodate a 4 car train right from the start. Someday, with SDO a 4 car train could become a 6 car train.

If Selective+Door+Operation (SDO) can ever be implemented on the YVR-Canada Line then it can go from being a 2 car joke of a train to a 3 car attempt of a train. Then, once people got used to 3 car trains, an extra car could be added at both ends, thus allowing for a 5 car train. 

Ultimately, the YVR-Canada+Line should have been designed as a proper big-city size train with 8-10 cars. There seems to be such a lack of proper long-term transportation infrastructure planning in BC. To just build a small-scale line as a symbolic demonstration of reluctance towards the Pacific Rim is so absurd. 

Fortunately, Melbourne, Sydney and Brisbane never opted for such a short train.  


There Is a Hidden City Under Seoul Nobody Talks About. https://www.youtube.com/watch?v=pIewf8sOZ0I

Monday, June 1, 2026

Yaletown–Roundhouse station's fare gate capacity increased by 66%

 https://dailyhive.com/vancouver/skytrain-yaletown-roundhouse-station-additional-fare-gates-completed 

The Canada line is such a watered down version of what should have been a proper big city airport and ferry rapid transit link. Just because this infrastructure project had to be scaled down during its first phase, the stations still could have been designed to eventually accommodate 5-6 car trains. Unfortunately, the stations were only designed to accommodate a 2.5 car train. While this perfectly fits in with the inept urban transportation mentality and especially fits in with the BC congestive transportation agenda, this is another sad result. 

https://dailyhive.com/vancouver/skytrain-yaletown-roundhouse-station-fare-gate-expansion

Despite being downtown with several condominiums around, the Yaletown-Roundhouse_station is too small for an inner-city station.

https://en.wikipedia.org/wiki/Yaletown-Roundhouse_station#Station_information 

https://upload.wikimedia.org/wikipedia/commons/thumb/f/f4/Yaletown_Roundhouse_Stn.jpg/1280px-Yaletown_Roundhouse_Stn.jpg 

There is barely enough level clarence beyond the short platform for another car. To remedy this inadequate situation, this line needs to have three full-size cars, not just some eventual 2.5 car joke of a train. 

https://www.eke-electronics.com/automatic-selective-door-operation-asdo 

Then eventually, once people got used to a 3 car train, an extra car could be added at each end, resulting in a 5 car train. Its a workaround that can eventually enable the 3rd line or the C Line to run 3-5 cars trains to meet demand. 

Then the Exp. Line and Mil. Line, or what could become A & B lines with standard 5 car trains. However, during the busy times, a 7 car train could be possible with selective-door-operation technology. 

It would have been better to have just built all of the Skytrain stations long enough for 5 car trains in the first place, with enough level track clearance for 10 car trains eventually.

Sunday, May 31, 2026

Vancouver 450 ft and Fahrenheit 451

Was a 450 foot height restriction just a chance, or was it intentionally made to be very close to 451 Fahrenheit? Honolulu is still stuck around that maximum, while San Diego is at 500 feet.

 https://en.wikipedia.org/wiki/Fahrenheit_451 (1953) By the 1950s, so many things were already banned, watered down or scaled back in provincial Vancouver. Generations later, there was the No Fun Vancouver mind virus that further tried to cancel out things in such a small city with so much red tape and other ridiculous obstacles.

https://en.wikipedia.org/wiki/Fahrenheit_451_(1966_film) By the mid and late1960s, the city made sure that its first office tower to have more than 29 floors wouldn't be until the 1970s. Its highly doubtful that Vancouver will have an office tower over 40 stories by 2030. However, Burnaby and Surrey could, because they aren't under the extreme restrictions of Vancouver. 

It wasn't until 1973 when Vancouver allowed its first building to be taller than the Los_Angeles_City_Hallhttps://en.wikipedia.org/wiki/Los_Angeles_City_Hall 

The Scotia_Tower (stump) is a good reference point to visualize the small scale of backwater Vancouver, as its about the same height as the Los_Angeles_City_Hall at 453'. 

https://www.skyscrapercenter.com/building/scotia-tower/4396 453'

https://skyscraperpage.com/b65/vancouver/the-scotia-tower 452'

https://en.wikipedia.org/wiki/Fahrenheit_451_(2018_film) By 2018 it was quite apparent that Vancouver was in the process of allowing for more buildings over 450 feet. However, nothing has been permitted to reach 700 feet, so far. A tower over 1000 feet would help to water down its provincial mindset. 

https://upload.wikimedia.org/wikipedia/commons/thumb/1/14/Vancouver_panorama_%2849988799796%29_%28cropped%29.jpg/3840px-Vancouver_panorama_%2849988799796%29_%28cropped%29.jpg

SF, Sydney & Auckland are just as scenic as Vancouver & warmer throughout the year. They all have taller building than what Vancouver currently permits. Seattle is just as scenic as Vancouver, but its allowed to function like a proper big city, because it doesn't have the imposed restrictions like Vancouver has. While its cold, damp & depressing like Vancouver during the fall & winter, Seattle usually gets noticeably hotter summers than Vancouver, BC. The tallest building in Seattle is the 76 story B of A office tower. 

https://upload.wikimedia.org/wikipedia/commons/thumb/5/57/LA_Skyline_Mountains2.jpg/1280px-LA_Skyline_Mountains2.jpg While the L.A. City Hall looks like a stump there, in Vancouver it would still be one of the prominent buildings.

Everything is so small or scaled back in Vancouver. Even the Greater Vancouver mountains aren't allowed to be as tall as the ones in L.A. While the San_Francisco_Bay & Port_Phillip Bay by Melbourne are big next to their cities, English_Bay in_Vancouver is so much smaller. Its even smaller than Elliott_Bay by Seattle. 

Vancouver really needs to have bus and HOV bridges built next to its mostly narrow & congested bridges. Only a 5 car Skytrain is the max on the first 2 lines and ultimately, just a 2.5 car joke of a train on the YVR-Canada Line. 

Selective+Door+Operation can allow a short train to have an extra car at each end, despite a shorter platform. 

https://upload.wikimedia.org/wikipedia/commons/thumb/5/5e/Vancouver_sunset_%28J%29.jpg/3840px-Vancouver_sunset_%28J%29.jpg 
https://upload.wikimedia.org/wikipedia/commons/thumb/6/69/Los_Angeles_with_Mount_Baldy.jpg/3840px-Los_Angeles_with_Mount_Baldy.jpg

Australia like the USA, has some big & tall cities on the Pacific Rim. However, Vancouver symbolically kept watering down its size, because that's how you demonstrate a reluctance towards proper urban planning & growth. 

Oddly enough, the small scale Vancouver mentality & agenda wasn't adopted by most cities around the world. Officially, there is no Vancouver Mind Virus (VMV), but somehow it keeps manifesting, just like the BCMV. 

Despite its size, Canada has less than 1% of the worlds population.

Thursday, May 28, 2026

A look inside the new Oakridge Park

 https://dailyhive.com/vancouver/oakridge-park-mall-vancouver-completion-opening-photos 

There should have been at least 5 car trains stopping at all the stations by now. Unfortunately, because of backwards Vancouver and backwater BC planning standards, the Canada Line stations are only level and long enough to accommodate a 2.5 car joke of a train. 

https://thecanadaline.com/station-history/oakridge-41st


https://jfdatalinks.blogspot.com/search?q=Oakridge+Park+Mall

Saturday, May 23, 2026

Construction means stal̕əw̓asəm Bridge closures this weekend and next

 https://www.ctvnews.ca/vancouver/article/construction-means-stalwasm-bridge-closures-this-weekend-and-next/ 

Time in backwater BC doesn't matter, the old bridge just had 4 lanes and the new bridge will only have two lanes each way for quite a while. Of course no bus and HOV lanes, no wide emergency lanes and no wide shoulders. That would go against the BC bottleneck-chokepoint planning mentality. Just like an absurd 2 car train for the Canada Line and a 3 lane Lion Bridge with no bus and train tunnels to help it.

Apparently, narrow bridges and short trains are better for backwards BC.

That's the BC Mind Virus (BCMV) at work once again.

Friday, May 22, 2026

Canada Line station platforms being extended for interchange hub with Broadway Subway

 https://dailyhive.com/vancouver/canada-line-broadway-city-hall-station-platform-extension-millennium-line-interchange Fortunatly, the planning for the TTC Subway, Montreal Metro & Edmonton LRT, all have much longer stations than what backwards Vancouver settled for. 

https://dailyhive.com/vancouver/skytrain-canada-line-rebuilding

Once all of the YVR-Canada Line stations have 50-metre-long platforms, it will become quite apparent that the long-range planning for 5 car trains wasn't seriously considered. The 50 m stations will only be long enough for a 2.5 car joke of a train. 

However, there is a potential to work around this particular manifestation of the Vancouver Mind Virus. Selective_door_operation can allow for longer trains, despite the ridiculous short Vancouver stations. 

https://en.wikipedia.org/wiki/Selective_door_operation#International_variations


There is such a problem with Vancouver and BC in general of not properly planning for future transportation infrastructure expansion. 

https://www.railforthevalley.com/latest-news/zweisystem/the-skytrain-lobby-get-over-it/

Thursday, May 21, 2026

The new Capstan Station recorded SkyTrain's fourth-lowest ridership after one year

 https://dailyhive.com/vancouver/skytrain-capstan-station-ridership-canada-line 

Wow, this picture almost makes it look like its a big-city train station and not just a 2 car train joke. The CLine should have opened with 5-6 car trains, or at least 3 car trains. Any station can have the potential of becoming more popular, especially when there are more residential and business structures close to it. 

The Can-Line could really benefit from Selective+Door+Operation, which would allow for longer trains.


How Copenhagen built a metro for free https://www.youtube.com/watch?v=GzamwVH3CXU&t=8s At least this could run 3 car trains right from when it started.

Thursday, May 14, 2026

Vancouver mayor submits motion to cut back on some climate bylaws for the sake of affordability

 https://dailyhive.com/vancouver/vancouver-mayor-city-climate-bylaws 

So, after all threes years, no money went towards a city and a regional bus bridge network. The existing bridges are too narrow to accommodate 2 express bus lanes, so there should have been parallel bus bridges built by now. 

The Canada Line wasn't designed to have at least 5 car trains, only a 2.5 car joke of a train, someday. Since 2009, only 2 car trains have been running, when there should have been 3. Despite the ridiculously short stations, there should have been modifications to have at least 3 full-size cars by now. Its as if not enough funds still haven't been put towards such a short train , since 2009.

Wednesday, May 13, 2026

Is the SkyTrain (YVR) Canada Line under-built and nearing capacity, because of Short platforms and trains?

https://dailyhive.com/vancouver/short-platforms-and-trains-is-the-skytrain-canada-line-under-built-and-nearing-capacity

Its one thing to build a line with stations that are only a 3rd of the length of a Montreal Metro station, but to no not properly allow for enough future level clearance is so inept. 

https://en.wikipedia.org/wiki/Selective_door_operation#International_variations

https://dailyhive.com/vancouver/skytrain-canada-line-rebuilding 

https://dailyhive.com/vancouver/canada-line-skytrain This and the 3 lane Lion Bridge should get an award for the blatant symbolism of not wanting to build proper big-city infrastructure in backwards BC.

Tuesday, May 5, 2026

The urban trifecta of backwards Vancouver

https://www.merriam-webster.com/dictionary/trifecta 

https://en.wikipedia.org/wiki/Trifecta#History 

Ideally, for some small thinking cities, the plan is to symbolically have mostly short buildings and short trains and mostly narrow bridges.

That seems to have been the goal of Vancouver over the past several decades. In contrast, Brisbane after its Expo 88, was able to really go into big city planning mode, because it doesn't have anything like the excessive Vancouver restrictions holding it back. 

The+Typical+Vancouver+Size+Stump+Building No office tower has been permitted to have a 40th floor. https://jfdatalinks.blogspot.com/search?q=The+Stumpy+Post+building+in+Vancouver Never-mind 40 or 50 stories, it wasn't even allowed to have 25 floors.

YVR-Canada+Line A 2 car joke of a train. 

Lions+Gate+Bridge A 3 lane joke of a bridge.  



https://jfdatalinks.blogspot.com/search?q=backwards+Vancouver

Friday, May 1, 2026

Link 2 Line Cabview POV Seattle to Redmond Eastbound

 https://www.youtube.com/watch?v=JlJHHuLdOj0 

Unlike backwards Vancouver, Seattle, WA has longer underground stations, just like Edmonton has. Longer stations make it easier to have longer trains. 

The Narrows Bridge in Perth, WA, Australia https://www.youtube.com/watch?v=k6mVXcX-4h4 It has 5 lanes each way and 2 commuter train tracks. The Homer_M._Hadley_Memorial_Bridge is part of an 8 lane I-5 crossing with 2 LRT tracks. The Samuel-De_Champlain_Bridge has 8 lanes, plus 2 REM commuter train tracks. These 3 fantastic bridges were all possible, because they aren't in heavily restrictive Vancouver. Plus, WA and Que. never wanted to adopt the BC-B$ approach to things.

Unfortunately, in backwards BC, the 1st two Skytrain lines only have 80m stations and the YVR-Canada Line has 50m joke stations. Some of the stations on the first 2 lines might have enough level clearance to only have an extra car at either end of a lengthened platform. 

However, the shortsighted Canada Line wasn't designed to eventually accommodate 5 car trains, just a 2.5 car joke of a train, someday. It was as if someone thought that there was no need to have enough level clearance so that the very short stations could be double or tripled in length eventually.

At least by 2025, the first SkyTrain line was running some 5 car trains. Unfortunately in 2026, the 2nd Line and the 3rd Line are still only running 2 car joke trains. Every Skytrain line should have had stations designed to eventually accommodate 8-10 cars trains, but that's what a proper big city would do. Backwards Vancouver wants to hold out for as long as possible, by symbolically building small.

Sunday, April 5, 2026

Vancouverites have some of the longest commutes in Canada

 https://dailyhive.com/vancouver/vancouver-longest-commute-canada 

With most of the regional bridges being too narrow, there isn't enough space for proper express bus+lanes or BRT lanes. Plus, the first 2 Skytrain lines only have the potential to accommodate 5 car trains. The Canada (Embarrassment) Line wasn't designed to eventually have 5 car trains, only 2.5 car trains. Narrow bridges and short trains are all part of the symbolic reluctance towards having proper big city size infrastructure.


https://jfdatalinks.blogspot.com/search?q=bus+and+bike+bridge

Monday, March 30, 2026

Its Not Just About Bus and Bike Bridges

Bike bridges might not be able to totally solve the transportation mess that is Vancouver. However, its quite odd how Vancouver Cycling_Infrastructure is missing a crucial bit of transportation infrastructure. Indeed, many cities will build least 1 proper bike bridge. The Vancouver approach is to take traffic lanes away from existing bridges, or not even bother to build a bike bridge next to a congested bridge. 

https://en.wikipedia.org/wiki/List_of_crossings_of_the_Fraser_River#North_Arm There should have been several bus and bike bridges in just this section alone. 

 https://bicyclenetwork.com.au/newsroom/2024/08/08/striking-perth-bridge-crosses-key-construction-milestone Unfortunatly, such a nice bike bridge in Perth isn't allowed in backwards Vancouver. 

https://www.mainroads.wa.gov.au/projects-initiatives/all-projects/metropolitan/causeway-path/

https://www.wsp.com/en-ca/projects/perths-boorloo-bridge If you are visiting Perth from Vancouver, you might cry when you realize what WA can do, simply because its not influenced or limited by the backwards BC mentality or mind virus.

https://www.destinationperth.com.au/listing/boorloo-bridge/3706 Unlike in backwards Vancouver, many cities build bike bridges so that they don't have to remove traffic lanes.

https://dissingweitling.com/en/project/swan-river-causeway-bridge 

https://www.buildingfortomorrow.wa.gov.au/projects/boorloo-bridge Unfortunatly, properly building-for-tomorrow is much more difficult in backwards BC than it is in WA. 

bike+bridge in the right spot can make a huge difference. A bus+and+bike+bridge can be a huge improvement, especially in the case of Vancouver and the Greater Vancouver Region. 

The Arthur_Laing_BridgeOak_Street_BridgeKnight_Street_Bridge and the Queensborough_Bridge all could be improved simply by building a bus+and+bike+bridge next to them. These bridges are simply too narrow to accommodate 2 bus lanes, 2 wide bike lanes and 2 wide footpaths.

The narrow North_Arm_Bridge for the very short Canada Line trains, is another lost opportunity. There should have been 2 express bus lanes, since the little train doesn't run 24 hours. There should have been 2 wide bike lanes as well as 2 sidewalks. 

Perhaps it was designed to be in the tradition of the narrow SkyBridge between NW and Surrey. Unfortunately, the SkyBridge wasn't designed to help the old Pattullo Bridge by accommodating 2 bus lanes, 2 bike lanes and 2 sidewalks.

While the Pattullo_Bridge_replacement opened with 2 nice bike lanes and 2 footpaths, there was a deliberate decision not to open it with 2 bus lanes and 2 HOV lanes. Especially, no wide emergency lanes or wide shoulders. Its another instant classic BC bottleneck-chokepoint. 

Somehow the Metro_Vancouver_Regional_District still hasn't realized that a regional network of bus and bike bridges can really help the region's mostly narrow bridges. Plus, proper big city long trains. 

https://en.wikipedia.org/wiki/Expo_Line_(SkyTrain) Only started to run some 5 car trains in 2025.

https://en.wikipedia.org/wiki/Millennium_Line Still usually only 2 car train with the option to run 4 and the potential to eventually run 5 car trains.

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)#Canada_Line Despite a building cost cutting measure, this joke of a train and its short stations still could have been designed with enough level clearance to allow for 5 car trains eventually. Unfortunately, this line was designed to ultimately just have 2.5 car, 50m trains. Since 2009, this line is still only running 2 car trains. 

Multigenerational congestion planning is all by design in backwards BC.


https://jfdatalinks.blogspot.com/search?q=bike+bridges

Sunday, March 29, 2026

Seattle's 'Crosslake Connection' draws steady crowds on second day

 https://www.youtube.com/watch?v=jabSGw2M4tA 

Seattle's New Light Rail On a FLOATING BRIDGE https://www.youtube.com/watch?v=vmh5uVguIlM  

Seattle's Sound Transit just expanded their Link Light Rail system by running the 2 Line across a floating bridge https://www.youtube.com/watch?v=vmh5uVguIlM&t=2s

https://www.seattletimes.com/seattle-news/transportation/seattle-light-rail-finally-opens-across-lake-washington/ 

https://www.railwayage.com/passenger/light-rail/sound-transit-readies-for-crosslake-connection-launch 

Seattle has a good extensive regional train system and its getting bigger and better.


Some years after Montreal and so many years after Perth, but still better than backwards Vancouver. 

https://montrealgazette.com/news/the-rem-what-you-need-to-know-about-the-new-era-in-montreal-transit/ 

https://www.railway-technology.com/projects/reseau-express-metropolitain-rem-light-rail-system-canada 


Perth Narrows_Bridge 

https://en.wikipedia.org/wiki/Narrows_Bridge_(Perth)#Railway_bridge:_2005

https://commons.wikimedia.org/wiki/File:6_car_train_on_narrows.JPG 

https://www.alamy.com/stock-photo-a-train-and-traffic-on-the-mitchell-freeway-crossing-over-narrows-127193937.html 

Unfortunately, all of these nice train and wide highway bridges aren't allowed in narrowminded Vancouver. A congestive transportation approach was implemented decades ago.

YVR-Canada Line and REM Train

 https://www.youtube.com/watch?v=a1ouk0VifwM&t=42s Even if the YVR-Canada Line had to initially be built as a symbolically small city train, urban transportation infrastructure can be designed in ways that can double or even triple capacity to meet future demand. Unfortunately, its very difficult to build anything in BC with significant future capacity in mind.

Ultimately, the YVR-Canada Line should have had level station clearances to eventually be able to accommodate 10 car trains. Unfortunately, in typical backwards BC planning the stations weren't even designed with enough level clearance to accommodate 5 car trains. The joke that is the Canada Line only has a level station clearance of 50m to eventually accommodate just a 2.5 car train. 

Most other cities actually build long stations to accommodate long trains right in the first place. Or, at least allow for enough level clearance so that the stations can eventually be doubled or tripled in length. 

The YVR-Canada Line should have started with the Vancouver & Richmond segment, then the Vancouver and Horseshoe+Bay+ferry+terminal segment. Then finally, the YVR to Delta and the Tsawwassen+ferry+terminal

The SkyTrain Stations in Greater Vancouver https://www.youtube.com/watch?v=6Qg78Bmf1fk

Unfortunately, proper big city transportation planning is very difficult to achieve in backwards BC. So much is watered down in Vancouver.


Montreal’s Biggest REM Expansion Yet https://www.youtube.com/watch?v=4G1oeIAfxDU&t=106s 

The Montreal REM https://www.youtube.com/watch?v=g9O6RzsXIqQ 

While the REM was designed to help the Metro, it should have the capability to be gradually expanded. Eventually, REM trains should be lengthened from 4 car trains to 6 and even 8 car trains. 

In contrast, every Skytrain line should have been designed with enough level future station clearance to eventually accommodate a train as long as a 152.5 (500 ft.) long Montreal Metro train. The first 2 Skytrain lines have 80m stations and the joke that is the Canada Line only has 50m stations. 

While the first 2 lines can accommodate 5 car trains, the C Line wasn't designed to accommodate 5 car trains. Just 2.5 car trains, someday. 

Despite there being such a symbolic push for Vancouver to keep having short trains, narrow bridges and stumpy buildings, things are gradually changing in backwards BC. The Vancouver or BC Mind Virus should have been challenged decades ago, but too many loud people wanted to perpetuate the, KEEP THINGS SMALL AND INDEQUATE agenda.

Given how most of the bridges in Greater Vancouver are so narrow, there isn't enough room for proper bus and HOV lanes, or even wide emergency lanes. One would think that at least the trains & stations would have been designed to eventually be doubled or tripled in length. But that would go against the mutigenerational congestive planning agenda. That's why there still is only a 3 lane LGB when there should have been at least a parallel bus, HOV and train tunnel. The Pattullo+Bridge replacement didn't open with 2 bus and 2 HOV lanes, not even wide shoulders or emergency lanes. NW really likes the congestive planning approach. Of course the new tunnel between Richmond and Delta won't have an additional provision for a train tube. This will also help to perpetuate the congestive transportation mandate. 

Fortunately, Selective_door_operation technology can eventually allow more sensible transportation planners to enable longer trains. 

https://en.wikipedia.org/wiki/Selective_door_operation#International_variations , https://www.youtube.com/watch?v=YdH5d1ZthmM 

This means that a 5 car Skytrain (85m) could eventually become a 7 car train, despite the 80m stations. 

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)_rolling_stock#Alstom_Mark_V Thus, an 80m train can become a 117m train.

A two car and 2.5 car (50m) train on the multibillion dollar Canada Line is so absurd and inept! With some slight station modifications, there could be a potential to eventually accommodate three, 20m cars at such short platforms. Then, once 3 car trains could become possible, its just a matter of having an extra 20m car at both ends of each train. A 5 car train of 100m is so much better than a 50m joke of a train. 

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)#Alstom_Mark_V_fleet 


https://jfdatalinks.blogspot.com/search?q=SkyTrain-Canada+Line

https://jfdatalinks.blogspot.com/search?q=REM

Thursday, March 26, 2026

K Line (Los Angeles Metro)

 https://en.wikipedia.org/wiki/K_Line_(Los_Angeles_Metro) 

https://la.urbanize.city/post/metro-seeks-state-funds-extend-green-line-platforms 

https://en.wikipedia.org/wiki/K_Line_(Los_Angeles_Metro)#Rolling_stock 

Car length89 ft (27.13 m)
Width8 ft 8+34 in (2.66 m)
Height12 ft 6 in (3.81 m)

https://en.wikipedia.org/wiki/Kinki_Sharyo_P3010 

https://upload.wikimedia.org/wikipedia/commons/thumb/0/07/LA_Metro_Rail_Expo_Line_Kinki_Sharyo_P3010_17th_St_Santa_Monica_College_Station_%2848943282587%29.jpg/960px-LA_Metro_Rail_Expo_Line_Kinki_Sharyo_P3010_17th_St_Santa_Monica_College_Station_%2848943282587%29.jpg  

https://www.metro.net/projects/kline-northern-extension Just like in SD, Seattle, Calgary and Edmonton, their LRT trains are longer than the ones on the first 2 Skytrain lines. Especially, the embarrassing Canada Line. 

https://www.latimes.com/california/story/2026-03-24/this-rail-line-would-get-you-to-grove-beverly-center-cedars-sinai-is-it-l-a-s-missing-link In backwards BC its like it takes 2 or 3 people to turn a lightbulb than someone in Quebec. An 80m Skytrain on the first 2 lines would have to be about twice as frequent as a 152.5m Montreal Metro train to match capacity. The ridicules 50m maximum allowance for Canada Line trains would have to run 3 times as frequently as a Montreal Metro train. 

https://la.streetsblog.org/2026/03/18/metro-committee-again-sides-with-nimbys-postpones-key-north-k-line-rail-decision Unfortunatly, the Vancouver Mind Virus is all about holding back the scale of the city. Thus, anytime that a bridge or street can be narrower, a building kept shorter and especially a train kept short, is all part of the imposed symbolism of refusing to build on a BIG city scale. 

Sunny L.A. has been thinking, planning and building like a BIG city for over a century. In contrast, rainy Vancouver has been refusing to think on a big city scale throughout its history. For several decades, all White city counsels kept imposing various restrictions to keep Vancouver on a small scale. 

Friday, March 13, 2026

The Dunsmuir Tunnel in Downtown Vancouver, SkyTrain service to be reduced on weekends until June

https://dailyhive.com/vancouver/downtown-vancouver-skytrain-service-delays-weekends Had the old railway tunnel been originally designed to be double tracked, it could have been converted into a double level, 4 track LRT tunnel, instead of a 2 track LRT tunnel.

Ideally, if a subway or metro line doesn't have 4 tracks, 3 would be the next best thing. Then, 2 tracks could always remain operational while the 3rd is being repaired. For the most part, Skytrain is just a double track system. Unfortunately, the YVR-Canada Line is even single tracked at the end of the line in YVR and in downtown Richmond. 

The Canada Line should have been the 1st phase of an eventual south extension to Delta and the BC ferry terminal. Plus, a north extension from Waterfront_station_in Vancouver to Lonsdale_Quay and the ferry terminal. This would be a vital link between Canada_Line and the two regional ferry terminals. Unfortunately, Vancouver and BC are about maintaining congestion and transportation inefficiency.

Perhaps someday, if Vancouver is ever allowed to function like a proper big city, the Dunsmuir_Tunnel could be extended under Stanley Park and the 1st Narrows to Park Royal and to the ferry terminal. However, what's more likely to happen is that after the Dunsmuir_Tunnel reaches Waterfront_station, the line will continue east. 

https://evelazarus.com/the-dunsmuir-tunnel 

https://buzzer.translink.ca/2022/04/new-tunnel-technology-will-transform-your-skytrain-trip/ 

https://searcharchives.vancouver.ca/construction-progress-photo-of-cpr-dunsmuir-tunnel-10 

https://searcharchives.vancouver.ca/construction-progress-photo-of-cpr-dunsmuir-tunnel-9