How the City Rail Link Transforms Auckland's Train Network while Vancouver is trapped by the BCMV

 https://www.youtube.com/watch?v=OmtSI3N57kM Auckland, like Brisbane, Sydney, Melbourne, Perth, Seattle, Edmonton, Toronto & Montreal... are just some of the cities that get to have longer train than provincial Vancouver.

https://en.wikipedia.org/wiki/City_Rail_Link  

"Although the trains are capable of having extra cars added in groups of three, the CRL station platforms, as originally specified, would not be long enough to accommodate nine-car trains. The proposed new capacity is 54,000 passengers per hour with the station platforms to be made longer so they can take the longer trains..." https://en.wikipedia.org/wiki/City_Rail_Link#Capacity_forecast_forces_platform_enlargements 

9 car trains are possible for Auckland, because there isn't anything like a Vancouver Mind Virus (VMV) to thwart it. 

https://www.cityraillink.co.nz/meet-your-stations 

https://en.wikipedia.org/wiki/Waitemat%C4%81_railway_station#Capacity Proper big city infrastructure planning and development, unlike backwards Vancouver.

https://en.wikipedia.org/wiki/Waitemat%C4%81_railway_station#Electrification 


In contrast is the joke that is the two car Canada_Line. There was a deliberate decision, (apparently to save money) to not have a future station level clearance of at lest 100 m, if not even 160 m. So instead of planning for at least 5 car trains, there is only enough space for a 2.5 car joke of a train, some day.

https://en.wikipedia.org/wiki/Canada_Line#Stations "The five busiest stations have platforms 50 metres (160 ft) long, while the rest of the stations have 40-metre (130 ft) platforms that can be easily extended to 50 metres." 

Being that this is a line which could eventually link YVR to the Tsawwassen Ferry Terminal & eventually Waterfront station with Park Royal and even the Horseshoe Bay Ferry Terminal, the BC Mind Virus (BCMV) got in the way.

https://en.wikipedia.org/wiki/Canada_Line#Technology "The capacity of the trains is estimated at 334 people per pair of cars (comfortably) or 400 people at crush load." 

Since each car is 20 m and the stations are designed to a maximum of 50 m, every effort should be made to try to eventually have 60 m platforms. Unfortunately, it might be difficult enough just to try to gradually have 55 m stations. Still, the initial goal should be to try to have a 3 car train of 60 m. 

Then with Selective+Door+Operation, a 3 car train could become a 5 car train. Its unfortunate that there is such bad transportation planning in Greater Vancouver. Compared to backwards Vancouver, its great that nothing like a VMV has prevented Auckland from eventually having 9 car trains. The Montreal Metro and the Stockholm Subway can also have 9 car trains. Unlike Vancouver, several cities have no problem thinking big.

Auckland is so far away from the backwards mentality of Vancouver. Thus, Auckland is allowed to have longer trains than provincial Vancouver and taller buildings and even a wider harbor bridge. Of course the same can be said about Sydney and several other cities. 

Sunday, September 6, 2026

A Speculative Map of Montreal Metro-REM-EXO

 https://www.reddit.com/r/TransitDiagrams/comments/1w9apwg/oc_montreal_metroremexo_speculative_map/ 

What if Montreal could have a Paris scale of transportation infrastructure? Unfortunately, Greater Montreal hasn't reached the 5 million point yet, let alone 10 million people. Thus, the really big city stuff is still quite a ways off. 

At least Montreal isn't stuck with a 3 lane LGB. So far, Vancouver isn't interested in building an express bus tunnel and an LRT tunnel next to the inadequate LGB. A line from Burrard_station to Park+Royal and the Horseshoe+Bay+ferry+terminal would be getting into proper big city transportation infrastructure. Just like a tunnel between Waterfront station and Lonsdale_Quay would be.

At least Le REM wasn't designed to be a 2 car joke of a train like the YVR-Canada+Line is. 

The stations on the first 2 Skytrain lines are barely half the length of a 9 car Metro station. While a REM station can accommodate a 4 car train, the Canada+Line stations can only accommodate a 2.5 car train, but only 2 car joke trains, so far.

Monday, August 31, 2026

VMV and BCMV

What is the Vancouver Mind Virus and the BC Mind Virus?

Sometimes, it can be a provincial backwater approach to things. Other times, its a total Half-A$$ED attempt towards getting something done in backwards BC.

Its taken the City of Vancouver a very long time to surpass half a million residents. Its amazing that Vancouver finally surpassed having 3 quarters of a million people. 

https://worldpopulationreview.com/cities/canada/vancouver 751,644 

It remains to be seen if Vancouver will ever have more people than Winnipeg. Indeed, Winnipeg, like Edmonton and Calgary don't have something like a Burnaby next to them, or a Surrey & Coquitlam close by. While Vancouver barely makes it into the top 10 biggest cities in Canada, Greater Vancouver is still the 3rd largest urban region in Canada. However, so much of the urban scale and infrastructure is being heled back.

The biggest cities in Canada don't have anything like a VMV to thwart or impeded their scale. Thus, Toronto, Calgary, Montreal & Edmonton all have taller buildings than stunted Vancouver. Edmonton and Montreal, like Seattle and Perth, WA are allowed to have wider bridges. Most major cities around the world have longer trains than what's in provincial Vancouver.

Is there a Canadian Mind Virus (CMV)? Of course not officially. Fortunately, nothing like a CMV ever made it to Australia. Otherwise something absurd like provincial Trade Barriers could have really thwarted things down under.

https://www.cbc.ca/news/politics/interprovincial-trade-barriers-9.7323970 

https://www.mnp.ca/en/insights/directory/what-are-the-barriers-to-interprovincial-trade-in-canada

https://www.canada.ca/en/intergovernmental-affairs/services/internal-trade/federal-investments-internal-trade.html 

Despite Canada being surrounded by water on 3 sides, there is no blue on the national flag. Fortunately, nothing like a CMV ever got Australia, NZ, the UK, France and even the US to remove blue from their flags. 

Of course the flags of England, Switzerland and Japan have no blue in them, but blue is still a very nice color to behold. 

Nothing on the scale of the 10 lane Narrows_Bridge_(Perth) is allowed in Vancouver, Victoria or Kelowna. Certainly, nothing like the Sir_Leo_Hielscher_Bridges exists in Halifax. Even Boston and Montreal don't have a 12 lane crossing like the Gateway_Bridges. 

Despite Australia having fewer people than Canada, its been able to exist on a larger scale in some ways. Its like there is still a plan to have a big country down under.


https://jfdatalinks.blogspot.com/search?q=VMV

https://jfdatalinks.blogspot.com/search?q=BCMV

Why New York City has a Two-Car Subway Train and provincial Vancouver is stuck with a 2 car airport train

 https://www.youtube.com/watch?v=xH37SqlW0Ks 

https://en.wikipedia.org/wiki/Franklin_Avenue_Shuttle 

https://en.wikipedia.org/wiki/R68_(New_York_City_Subway_car) 75-foot (22.86 m) length for each car. So roughly, a 2 car joke of a train is almost 46 m, or 150 ft. The absurd Canada_Line-Stations with its 2 car trains are in the 40 m to 50 m range. Thus, only two car & 2.5 car trains are only possible. In contrast, a 9 car Montreal_Metro train can be up to 152.5 m, or 500 ft.

Train length
  • 2 car train: 150 feet (46 m)
  • 4 car train: 300 feet (91 m)
  • 8 car train: 600 feet (180 m)

https://en.wikipedia.org/wiki/R68_(New_York_City_Subway_car)#Description So, an 8 car, 600 foot long train is 100 feet longer than a 500 foot, 9 car Montreal train. 

The end of the line for the Franklin_Avenue_Shuttle is only a single track platform. 

Unfortunately, the YVR and the Richmond end if the Canada_Line stations are also a single track platforms. Even if this was initially decided as a cost saving measure, a double track guideway still should have been built. Then, a proper double track station could eventually be completed. Especially if the line is ever extended to the Delta Ferry terminal.

The YVR-Airport_station was deliberately designed to be narrower and shorter than what a proper big city airport station should be. Its another example of the unofficial BCMV reducing and thwarting the scale of things. 

https://en.wikipedia.org/wiki/Pearson_Airport_station Almost like REM quality for Toronto, but not for provincial Vancouver. https://www.upexpress.com/en/up-express-stations/pearson-station , https://www.torontopearson.com/en/transportation-and-parking/up-express Wow, Toronto like Perth can run 3 car big city type trains. https://en.wikipedia.org/wiki/Union_Pearson_Express#Rolling_stock Vancouver can only hope for a 2.5 car train, someday. 

https://en.wikipedia.org/wiki/Union_Pearson_Express#Route Sometimes, a 2 car joke of a train might be OK to start with, but there should already be enough station clearance for at least 3-5 car trains. Then, as long as its a walk-through train, Selective_Door_Operation (SDO) can make it possible to add an extra car at both ends of a short train. SDO can be an intermediate step before having to extensively lighten each station. 

Stubborn, backwards Vancouver will eventually have to seriously consider SDO in order to have longer big city type trains. Unfortunately, as long as its stuck in the BC backwater mentality or under the spell of the BCMV, things won't improve.

https://canada.constructconnect.com/dcn/news/projects/2026/05/montreals-airport-rem-station-will-have-signature-iceberg-motif , https://montrealgazette.com/news/rem-has-begun-testing-trains-on-airport-branch Of course the YUL-P.E. Trudeau_station, like the Honolulu Airport station, will be longer and wider than the one at YVR.

Perhaps the short, single track & platform at the YVR-Airport_Station would be impressive if it were in Victoria, Prince George, Kamloops or Kelowna, but its hardly impressive when compared to the SeaTac/Airport_station, Portland_Airport_station, Lelepaua_station in Honolulu, Brisbane_Airport station, Sydney_Airport stations, the future Melbourne_Airport station and Perth_Airport station. The scale of the San_Francisco_International_Airport_station, which can accommodate 10 car trains, is on a whole other scale. All major airports and their train stations in Asia & Europe are so far beyond what Canada has. There is no reason as to why Greater Vancouver and some other cities in BC, can't be upgraded to a Pacific Rim infrastructure level, instead of  being stuck in a perpetual BC backwater mindset. 

The VMV, under the umbrella of the larger BCMV, is such a horrible impediment and it doesn't even officially exist. 

Louis-Hippolyte-La Fontaine Bridge–Tunnel

 https://en.wikipedia.org/wiki/Louis-Hippolyte-La_Fontaine_Bridge%E2%80%93Tunnel 

https://www.quebec.ca/transports/infrastructures-projets/projets/projets-routiers/montreal/tunnel-louis-hippolyte-la-fontaine/fermetures 

https://pomerleau.ca/en/projects/project/major-rehabilitation-louis-hippolyte-la-fontaine-tunnel 

https://montreal.citynews.ca/2026/08/25/major-road-construction-montreal-fall/  


https://jfdatalinks.blogspot.com/search?q=L.H.-La+Fontaine+Bridge-Tunnel

Wednesday, August 26, 2026

Wednesday, August 19, 2026

REM operator apologizes for lack of communication during morning disruptions

 https://www.cbc.ca/news/canada/montreal/rem-operator-apologizes-for-lack-of-communication-during-service-outages-wednesday-morning-9.7312084  

https://exo.quebec/en

At least the REM started out on a grander scale than the Skytrain. With SDO, a 4 car train could easily become 6. Then, as long as there is enough level station clearance, longer platforms should be possible. 

Someday, SDO could even allow a 9 car Montreal Metro train to have 11 car trains like in NYC on the 7. 

https://en.wikipedia.org/wiki/7_(New_York_City_Subway_service)#Fleet 11 car trains. 

Monday, August 17, 2026

The Oakridge–41st Avenue Station

https://dailyhive.com/vancouver/oakridge-41st-avenue-station-early-closure-construction-august-2026

 https://www.richmond-news.com/highlights/vancouver-canada-line-station-close-early-august-2026-12675151 

https://www.google.com/maps/place/Oakridge-41st+Avenue 

https://dailyhive.com/vancouver/canada-line-skytrain For a line of B$ to have opened in 2009 and is still only using 2 car joke trains is a pretty sad example of inept transportation infrastructure planning. 

Even using the argument that it was necessary to have a watered down or scaled back the YVR-Canada+Line to save money, this line of B$ still could have been designed to eventually become a proper big city like train. As long as the 50 m stations were designed with a future level clearance of 130 m to 153 m, the underground stations could have been as long as the Montreal Metro stations, or at least as long as the underground Edmonton LRT stations.

The YVR-Canada Line since 2009

The Canada_Line opened with 2 car trains and is still running just 2 car trains. https://www.youtube.com/watch?v=a1ouk0VifwM&t=817s

https://thecanadaline.com/station-history No reasonable attempt was made to make sure that the stations could eventually accommodate at least 5 car trains. 

https://en.wikipedia.org/wiki/Canada_Line#Stations The inadequate 50 m stations can only accommodate a 2.5 car train, not a 5 car train.

https://globalnews.ca/news/5778392/canada-line-10-year-anniversary/

https://buzzer.translink.ca/2024/08/skytrains-canada-line-marks-15th-anniversary/

https://en.wikipedia.org/wiki/Canada_Line#Technology 

https://www.atkinsrealis.com/en/projects/the-canada-line 

https://thetyee.ca/News/2025/01/31/Canada-Line-New-Stop-Years-Making/ 

https://www.bb-gi.com/investment/canada-line/ 

 Airport to Downtown Vancouver Transit Guide (Don't Take a Taxi!) https://www.youtube.com/watch?v=9bNYrJhUgu0

https://www.railforthevalley.com/latest-news/zweisystem/should-we-convert-the-canada-line-to-light-rail-2 

 This $9 Train Saves You $40 at Vancouver Airport (YVR to Canada Place) https://www.youtube.com/watch?v=ZxUpww86dow

Fortunately, the REM trains in Montreal can accommodate 4 car trains, as does the Skyline_(Honolulu). 

The big mistake for all 3 of the Skytrain lines was not having all of the stations to be capable of accommodating 6-8 car trains. Plus, allowing for a future level station clearance of 153 m-160 m. That would have allowed Greater Vancouver to start of with short REM & Skyline type trains, with the capability to eventually have trains as long as those on the Montreal_Metro.  

Proper big city transportation infrastructure is so difficult to plan and build in backwards BC.


https://jfdatalinks.blogspot.com/search?q=YVR-Canada+Line

Sunday, August 16, 2026

New South Wales H set trains

 https://en.wikipedia.org/wiki/New_South_Wales_H_set 

Train length81.55 m (267 ft 6+5⁄8 in)
Car length
  • 20.34 m (66 ft 8+3⁄4 in) (OD)
  • 20,435 mm (67 ft 1⁄2 in) (ON/ONL)

https://en.wikipedia.org/wiki/New_South_Wales_H_set#Design 

https://en.wikipedia.org/wiki/South_Coast_Line 

https://en.wikipedia.org/wiki/Sydney_Trains 



Example of selective door operation. The doors in the first 2 carriages are not opened, because the platform is too short for an 8-carriage OSCAR train. https://en.wikipedia.org/wiki/Selective_door_operation (SDO)

https://upload.wikimedia.org/wikipedia/commons/thumb/9/95/Selective_Door_Operation.jpg/960px-Selective_Door_Operation.jpg 
This platform can accommodate 6 out of an 8 car heavy-rail train. 

This means that an extra car or 2 can be added to a shorter train, even if the station isn't long enough. 

Thus, before lengthening the stations on the first 2 Skytrain lines, a 5 car train could become a 7 car train. Perhaps even a 9 car train, like with the Montreal Metro trains. Eventually, the stations on the first 2 Skytrain lines could be lengthened for 7 car trains and whenever possible, 9 car trains.

Unfortunately, the 50 m level station clearance for the YVR-Canada Line trains wasn't designed for 5 car, 100 m trains, just a 2.5 car joke of a train. However, with some platform modifications and some very slight station lengthening, three 20 m cars might be possible, instead of a 2.5 car joke of a train.  

Then, once a 3 car, 60 m train is adapted to a 50-55 m platform, SDO can enable an extra car at each end to become a 5 car train. Perhaps ultimately, there could even be an extra 2 cars at each end of the middle 3 car train, to become a 7 car train.


Saturday, July 25, 2026

Friday, June 26, 2026

CN Tower celebrates 50 years of being a skyline icon

https://www.youtube.com/watch?v=ujWLEBhbdt8 

If it were possible today, the KEEP VANCOUVER SMALL AND BACKWARDS people would still not permit any building to be a 3rd of the height of the CN_Tower. (CNT) https://en.wikipedia.org/wiki/CN_Tower#Height_comparisons

The Harbour_Centre opened just over a year after the CNT, and is just under a 3rd of its height. https://en.wikipedia.org/wiki/Harbour_Centre#Height

https://www.cntower.ca/

Unfortunately, The Vancouver Mind Virus (VMV) was able to ensure that the Canada_Line Stations aren't even quite a 3rd of the length of the 152.5 m Montreal Metro stations. 


Even the North-Shore mountains aren't allowed to be as tall as the mountains north of L.A. 

https://en.wikipedia.org/wiki/North_Shore_(Greater_Vancouver) 


https://upload.wikimedia.org/wikipedia/commons/c/c0/LA_San_Gabriel_Mountains.jpg

https://en.wikipedia.org/wiki/San_Gabriel_Mountains#Gallery 


Whether you are from Toronto or Chicago, LA or SF, Melbourne or Sydney, you might be shocked as to seeing how scaled down or watered down Vancouver is. Yet, the City of Paris, despite having a slightly smaller land area than Vancouver, can fit so much more inside. Boston and SF are only slightly larger in area than the City of Vancouver, yet they can also fit in so much more. 

Sunday, June 21, 2026

How the Seattle to Vancouver area could become a megaregion

 https://www.youtube.com/watch?v=POcg0oFvVf8 

The larger Portland, Seattle and the Vancouver, BC (V-BC) region has a lot of growth potential. However, Seattle size buildings haven't been allowed in Portland and in Vancouver, BC. Nothing like a 12 lane Ship Canal Bridge has been allowed in Portland and Vancouver. While Oregon and backwater BC haven't been able to thwart the largest city in Washington State, Seattle might eventually become more of a magnet in pulling more people into the area between Portland and V-BC. 

Right now, Vancouver, WA (V-WA) still has a wider bridge than V-BC. Most of the V-BC bridges are so damn narrow that its not possible to have an efficient regional express bus network. As long as there is a refusal to build proper BRT bridges as part of a regional system, it remains a sad joke. 

The Skytrain (LRT) was built with shorter stations than what the underground stations in Seattle and Edmonton are at. Whenever possible, the Skytrain stations are shorter than the C Train stations in Calgary, DART stations in Dallas and even the Max in Portland. 

The biggest mistake of the Skytrain was to not build all of the stations with a future level clearance to eventually have Montreal Metro size stations of 500 feet or 152.5 m. Instead, the first 2 lines only have 80 m stations and the line to YVR (The Canada embarrassment Line) is only 50 m. Backwater BC logic is that a 5 car Skytrain could run twice as frequent as a 9 car Montreal Metro train. Someday, a 2.5 car YVR-Canada Line train could also run much more frequently than a 9 car Montreal Metro train. 

There is just one key problem with that type of BC logic. While initially constructing short stations and having short trains can save money, its not proper BIG city size infrastructure. In the long run, it costs more to try to lengthen stations for longer BIG city type trains. 

Wednesday, June 17, 2026

Can the SkyTrain in BC, Canada ever become a very high capacity system?

 Why BC, Canada Got it Right With its New SkyTrain https://www.youtube.com/watch?v=dqo_KAEF81k 

The argument is that a mostly elevated train can move more people than an 8-10 lane elevated freeway, at much less the cost. However, any major urban grade-separated LRT system should be designed to eventually become a very high capacity conduit.

The first 2 lines only have 80 m stations, which are just a little more than half the length of a 152.5 m Montreal Metro station. Unfortunately, the line to Richmond only has a designed level clearance for 50 m stations, not even quite a 3rd of the length of a Montreal Metro station platform. 

While it might seem economical to opt for short trains and stations, the Skytrain stations should have still been designed to eventually become more like a proper big city train station allowing for much higher capacity. 

The first 2 lines can run the newest 5 car trains, but the 3rd line can only run 2.5 car trains, some day.

Monday, June 8, 2026

The Unusual transportation approaches used in Vancouver

 https://www.vancouverisawesome.com/history/5-of-a-kind-unusual-modes-of-transportation-used-or-nearly-used-in-vancouver-12388220 

Vancouver is such an unusual and backwards city with its inefficient and congestive approach towards transportation infrastructure.

Getting rid of the streetcars and interurban trams was utterly foolish! Fortunately, such MADNE$$ wasn't adopted in Melbourne, SF, Toronto, Boston, Philadelphia and New Orleans. 

Just because a no freeways mandate was chosen for Vancouver, the streets should have been kept wide enough for busses as well as other vehicles. 

https://movementyvr.ca/the-case-of-vancouvers-nine-missing-bus-lanes

Despite most of the Vancouver bridges being too narrow, some bridge lanes were removed, because the city wasn't interested in building parallel bike bridges. 

Since most of the bridges are so narrow, there isn't enough room for proper express bus lanes. Of course the city isn't interested in building parallel bus bridges next to the narrow bridges. 

Since Vancouver is supposed to be a major, properly functioning city in Western Canada, the city should have pressed the designers of the first 2 Skytrain lines to make sure that all of the 80 m stations could gradually be extended to 152.5 m, the same as the 500 foot long Montreal Metro stations and trains.

Unlike the first 2 Skytrain lines, the Canada Line was only designed to ultimately have 50 m stations and trains. A 2 billion dollar line to YVR could have been designed in such a way that would have allowed it to look and function like a proper big-city passenger train. 

A commuter train to the North Shore keeps taking a long time to be finalized.

https://northshoreconnects.ca/wp-content/uploads/2021/10/BIRT-Benefits-Assessment_Final.pdf

Think small and build backwards, or not at all. 

Sunday, May 31, 2026

Vancouver 450 ft and Fahrenheit 451

Was a 450 foot height restriction just by chance, or was it intentionally made to be very close to 451 Fahrenheit? Despite being around the same size as Paris, Boston & SF, Vancouver remains as a very restrictive city. 

Any tall building in SL City is under 450 feet. Honolulu is still stuck around the 450 foot maximum, while San Diego is stuck at 500 feet. Even Rio DeGennaro still has shorter buildings than Vancouver, BC. Washington, DC has strict height limitations like Paris. However, W,DC could eventually set up their own equivalent of La_Defense. Its a fine example of allowing tall buildings just beyond the city limits.

https://en.wikipedia.org/wiki/Fahrenheit_451 (1953) By the 1950s, so many things were already banned, watered down or scaled back in provincial backwater Vancouver. Generations later, there was the No Fun City mind virus that further tried to cancel out things in such a small city with so much red tape and other ridiculous obstacles.

https://en.wikipedia.org/wiki/Fahrenheit_451_(1966_film) By the mid and late1960s, the city made sure that its first office tower to have more than 29 floors wouldn't be until the 1970s. Its highly doubtful that Vancouver will have an office tower at, or over 40 stories by 2030. However, Burnaby and Surrey could, because they aren't under the extreme restrictions of the Vancouver Mind Virus (VMV). 

It wasn't until 1973 when Vancouver allowed its first building to be taller than the Los_Angeles_City_Hall. https://en.wikipedia.org/wiki/Los_Angeles_City_Hall 

The Scotia_Tower (stump) is a good reference point to visualize the small scale of backwater Vancouver, as its about the same height as the Los_Angeles_City_Hall at 453'. 

https://www.skyscrapercenter.com/building/scotia-tower/4396 453'

https://skyscraperpage.com/b65/vancouver/the-scotia-tower 452' 

https://en.wikipedia.org/wiki/One_Wall_Centre It opened in 2001 at 157.8 m (518 ft). Its 49 feet shorter than the Philadelphia_City_Hall.

https://en.wikipedia.org/wiki/Philadelphia_City_Hall Opened in 1901 at 548 ft (167 m).

https://en.wikipedia.org/wiki/Fahrenheit_451_(2018_film) By 2018 it was quite apparent that Vancouver was in the process of allowing for more buildings over 450 feet. However, nothing has been permitted to reach 700 feet, so far. A tower over 1000 feet would help to water down its provincial mindset. 

https://upload.wikimedia.org/wikipedia/commons/thumb/1/14/Vancouver_panorama_%2849988799796%29_%28cropped%29.jpg/3840px-Vancouver_panorama_%2849988799796%29_%28cropped%29.jpg

SF, Sydney & Auckland are just as scenic as Vancouver & warmer throughout the year. They all have taller building than what Vancouver currently permits. Seattle is just as scenic as Vancouver, but its allowed to function like a proper big city, because it doesn't have the imposed restrictions like Vancouver has. While its cold, damp & depressing like Vancouver during the fall & winter, Seattle usually gets noticeably hotter summers than Vancouver, BC. The tallest building in Seattle is the 76 story B of A office tower. 

https://upload.wikimedia.org/wikipedia/commons/thumb/5/57/LA_Skyline_Mountains2.jpg/1280px-LA_Skyline_Mountains2.jpg While the L.A. City Hall looks like a stump there, in Vancouver it would still be one of the prominent buildings.

Everything is so small or scaled back in Vancouver. Even the Greater Vancouver mountains aren't allowed to be as tall as the ones in L.A. While the San_Francisco_Bay & Port_Phillip Bay by Melbourne are big next to their cities, English_Bay in_Vancouver is so much smaller. Its even smaller than Elliott_Bay by Seattle. 

Vancouver really needs to have bus and HOV bridges built next to its mostly narrow & congested bridges. Only a 5 car Skytrain is the max on the first 2 lines and ultimately, just a 2.5 car joke of a train on the YVR-Canada Line. 

Selective+Door+Operation can allow a short train to have an extra car at each end, despite a shorter platform. 

https://upload.wikimedia.org/wikipedia/commons/thumb/5/5e/Vancouver_sunset_%28J%29.jpg/3840px-Vancouver_sunset_%28J%29.jpg 
https://upload.wikimedia.org/wikipedia/commons/thumb/6/69/Los_Angeles_with_Mount_Baldy.jpg/3840px-Los_Angeles_with_Mount_Baldy.jpg

Australia like the USA, has some big & tall cities on the Pacific Rim. However, Vancouver symbolically kept watering down its size, because that's how you demonstrate a reluctance towards proper urban planning & growth. 

Oddly enough, the imposed small scale Vancouver mentality & agenda wasn't adopted by most cities around the world. Officially, there is no Vancouver Mind Virus (VMV), but somehow something like it keeps manifesting, just like the BCMV. 

Despite its size, Canada has less than 1% of the worlds population. Its been difficult enough just for Canada to even have half of 1% of the worlds population. 

One expects Melbourne and Sydney to be proper big cities. However, Australia has big stuff at both ends of the country. 

https://en.wikipedia.org/wiki/Sir_Leo_Hielscher_Bridges#Design Its a 12 lane crossing in Brisbane. 

https://en.wikipedia.org/wiki/Narrows_Bridge_(Perth) 10 lanes with 2 commuter train tracks in the middle.

https://en.wikipedia.org/wiki/Brisbane_Skytower It has 90 floors. https://en.wikipedia.org/wiki/Q1_(building) Almost has 80 floors.

Perth Central_Park_(skyscraper) at 51 floors and 108_St_Georges_Terrace at 50. Very restrictive Vancouver still won't permit any office tower to have a 40th floor. Calgary and Seattle each have a few over 50 stories.


So far, provincial Halifax hasn't been allowed to be on a similar scale as Boston and Montreal. 

https://en.wikipedia.org/wiki/Angus_L._Macdonald_Bridge 3 lanes.

https://en.wikipedia.org/wiki/A._Murray_MacKay_Bridge 4 lanes. 


The scale of Vancouver is kept below that of Calgary & Seattle or even Auckland, in some ways.

https://en.wikipedia.org/wiki/Lions_Gate_Bridge A classic 3 lane BC bottleneck-chokepoint. No parallel bus and truck tunnels and especially, no LRT tunnel. 

Provincial backwater Victoria isn't allowed to be on a similar scale of Wellington, NZ.

https://en.wikipedia.org/wiki/Johnson_Street_Bridge Another BC 3 lane wonder.

Sunday, May 24, 2026

Toronto - Canada’s World-Class City

 https://www.youtube.com/watch?v=FHVS8_Bi7mc 

Toronto is approaching a Chicago level of scale. However, Toronto has yet to have its first 100 story office tower. The BMO tower has 72 floors. Provincial Vancouver still won't permit any 40 story office towers. While the GTA is easily at 7 million, the Chicagoland Area is at least up to 10 million. 

The GTA and Greater Montreal, combined with Chicagoland still doesn't quite match the Greater NYC Area, AKA: The Tristate Metropolitan Area of over 23 million people.