The LGB has to be the worst or at least one of the worst traffic bottlenecks & chokepoints on the planet. Over the course of the past several decades, there should have been a bus and HOV tunnel and then a train tunnel close to the alignment of the LGB. 

Seven lanes of Georgia+Street funneled into a 3 lane LGB is nuts! The LGB is already a nice bike bridge, with sidewalks, but it should also be a bus bridge. That would be possible if a proper big city tunnel was built. An eight-lane-tunnel would really help the LGB.

Of course in both cases, the Lion Bridge was never expanded, twinned or duplicated & the M Tunnel (H-99) wasn't replace with a 10 lane bridge. Unfortunatly, no serious consideration for rail rapid transit was considered for both crossings. It was as if the regional & BC governments just didn't think it was that important to have a train from the Horseshoe+Bay+ferry+terminal and the Park+Royal+Shopping+Centre to Vancouver-International-Airport. Just like not having a train from the Tsawwassen+ferry+terminal and Tsawwassen+Mills to the airport. 

Despite Richmond,_British_Columbia having YVR, its as if no one really considered that Richmond should be a major intermodal transportation hub. Proper Transportation Planning has always been lacking in backwards BC.

https://www.theprogress.com/news/province-receives-business-case-for-new-massey-crossing-1911335

https://www.highway99tunnel.ca While an 8 lane tunnel is a good start as the first phase, eventually there will have to be a train, bus & bike bridge (or tunnel) next to it.

https://www.highway99tunnel.ca/project-overview-frt Then the H-99 tunnel could be 3 lanes each way with the 4th as a HOV lane. A new parallel bridge (or tunnel) could then have 2 rapid bus lanes, as well as 2 wide sidewalks & 2 wide bike-lanes. Extra width could allow for eventually 2 tracks, 2 HOV lanes, in addition to the 2 bus lanes. That would enable the H-99 tunnel to ultimately have 4 general lanes each way in a later phase. Of course it would have been better to do things correct right from the start, but that goes against the backwards BC mentality.