https://dailyhive.com/vancouver/oakridge-41st-avenue-station-early-closure-construction-august-2026
https://www.google.com/maps/place/Oakridge-41st+Avenue
https://dailyhive.com/vancouver/canada-line-skytrain For a line of B$ to have opened in 2009 and is still only using 2 car joke trains is a pretty sad example of inept transportation infrastructure planning.
Even using the argument that it was necessary to have a watered down or scaled back the YVR-Canada+Line to save money, this line of B$ still could have been designed to eventually become a proper big city like train. As long as the 50 m stations were designed with a future level clearance of 130 m to 153 m, the underground stations could have been as long as the Montreal Metro stations, or at least as long as the underground Edmonton LRT stations.