Wednesday, August 5, 2026

Some massive transportation projects in Metro Vancouver

 https://www.youtube.com/watch?v=emSr9NLwfT4 

Unfortunately, the Broadway+Subway will only open with the potential of 5 car trains, not 10. 

Unfortunately, the YVR-Canada+Line wasn't even designed to have 5 car trains, only a potential of 2.5 car trains, someday. 

Of course the Massey+Tunnel+replacement wasn't designed to have an LRT and BRT section. Thus, in addition to the basic 3 lanes each way, there will be an express bus lane that might also be for other HOVs.

A separate BRT section would be beneficial since BC doesn't want to run 24hr trains. Thus, when the LRT is shutdown for maintenance, a 24hr BRT line could still be running. Unfortunately, part of the BC Mind Virus is backwards thinking and inept infrastructure planning. Of course there is still no official plan to have LRT from YVR to the Tsawwassen Ferry terminal anytime soon.