Sunday, August 30, 2026

Vancouver SkyTrain-Canada Line - Richmond–Brighouse to Waterfront

 https://www.youtube.com/watch?v=PdJ9tXAF5s0 

Its very sad that a line which opened in 2009 with only 2 car trains, is still only using 2 car trains in 2026. The logic was to save money on construction, so instead of designing the stations to accommodate at least 5 car trains, there is only enough level clearance for 2.5 car trains, someday. The stations could have been designed with enough level clearance to eventually become doubleted in length. Unfortunately, its like a BC Mind Virus (BCMV) got in the way. The BCMV keeps thwarting so much infrastructure in Canada's most western province. 

For at least the past decade, there should have already been three, 20 m cars forming a 60 m train. Despite the absurd stations having a level clarence of only 50 m, Selective_door_operation could enable 3 car trains, not just some 2.5 car joke of a train. Even if the platforms can't ever be lengthened by 5-10 m, a 3 car train could still mostly have access to a 50 m station. Then with SDO, an extra car at both ends of the middle 3 cars would become a 5 car train.

https://en.wikipedia.org/wiki/Selective_door_operation#International_variations 

It just would have been so much better if the stations were at least 60 m from the start. 80 m would have been better, but 100 m stations would almost look like a big city train. Unfortunately, the VMC & BCMV mindset keeps reducing the urban scale of things. 

Some other examples are the LGB and the Iron Bridge. The OSB and the KSB...