Showing posts sorted by relevance for query Skybridge. Sort by date Show all posts
Showing posts sorted by relevance for query Skybridge. Sort by date Show all posts

Wednesday, January 15, 2025

Skybridge and The North Arm (Train) Bridge

Officially, there isn't suppose to be a backwards BC agenda. However, the Skybridge between NW & Surrey and the North_Arm_Bridge between Vancouver & Richmond, were designed too narrow. Unfortunatly, both of these SkyTrain+bridges weren't designed to have 2 bus lanes, or even HOV lanes. Key people knew that the SkyTrain wasn't going to be running 24hrs a day. Thus, there would have to be late-night busses when the trains shut down for the night. The 4 lane Pattullo+Bridge and the 4 lane Oak+Street+Bridge don't have enough space for 2 bus lanes, not even 1, let alone any HOV lanes. Therefore, if there is any traffic disruption on such narrow bridges, a bus will be blocked.

Both the Skybridge and The North Arm (Train) Bridge should have at least had a provision for 2 bike lanes & 2 sidewalks. But BC continually lacks having a proper transportation infrastructure vision. 

It's amazing that there wasn't enough interested people to make sure that the Skybridge between NW & Surrey would have at least 1 bike lane & 1 sidewalk. It has neither, because the public was expected to just take their bikes on a single sidewalk that is narrower than some people's bathtubs on the old, inept Pattullo Bridge.

https://www.alltrails.com/trail/canada/british-columbia/north-arm-bridge-bikeway There should have been a sidewalk & a bikepath on both sides of this bridge. Plus, 2 bus lanes & 2 HOV lanes, since the SkyTrain doesn't run 24 hours a day.

https://www.canadianconsultingengineer.com/features/north-arm-bridge There just doesn't seem to be a proper level of input from the public to make sure that both rapid transit bridges & others, are designed for future capacity.


https://jfdatalinks.blogspot.com/search?q=Skybridge

https://jfdatalinks.blogspot.com/search?q=The+North+Arm+Bridge

https://jfdatalinks.blogspot.com/search?q=SkyTrain+bridges

https://jfdatalinks.blogspot.com/search?q=Bike+Lanes

Sunday, May 26, 2024

The Pattullo Bridge replacement now delayed by 1 year

 https://dailyhive.com/vancouver/pattullo-bridge-construction-opening-delay-2025

https://www.cbc.ca/news/canada/british-columbia/pattullo-bridge-delays-1.7215198

https://www.pattullobridgereplacement.ca/construction/current-works/

The new PB should open with 6 lanes with a provision to have at least 8 lanes. A 4th lane each way could be a nice bus & HOV corridor. But once again, everything will be funneled into a 4 lane BC bottleneck.

https://www.surreynowleader.com/local-news/pattullo-bridge-replacement-delayed-again-now-projected-to-open-in-2025-7364978

https://globalnews.ca/news/10523439/broadway-subway-pattullo-bridge-delay/

Since the Skytrain isn't open 24hrs, 2 bus lanes should have been part of the bridge right from the start. Its sad that the multigenerational BC mentality never allowed for a much wider SkyBridge. Fortunately, Oregon was able to build their fantastic Tilikum_Crossing, because it doesn't have anything like the BC mentality to thwart it. 

Of course the Skybridge was never designed to have bus & bike lanes, but that's something Portland would eventually do. The extremely narrow SkyBridge should have been designed to not only have 2 bike lanes, but 2 bus & 2 HOV lanes to take some of the pressure off the old PB, as well as its replacement. But that would conflict with the narrow minded, multigenerational backward BC mentality.

After all these decades, backward BC still wants to make sure that there is no provision for a streetcar or a tram-train between Surrey & NW. That's despite Surrey eventually becoming the largest city in BC. 

https://en.wikipedia.org/wiki/Skybridge_(TransLink) The narrow minded BC joke of a transit bridge.

https://en.wikipedia.org/wiki/Tilikum_Crossing Perhaps, the most amazing bridge in Oregon. https://trimet.org/tilikum


https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge+replacement

https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge

https://jfdatalinks.blogspot.com/search?q=NW

Tuesday, February 18, 2025

Overnight closures for highway 17 in BC

 https://dailyhive.com/vancouver/overnight-closures-highway-17-pattullo-bridge-replacement-project

It's unfortunate that the Pattullo-Bridge-Replacement wasn't designed to have 2 levels. Just like the SkyBridge didn't. The new bridge won't be opening with any bus & HOV lanes. Opening a 4 lane bridge in the 2020s with the same number of lanes as the one from the 1930s is a sad joke, an insult & an indication of the reluctance to plan & build for the future. 

While NW & Surrey aren't officially against bus & HOV lanes, this was another case of 2 cities & the province not properly communicating & planning to gradually build a proper regional express bus & HOV network. 

The Skybridge opened in 1990 without any future capacity for 2 express bus lanes & 2 HOV lanes. The inept Pattullo_Bridge just has 4 narrow lanes. Yet, somehow the SkyBridge didn't open with at least 3 tracks & 2 sidewalks & 2 bike lanes on an upper deck & 2 express bus lanes & 2 HOV lanes on a lower deck. Instead, it's just a single level bridge with only 2 SkyTrain tracks. 

Wednesday, November 26, 2025

Pattullo to partially close for three nights as 4 lane replacement bridge opening draws near

 https://dailyhive.com/vancouver/pattullo-bridge-closures-replacement-opening 

No matter how much NW wants to be one of the smallest cities in backwards BC, it can't stop Surrey from eventually being the biggest city in what should be bustling BC. The SkyBridge was deliberately designed to not have any HOV or truck lanes. The narrow SkyBridge wasn't even designed to eventually become a bus and bike bridge. Just a train bridge without even any sidewalks. It really should have been given an award for one of the worlds best examples of inept urban infrastructure. 

It's like the SkyBridge (1990) was designed to be the first part of the new inadequate crossings between NW and Surry.

Indeed, just like its 1937 predecessor, the Pattullo_Bridge_replacement will open with only for lanes, but at least it will have 2 bike lanes and 2 sidewalks. The Pattullo_Bridge_replacement should have opened with 6 lanes and 2 wide shoulders or emergency lanes, but that would go against funneling everything into just 2 lanes each way. No emergency lanes or wide shoulders helps to reduce emergency vehicle inefficiency. No bus & HOV lanes helps to increase transportation congestion. Despite being a seaport region, there aren't any truck lanes. Perhaps the best feature of all is than the bridge wasn't designed to eventually have a lower deck for trains and trucks. 

Multibillion dollar bridges can be designed with future widening capabilities, or at least having a provision for a lower deck. Unfortunatly, it's very difficult for BC to design prober big city size transportation infrastructure. 

Thursday, February 13, 2025

New West small businesses are suffering during the Pattullo Bridge replacement project

 https://www.newwestrecord.ca/opinion/letter-new-west-small-business-is-suffering-during-the-pattullo-bridge-replacement-project-10224820

If only the 1937 Pattullo-Bridge was built a little higher & with a provision for a lower deck, It easily could have become a 6 lane bridge. Or, there was a provision to widen the narrow bridge at least a few meters on both sides, but that would indicate thinking & planning for the future. 

Some people have houses that are wider than the incredibly narrow Pattullo-Bridge. The PB should have been twinned in the 1950s, especially by the 1960s. Thus, a new bridge could have provided 3 lanes 1 way, while a refurbished old PB could have 3 lanes in the opposite direction, with not just 1, but 2 wide sidewalks on both bridges. 

Then when the Skybridge was finally built, it should have had at least 3 tracks & 2 bike lanes & a lower deck for 2 express bus lanes, which emergency vehicles could also use & 2 truck lanes, given that this is supposed to be a major seaport region.

https://upload.wikimedia.org/wikipedia/commons/b/b6/Skybridge%2C_British_Columbia.jpg A 2 car joke of a train, on a single deck narrow bridge, just like the 2 car Canada Line. 
https://upload.wikimedia.org/wikipedia/commons/e/e6/SkyBridge_sunset.jpg This is a 6 car mark 1 train. There would have to be a 12 car train of Mark 1 cars, just to reach the length of a 9 car Montreal Metro train. The newest Skytrain coaches will only form 5 car trains, because unlike Montreal, the first 2 lines only have 80m stations. The almost inept Canada Line has an absurd 50m stations, when the Montreal Metro stations are over 3 times the length, at 152.5 meters, or 500 feet. 

Unfortunatly, backwards BC continually demonstrates what not to do. Why go the correct way, when you can go the inept BC way?



Thursday, July 25, 2024

A North Shore Skytrain on a new Ironworkers Memorial Bridge?

 https://dailyhive.com/vancouver/bc-united-north-shore-skytrain-ironworkers-memorial-bridge

Either a rapid-bus crossing first, or a train crossing with 2 buss lanes for whenever the train is shut down. The NW Skybridge wasn't designed to have 2 bus & 2 bike lanes & 2 footpaths. Thus, the SkyBridge to Surrey remains as a fine inept example of backward BC planning. 

The North-Arm-Bridge to Richmond was also not designed to have 2 bus lanes, 2 bike lanes & 2 footpaths. Just one combined bike & footpath. https://en.wikipedia.org/wiki/North_Arm_Bridge

Unfortunately, Greater Vancouver doesn't want to provide 24hr trains. Yet, there seems to be a reluctance to have a series of regional bus-bridges, because most of the existing bridges are too narrow to have 2 extra bus lanes.

https://canada.constructconnect.com/joc/news/infrastructure/2023/07/province-planning-study-on-future-of-ironworkers-bridge

https://vancouvertraces.weebly.com/the-first-and-second-narrows-crossings.html


https://jfdatalinks.blogspot.com/search?q=Ironworkers+Memorial+Bridge

https://jfdatalinks.blogspot.com/search?q=North+Shore+of+Greater+Vancouver

Sunday, July 21, 2024

Metro Vancouver expected to grow by 50,000 people a year

 https://vancouversun.com/news/local-news/metro-vancouver-expected-grow-50,000-people-year

Of course all the real big cities around the world are able to properly plan & build up an appropriate level of infrastructure, were as Greater Vancouver keeps taking a scaled back approach. Especially within the small city limits of  Vancouver.

Little backwater NW should have been properly planned as a gateway between Surrey, Burnaby & Coquitlam, decades ago. However, there has been a multi-generational resistance mentality & its quite apparent in the stunted infrastructure.

https://globalnews.ca/news/9489375/pattullo-replacement-six-lanes-debate Open the new P Bridge with only 4 lanes & no emergency lanes, because 2 extra bus & HOV lanes would be what a proper big city would do. Make sure that there is no provision for a LRT deck, because NW & Surrey only needs one rail transit line. A provision for a 2nd deck would ensure future truck capacity, but that would mean to properly plan for growth. This multi-generational congestive planning approach in BC is so absurd. 

https://dailyhive.com/vancouver/pattullo-bridge-replacement-crossing-capacity-small

https://en.wikipedia.org/wiki/Skybridge_(TransLink) When the SkyBridge between NW & Surrey opened in 1990, there was no provision to have 2 bus & HOV lanes. Of course there were no bike lanes & footpaths on the bridge. Apparently, it was better to just squeeze all bike & foot traffic onto the very narrow Pattullo_Bridge, which only has 1 sidewalk no wider than a bathtub.

https://evelazarus.com/aborted-plans-a-third-crossing-for-the-north-shore While V-BC celebrated the cancelation of a series of freeway plans through the small city between the 1950s & into the early 70s, there was never a proper follow-up to a North Shore rapid-transit crossing.

https://www.nsnews.com/opinion/letters-lets-get-going-on-a-third-crossing-for-north-shore-6436538 It is pathetic & embarasing that a bike, bus & train bridge wasn't built across the North+Shore inlet at least by the mid 1980s.

https://www.nsnews.com/opinion/almost-two-thirds-of-north-shore-readers-say-a-new-bridge-is-needed-6423723 It is absurd that there wont be a train, bus & bike bridge crossing the inlet by 2025 or even 2030. https://council.vancouver.ca/010313/tt2.htm

The only hope seems to be an eventual replacement or some kind of upgrade to the Iron Bridge. Transportation_in_Vancouver has always been on a smaller scale than what it should be. 

https://vancouversun.com/news/local-news/a-look-at-six-possible-routes-for-rapid-transit-across-burrard-inlet

https://globalnews.ca/news/3765300/little-hope-of-third-crossing-to-north-shore-as-traffic-woes-worsen/

https://viewpointvancouver.ca/2016/08/26/first-rule-for-a-third-crossing

https://vancouversun.com/news/local-news/this-week-in-history-1967-wacky-bennett-and-tom-terrific-team-up-to-push-for-a-third-crossing Of course a new bus and train bridge should have still been built. Having a freeway system within the city limits of Vancouver would have been too damaging. People got so freaked out about it and didn't properly realize that there still should have been 2 bus lanes and 2 HOV lanes crossing the inlet. The plan should have also included 2 truck lanes and at least 2 train tracks in a bridge or tunnel, no freeway required, just a link to the surface streets of Vancouver & North Vancouver.

BC doesn't even have the population of one Switzerland. Yet, many local people already say that BC is too populated. WTH? Most of the worlds population is non-white. Keeping the infrastructure short, small & narrow is a strange way to symbolically refuse to build for more people on a mostly non-white world. 


https://jfdatalinks.blogspot.com/search?q=North+Shore+of+Greater+Vancouver

https://jfdatalinks.blogspot.com/search?q=V-BC

https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge

Saturday, June 21, 2025

The Pattullo Bridge replacement project

 https://dailyhive.com/vancouver/pattullo-bridge-new-indigenous-renaming-art

While it's great to have a new name for the new bridge, there should have been a few more bridges between Surrey, NW, Coquitlam & Port Coquitlam.

https://604now.com/pattullo-bridge-new-indigenous-name

Another lost opportunity for backwards BC. This new bridge should have opened with 6 lanes, plus have at least 2 wide shoulders for future capacity. Then there could have been 2 HOV lanes, as well as 4 general lanes. There also should have been a lower deck for something similar to what the Tilikum_Crossing has. https://trimet.org/tilikum

Such a lower deck not only could have provided 2 sidewalks & 2 bike paths, but a provision for 2 streetcar or tram-train tracks and even 2 separated SkyTrain tracks. Instead, all the traffic will be crammed into just 2 lanes each way with no bus & no HOV lanes & especially no breakdown lanes. In the future, the existing 2 track Skybridge between Surrey & NW might not be adequate. People from all over the world should study the BC bottleneck planning mentality & avoid such bad planning at all costs.

It is foolish for the most urban part of BC to not have wide or double deck bridges. Unfortunatly, this new 4 lane bridge wasn't designed to have 2 bus & 2 HOV lanes & no provision for at least 2 train tracks. At least it will have more than 1 sidewalk & 1 more lane than the LGB and even a safety divider. 

Despite Surrey eventually becoming the most populous city in backwater BC, no 2 track train bridge like the Tilikum has been allowed to be built in backwards BC. https://trimet.org/tilikum/#about

https://trimet.org/tilikum/#:~:text=Bus%20lines%20FX2%2DDivision%2C%209,both%20sides%20of%20the%20river.


https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge+replacement

https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge

Monday, December 18, 2023

Washington Avenue Bridge and the Tilikum Crossing vs...

 https://en.wikipedia.org/wiki/Washington_Avenue_Bridge_(Minneapolis) 2 lanes & 2 tram-train tracks, bike & walkways.

https://en.wikipedia.org/wiki/Tilikum_Crossing 2 tram train tracks & 2 for streetcars & buses. It's just so far beyond what's allowed in BC, especially in Greater Vancouver.


Both of these bridges should have been designed to have 2 bus & 2 bike lanes each, but that actually might help to relieve some of the congestion.

https://en.wikipedia.org/wiki/Skybridge_(TransLink) In spite of the regional congestion, no bus & bike lanes became part of the design. It's a fine example of inept planning in BC.

https://en.wikipedia.org/wiki/North_Arm_Bridge No bus lanes & only 1 bike lane. 


https://jfdatalinks.blogspot.com/search?q=Portland

https://jfdatalinks.blogspot.com/search?q=Tilikum+Crossing

https://therabbitportal.blogspot.com/search?q=Portland

https://therabbitportal.blogspot.com/search?q=transit+bridges 

https://jfdatalinks.blogspot.com/search?q=Bike+Lanes

Saturday, February 15, 2025

Three dead, one injured in crash on Pattullo Bridge

 https://vancouversun.com/news/three-dead-in-crash-pattullo-bridge

https://vancouver.citynews.ca/2025/02/15/new-westminster-surrey-pattullo-bridge-fatal-crash/

https://www.castanet.net/news/BC/533640/Three-killed-one-seriously-injured-in-crash-on-Metro-Vancouver-bridge

https://www.cbc.ca/news/canada/british-columbia/pattullo-bridge-crash-closed-1.7460474

https://www.ctvnews.ca/vancouver/article/3-dead-1-hospitalized-with-life-threatening-injuries-after-major-crash-on-metro-vancouver-bridge/

https://dailyhive.com/vancouver/pattullo-bridge-fatal-crash-february-2025

https://www.pattullobridgereplacement.ca Fortunately, the replacement bridge will have a central safety divider.

https://www.pattullobridgereplacement.ca/about/projectoverview Unfortunatly, the new bridge will open with only 4 lanes & no provision for a lower deck. However, there will be 2 bike & 2 footpaths. Despite being what is supposed to be a major port region, there are no truck lanes. Since Skytrain isn't a 24hr system & the Skybridge wasn't designed to have 2 bus lanes open at least during track maintenance, the new bridge should have had 2 bus lanes. Instead, cars, trucks & busses will all be funneled into only 2 lanes each way. So just like with the first bridge, BC bottleneck planning wins out.

https://www.highway99tunnel.ca While its several decades behind schedule, an 8 lane crossing is at least on the horizon.

https://www.highway99tunnel.ca/project-overview-frt Unfortunatly, in accordance with backwards BC infrastructure planning, there is no provision for a train tunnel or a bridge to Delta & especially the Tsawwassen_ferry_terminal. That seems to fit right in with not having a train from Waterfront_station to Park_Royal_Shopping_Centre and the Horseshoe_Bay_ferry_terminal

Until the stations on the first 2 Skytrain lines are lengthened, they will be stuck with 5 car trains. Proper long-range planning should have allowed for 8-10 car trains. The joke that is the Canada Line, should have had stations that could initially handle 4-5 car trains, with a provision to eventually accommodate 8-10 car trains. The existing ridiculously short stations can only handle 2.5 car trains. WTH? 

This unofficial congestive BC planning initiative is a multigenerational ME$$! Aparenty, narrow bridges & no regional bus bridges & short trains, can adequately move people around in a region of over 3 million people. Fortunately, when greater Toronto, Montreal, Boston, Sydney, Melbourn, Seattle & especially the SFBA all surpassed having 3 million people, they weren't bound by anything like the backwater BC mentality.


https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge

Saturday, January 4, 2025

The O-Train Line 2 and 4 launch

"The lines will begin a five-day service on Jan. 6 (Monday through Friday) and will continue for a minimum of two weeks. Buses through routes B2 (formerly called Line 2 buses), 99 and 97 will run parallel seven days a week in case of any issues." https://ottawa.citynews.ca/2025/01/03/heres-what-to-know-before-o-train-line-2-and-4-launch

This makes a lot of sense & not just because Ottawa is far away from Vancouver & the backwards BC mentality. Trains & people can break down causing a disruption on the tracks. Plus, there is no urban rail or commuter rail line in Canada that's running 24hrs a day. This means that its a good idea to have an express bus route that closely follows each train line 24hrs a day.

Greater Vancouver seems to always be a sleep at the wheel, or just inept with proper urban planning. Once the public was informed that the Skytrain won't be a 24hr system. Therefore, it would be a good idea to have express busses running parallel to each line 24hrs a day. 

Unfortunatly, the backward BC planning mentality never allowed for the SkyBridge_linking_NW_and_Surrey_with_SkyTrain to have enough space for 2 bus-lanes, 2 bike-lanes & 2 footpaths. https://en.wikipedia.org/wiki/Skybridge_(TransLink) The bridge has none of that, as if to conform to a BC bottleneck agenda. 

The 4 lane Pattullo_Bridge and the 4 lane Queensborough_Bridge were never designed with wide sidewalks & 2 wide emergency lanes. For if they were, then a few decades ago both bridges could have provided 3 lanes each way & have adequate space for bike lanes. A 3rd lane each way would have been great for buses, but that might improve the congestion.

While the new Pattullo_Bridge will actually have wide sidewalks on each side, no serious consideration was given to having 2 bus-lanes, despite the Skytrain not being a 24hr system. So buses, trucks, ambulances & cars will all have to be funneled into only 2 lanes each way. Having 2 bus lanes & 2 wide emergency lanes would actually go against the BC bottleneck mentality.

Even considering budget limitations, the new Pattullo-Bridge should have been designed with a provision for a future lower deck & open with 3 lanes each way & have 2 wide emergency lanes. Apparently, having the Pattullo-Bridge-Replacement with only 2 lanes each way & no emergency lanes somehow will make it easier for emergency vehicles to cross. Of course its the opposite effect, but this is backwards BC.

SurreyDelta & all of Langley, already have as many people, if not even more people than Ottawa, but the infrastructure is so lacking in BC. Thus, a new 4 lane bridge will be an instant chokepoint between NW & SurreyDelta & Langley. A 10 lane bridge & a 10 car Skytrain is what a proper urban area of over 3 million people would plan for.  

While Vancouver has less people than Ottawa, the BC Lower_Mainland has more people than Calgary, Edmonton & Winnipeg, combined. Thus, its very strange that Vancouver & BC insist on a congestive planning approach.

The 4 lane Queensborough_Bridge in NW has enough space to accommodate a parallel 4 lane bridge. While some backwater BC types might freakout with an 8 lane crossing there, they don't realise that a 4 lane bridge is very limited. Thus, by having two 4 lane bridges, there could be a bus & a truck lane each way as well as 2 general lanes each way. Not having dedicated bus & truck lanes for what is supposed to be a major port is absurd, but its OK for backward BC. 

In backwards BC its desired to not have a rail transit component on any of the current road bridges. Indeed, most of the bridges are so narrow that there isn't enough room for either bus lanes or HOV lanes.

https://en.wikipedia.org/wiki/Queensborough_Bridge

https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge

Sunday, January 12, 2025

Frigid nights in the BC Lower Mainland, but still not usually as cold as the rest of Canada

 https://www.vancouverisawesome.com/local-news/vancouver-forecast-frigid-nights-coming-as-cold-air-mass-headed-to-lower-mainland-10065523

A few freezing nights during each winter month is still pretty mild when compared to the rest of Canada. SW BC is usually the only part of Canada that can avoid weeks of horrible 24hr freezing days that most of the country has to endure. Thus, over the years, more & more people want to move to this part of Canada.

However, it seems that some people over the course of several decades really wanted to establish antigrowth symbolism in backwards BC. Indeed, there seems to have been a multigenerational agenda to keep people out of BC, or at least slow down the influx of people. Canada it self is no where from containing even just 1% of the world's population. 

The Lions+Gate+Bridge is so narrow that there should be bus & train tunnels to relieve it. 

With so many narrow bridges in BC, its as if some multigenerational power-structure didn't want to allow space for a proper regional network of express bus lanes on wider bridges. A fine example is the new Pattullo+Bridge between NW & Surrey. A bridge so narrow that there isn't enough room for 2 express bus lanes & 2 emergency lanes, let alone 2 truck lanes. 

Instead of Vancouver building an abundance of bike-bridges, lanes were removed from the existing bridges. It was almost like NW wanted to have its own symbolic version. But instead of taking 2 lanes away like on the Burrard Bridge or the Granville Bridge, the lanes on the new Pattullo+Bridge just weren't built in the first place. Thus, cars, trucks & buses will still be funneled into only 2 lanes each way.

The very narrow NW-Surrey Skybridge wasn't designed to have 2 bus lanes & 2 bike lanes & sidewalks. The same mistakes or omissions were made with the North_Arm_Bridge, but at least there is one shared bike and foot path on the narrow North-Arm-Bridge. Perhaps some day another path could be added on the east side of the bridge.

Worst of all, most of the Skytrain lines were built with only half-length stations of 80m. The Canadian embarsement Line was designed to only have 50m stations when the Montreal Metro has 152.5m long stations. Despite a provision for the new Pattullo+Bridge to eventually provide 3 lanes each way, it wasn't designed for a future lower deck. That means no provision for another Skytrain crossing or even a future LRT component.

This is all part of a congestive planning mentality.

Tuesday, July 5, 2022

SkyTrain (Greater Vancouver) Network

 https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)#Network

The SkyTrain+bridges could have been designed to be proper multimodal crossings. Unfortunately, the BC way is to provide a half-assed attempt.

The Skybridge between NW & Surrey is one of the worlds best examples of inept urban planning. No foot & bike paths & especially, no bus lanes. Fortunately, the backward BC mentality wasn't able to reach & prevent Oregon from building the fantastic Tilikum_Crossing.

The first 2 SkyTrain bridges should have been designed to accommodate at least 3 tracks.

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)#/media/File:Vancouver_Skytrain_and_Seabus_Map.svg

The first 2 SkyTrain bridges also should have had a foot & bike path on both sides.

https://en.wikipedia.org/wiki/SkyTrain_%28Vancouver%29#/media/File:Vancouver_SkyTrain_track_diagram_v3.svg 

Unfortunately, the North_Arm_Bridge for the Canada Line was also designed to not have at least 3 tracks & 2 bus lanes. There is only one combined foot & bike path, when there should have been 2. Fortunately, the Tilikum_Crossing's_Design allowed for 2 types of rail systems, bus access, with bike & footpaths on both sides. The Tilikum_Crossing in Portland is so well designed that such similar bridges should be built in Calgary & Edmonton, or even Winnipeg, some day.

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)#Rolling_stock 

https://en.wikipedia.org/wiki/Montreal_Metro#Rolling_stock

Of course the SkyTrain always has the potential for higher capacity over the Edmonton_LRTCTrain & MAX_Light_Rail, simply because its a fully grade separated system. The biggest mistake for the SkyTrain was that it wasn't designed to ultimately have a 152.4 m station, like the Montreal_Metro has.


https://jfdatalinks.blogspot.com/search?q=SkyTrain 

https://jfdatalinks.blogspot.com/search?q=BC+SkyTrain

Saturday, November 22, 2025

Some Canada Mega-projects Under Construction

 https://www.youtube.com/watch?v=kwsOVZ-j7hg 

Oakridge_Park is on a much smaller scale than MetrotownBrentwood and Lougheed. It will especially be on a much smaller scale than Parramatta in NSW. 

Unfortunatly, the Oakridge-41st_Avenue_station was only designed to have 50m platforms, when it should have been at least 100m. Thus, the utter foolishness has meant that instead of allowing for a future level station clearance to accomodate 5 car trains, the Canada (embassament) Line was only designed to just have 2.5 car trains. While its extremely short stations might have been disguised as a cost saving measurer, there didn't seem to be any key people onboard to make sure that it could eventually become a proper big city train line. Its sad that a line which opened in 2009 is still only running 2 car trains. While the 2.5 car configuration is still a joke of a train, at least half of an extra coach-length is better than nothing. Plus, there should have been extra cars ordered by now so at least during the very busy times the trains could be operating at 1 minute headways. Unfortunatly, this goes against the Vancouver & BC congestion planning mentality.

Despite being built several years after the Sydney_Harbour_Bridge, the joke that is the Pattullo_Bridge was designed to only have 4 narrow lanes & only 1 sidewalk. Of course the replacement_bridge will only open with 2 lanes each way. It was as if someone really wanted to make sure that there won't be 2 bus lanes and no HOV lanes when the bridge opens. While the new bridge is designed to be expanded from a 4 lane joke to eventually having 6 lanes, it still won't be wide enough to accomodate 2 HOV lanes as well as 2 bus lanes. Of course the new bridge won't have any emergency lanes, just like the old bridge. However, it will have 2 bike lanes and 2 sidewalks. https://www.globalhighways.com/news/pattullo-bridge-completion-end-year Its only fitting that in backwards BC this new bridge wouldn't be designed to eventually have a lower deck to accomodate 2 bus lanes and 2 LRT tracks. 

If the planners were afraid to symbolically have a wide bridge between NW and Surrey, the old Pattullo_Bridge should have been designed to eventually have a lower deck for trams, trucks and busses. Even when the SkyBridge between NW and Surrey opened in 1990, it wasn't designed to have any bus lanes or emergency vehicle lanes and especially, no bike and footpaths. 

Is Vancouver the best city in North America? (2019) https://www.youtube.com/watch?v=P8dmVUrNt38

 One of the biggest mistakes in Vancouver & SW BC is to have short trains combined with mostly narrow bridges. Thus, the region doesn't get to have long, high capacity trains and there isn't a proper regional network of bus-bridges. The refusal to twin most of the bridges means that it's almost impossible to have a proper and efficient regional network of rapid-bus and HOV lanes.  

While Montreal built the REM to augment their long-train Metro system, Vancouver should have allowed for enough clearance to eventually have 500 foot long trains. 80m-50m Skytrain stations are going to become inadequate, when there should have been a 152.4m provision so that the trains could eventually become as long as the ones on the Montreal Metro. 

Is Regional Rail in the Future of British Columbia? https://www.youtube.com/watch?v=1PeIOVy6fFc

Sunday, October 26, 2025

All cables and final steel girders now installed for new Pattullo Bridge

 https://dailyhive.com/vancouver/pattullo-bridge-construction-milestone-cables-deck Unlike the old, inadequate bridge, which only has 4 narrow lanes and just 1 sidewalk, this will have 2 sidewalks and 2 bike lanes. Unfortunatly, there won't be any bus or HOV lanes. Thus, all the traffic will be funneled into just 2 lanes each way. Of course there won't be any emergency lanes or breakdown lanes, so this is another quintessential BC bottleneck by design. At least a provision for a lower deck would have provided some hope. While this bridge can eventually be widened to 6 lanes, there seems to be no serious consideration for there to be bus and HOV lanes. So it will end up like the overloaded 6 lane Iron Bridge.

https://en.wikipedia.org/wiki/SkyBridge_(TransLink) No bike lanes and sidewalks and it wasn't built wide enough to eventually accomodate 3-4 tracks and 2 bus lanes. There is just something about backwards BC that makes it so obtuse and inept. 

https://upload.wikimedia.org/wikipedia/commons/thumb/1/1d/SkyBridge_from_SkyTrain_%285770458210%29.jpg/500px-SkyBridge_from_SkyTrain_%285770458210%29.jpg At the very least, this bridge should have had 3 tracks and 2 bus lanes, a bike lane and a sidewalk on a lower deck. There is only a middle service track and apparently, no provision for a bike lane and a sidewalk.

https://en.wikipedia.org/wiki/New_Westminster_Bridge Still, only a single track bridge for freight and passenger trains. 

https://upload.wikimedia.org/wikipedia/commons/thumb/1/1f/New_Westminster_Swing_Bridge.jpg/960px-New_Westminster_Swing_Bridge.jpg This old single track bridge should have been double tracked on a lower deck and have at least 4 lanes on an upper deck. Then when the first 4 lane Pattullo Bridge opened, it might not have been quite as overloaded in its later decades. 

In order for this joke of a river railway crossing to be properly upgraded and efficient is for there to be at least a new double track bridge.  

NW should have really had something like its own version of the Steel_Bridge in Portland. 

https://upload.wikimedia.org/wikipedia/commons/thumb/5/51/Amtrak_talgo_train_crossing_steel_bridge.jpg/960px-Amtrak_talgo_train_crossing_steel_bridge.jpg Fortunatly, Portland didn't have a provincial backwater mentality like NW. Thus, they could build a lot more bridges. 
https://upload.wikimedia.org/wikipedia/commons/thumb/8/80/SteelBridgePano1.jpg/960px-SteelBridgePano1.jpg MAX light rail on the upper deck and Amtrack and freight trains on the lower deck. Fortunately, Oregon is far enough away from ever catching the BC Mind Virus. 
https://upload.wikimedia.org/wikipedia/commons/thumb/e/e3/Aerial_view_of_Willamette_River_crossings_in_Portland%2C_February_2018.JPG So many nice bridges in Portland.
https://upload.wikimedia.org/wikipedia/commons/thumb/2/27/Fraser_River%2C_Surrey_-_panoramio_%281%29.jpg/960px-Fraser_River%2C_Surrey_-_panoramio_%281%29.jpg 
Look at the lack of bridges between NW and Surrey.
https://upload.wikimedia.org/wikipedia/commons/thumb/0/0a/New_Westminster_Aerial_view_2015.jpg/960px-New_Westminster_Aerial_view_2015.jpg For most of the history of NW, Surrey was just some farmland south of the river with not much going on, but its many times larger than little NW. 

There just didn't seem to be that much a big city vision for little provincial backwater NW. Back in the day, NW could have acquired what would become the Tri-Cities and perhaps, even Surrey. There just wasn't any desire to have a big river city in BC on the scale of Portland,_Oregon. So while NW is stuck as a tiny city, Surrey is on its way to becoming the biggest city in BC.

Unfortunately, the Iron Bridge and Granville Bridge were never designed to have a lower deck for trains and buses either. That's just how it is in backwards BC. 

Saturday, March 15, 2025

B.C. government to abolish its carbon tax after 17 years

 https://dailyhive.com/vancouver/bc-carbon-tax-abolish

The carbon tax was mostly another sad B$ joke in the history of backwards BC! Such a carbon tax should have gone towards the transportation infrastructure in the most populated parts of BC. Backwater BC has been so far behind in resolving transportation bottlenecks for several generations. Thus, an infrastructure carbon tax could have really improved things.

Instead, after 17 years, Greater Vancouver is still struggling to have a proper regional network of bus+lanes. In order the have such a proper regional BRT network, there has to be a series of bus-bridges and that hasn't happened yet. Most of the existing bridges are so narrow that there was no consideration for bus lanes, let alone HOV lanes.

The two SkyTrain bridges don't have 2 bus-lanes, despite the lines not being open 24-7. The first SkyBridge doesn't even have 2 sidewalks & 2 bike-lanes. However, the 2nd bridge has a shared bike & footpath, but there should be 2 of each. 

The first 2 SkyTrain lines have stations that are barely half the length of a Montreal Metro station. The Canada embarrassment Line only has 50m station vs. the 152.5m Montreal Metro stations. Having half-length & one 3rd length stations is not indicative of planning for high volume rapid transit. But this is half-assed BC, so apparently its OK.

Where did all the money go? Evidently, not enough of it went towards the transportation infrastructure, because almost everything is still half-size, or worse.

Saturday, March 16, 2024

Bus Rapid Transit, Cushing Bridge, Calgary

Vancouver needs bus-bridges as much as Calgary, but of course Vancouver is slow to the party, once again. The 4 lane bottleneck, AKA the Cushing+Bridge in Calgary could have gotten the Vancouver Chokepoint Award. There aren't any HOV lanes or even emergency lanes, just 2 lanes each way. However, what transformed this BC type bottleneck in Calgary into a semi-decent crossing, was the simple addition of a bus & bike bridge. The Greater Vancouver Area should have had bus & bike bridges built next to all of the regional crossings decades ago. However, that would go against the congestive planning approach, which is so intertwined within backwards BC, but not in Alberta & Washington State.

https://calgaryherald.com/news/local-news/city-says-theyll-try-to-minimize-deerfoot-disruption-during-brt-bridge-work

The Pattullo Bridge replacement shouldn't require a bus & train bridge to be built next to it, but it might eventually. If only it could have been properly designed in the first place to not just have 2 lanes each way, but 2 bus & 2 HOV lanes as well. Plus, built high & strong enough with a provision to allow for LRT and trucks on a lower deck. 

Unfortunately, no one seriously planned to have an express bus and an LRT line between NW & Surrey, because the Skytrain isn't a 24hr system. Overnight buses can't go on the Skybridge, because no one allowed for a provision to have a couple of bus lanes on it. Thus, the Pattullo Bridge replacement wont have any bus or emergency lanes. Even if someday the Pattullo Bridge replacement is widened from 4 to 6 lanes, there still won't be any emergency lanes and probably no bus and HOV lanes.

Light_rail_in_Sydney, NSW. Once again, BC falls so far behind. BC was so quick to get rid of its streetcars before the 1960s. Where as NSW has been gradually reinstating a modern version of their old tram lines.

New Tramways_in_Paris have been gradually added, but not in backwater BC. 


Unlike NW & Surrey, Portland_has_Streetcars & the MAX train which cross the river. https://www.youtube.com/watch?v=8JvGTx4ufFo

https://www.travelportland.com/plan/portland-streetcar

MAX https://www.youtube.com/watch?v=HpfRKqy96_E

https://jfdatalinks.blogspot.com/search?q=BRT

There is just something backwards in the way that BC does things.