Showing posts sorted by relevance for query Bike Lanes. Sort by date Show all posts
Showing posts sorted by relevance for query Bike Lanes. Sort by date Show all posts

Monday, August 12, 2024

Several Vancouver narrow bridge issues

 https://dailyhive.com/vancouver/metro-vancouver-bridge-cyclist-wire-allegations

Someone might have been very angry with bike people and not with car, bus & truck people. The real problem is that so much of the older BC infrastructure just wasn't designed to be more of a multi-modal crossing. The+Lion+Bridge+and+The+Iron+Bridge have no rail rapid transit crossings to help them.

The Ironworkers-Bridge is so narrow for a highway bridge in that location & wasn't designed for substantial future capacity. When it was initially designed in the 1950s, there was no concept to have 2 bus lanes, 2 HOV lanes, 2 truck lanes & 2 emergency lanes for a port city. Plus, at least 2 general traffic lanes each way & a provision for 2 train tracks. Thus, the 6 lane bridge is so overwhelmed, because it just can't do the job of an 8-10 lane wide bridge. While the Iron Bridge has 2 improved bike+lanes, they are part of the sidewalks.  

The former 8 lane Granville+Street will have 6 lanes, while the  & Oak+Street only has 4 lanes. The inadequate Oak+Street+Bridge (OSB) should have opened with at least 8 lanes, instead of only 4. Plus, 2 wide emergency lanes & 2 wide sidewalks. There still should be a new southbound OS Bridge, but the city would be against it. A narrow 4 lane bridge just doesn't have the space & capacity for 2 express bus lanes, 2 HOV & 2 truck lanes. Apparently, it's better to just funnel everything into only 2 lanes each way.  

The OSB should be twinned or replace with something like the Samuel-De_Champlain_Bridge in Montreal. The largest city in Quebec is allowed to have a nice wide bridge & long metro trains, because Quebec isn't bound by anything like the backwards BC mentality. 

https://www.theglobeandmail.com/canada/article-montreals-new-44-billion-champlain-bridge-opens-to-traffic-for Fortunatly, the Vancouver mentality wasn't able to ever reach back to Montreal & prevent such a nice modern bridge from being built there. https://www.flatironcorp.com/project/champlain-bridge If you are from Montreal & have visited Vancouver, you will be surprise to see how much shorter an underground Vancouver train station is than what is allowed underground in Montreal, Toronto, Edmonton, Seattle, SF & LA...

https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx A bike & foot bridge should have been built next to it decades ago. Then the Granville Bridge could have 3 general lanes each way, plus a bus & HOV lane each way. Instead, if 2 bus & HOV lanes are designated, there will only be 2 general lanes each way in the downtown core.

The Burrard Bridge should have had a bike & foot bride next to it. Instead, it was reduced from a 6 lane crossing to a 4 lane bridge.

The very narrow Oak+Street+Bridge & the Knight Street Bridge, should have had bus+and+bike+bridges built next to them decades ago. 

Most bridges in Vancouver & the metropolitan region just weren't designed with that much future capacity in mind, especially for buses & HOV lanes. Thus, it's a travesty that by now, almost every crossing should have had bus & bike bridges built next to them. 

https://vancouver.ca/streets-transportation/walk-bike-and-transit.aspx Unfortunatly, provisions for bus & bike lanes just weren't the thing to do several decades ago in BC.  

A truck lane is just as important as a bus & HOV lane. That's because freight should be efficiently & easily be transported in any major urban region.

https://vancouver.ca/streets-transportation/trucks-commercial-and-oversize-vehicles.aspx

https://jfdatalinks.blogspot.com/search?q=Oak+Street+and+Granville+Street

https://jfdatalinks.blogspot.com/search?q=Iron+Bridge 

https://jfdatalinks.blogspot.com/search?q=Lion+Bridge

Saturday, April 19, 2025

The narrow bridges of Vancouver, Canada

https://montecristomagazine.com/community/forgotten-bridges-vancouver

The LGB just wasn't designed with any future capacity in mind. 

History of the Lions Gate Bridge https://www.youtube.com/watch?v=JHqi7Kijedw 

https://en.wikipedia.org/wiki/Lions_Gate_Bridge#History

https://upload.wikimedia.org/wikipedia/commons/7/7e/Lions_Gate.jpg 

The inadequate 3 lane LGB is currently the most narrow road bridge in backwards & stubborn Vancouver. It's been in that category since the removal of the 2 lane Fraser Street Bridge in the 1970s. There was a refusal to twin the absurdly narrow LGB between the 1950s & 1970s. By the 1980s there should have been a subway tunnel and an 8 lane tunnel. Then two of the lanes could have been for buses. Georgia+Street is 7 lanes wide as it gets closer to Stanley Park. Thus, the main part of a tunnel through the park could have provided 3 general lanes each way & a bus lane each way. Instead, the 7 lanes of the westernmost part of Georgia Street are funneled into a 3 lane causeway & a 3 lane bridge. The LGB would be fantastic as just a bike & foot crossing, with train, bus & road tunnels well beneath & beside it.    

The Burrard_Bridge, BB or  BSB opened with 6 lanes, but now it only has 4 lanes. There are 2 bike lanes & 2 sidewalks. Had a parallel bike-bridge been built, the BB could have still had 6 lanes. While the BB has a lower level provision for streetcars or tram-trains, Vancouver did its damndest to phase out streetcars well before the 1960s. 

The Ironworkers_Memorial_Bridge has 6 lanes, but should also have had 2 wide shoulders & 2 very wide sidewalks. Unfortunatly, there was no provision for a lower deck, as is also the case with all of the other Vancouver  bridges. https://en.wikipedia.org/wiki/Ironworkers_Memorial_Second_Narrows_Crossing

Any replacement of the inadequate Ironworkers+Memorial+Bridge should be on the scale of what Perth, Seattle and Montreal have done.

https://en.wikipedia.org/wiki/Granville_Street_Bridge#Third_bridge_(1954)

https://www.youtube.com/watch?app=desktop&v=vPSdF0jRTC4 The Granville-Bridge or GSB is the widest bridge in the city limits. It opened with 8 lanes, but is being transformed into a 6 lane bridge with 2 bike lanes & 2 sidewalks. Had there been a paralel bike & foot bride, the GSB could have still been 8 lanes wide. Then there could have been 2 exclusive bus lanes.

https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx

The Oak Street Bridge should have been 8 lanes wide, with 2 wide sidewalks.

The Knight+Street+Bridge should have been 8 lanes with 2 wide sidewalks. Instead, its a 4 lane chokepoint.

The Arthur+Laing+Bridge should have been at least 6 lanes with 2 proper bike lanes & 2 sidewalks.

If the Cambie_Street_Bridge had 2 very wide sidewalks, then its likely that it would still have 6 lanes instead of 5. https://en.wikipedia.org/wiki/Cambie_Bridge#The_present_bridge

Unfortunatly, bottleneck or chokepoint planning is part of the Vancouver & BC mentality.

Of course BC & the Metro+Vancouver Region just hasn't put enough funds and effort towards proper big-city planning & infrastructure development. 

If Perth+and+Seattle had to conform to the extremely restrictive Vancouver approach to things, those cities would be in a perpetual state of chaos. Fortunately, nothing like the BC Mind Virus has ever reached WA.


https://jfdatalinks.blogspot.com/search?q=Oak+Street+and+Granville+Street

Wednesday, December 3, 2025

Westham Island Bridge, B.C....

https://en.wikipedia.org/wiki/Westham_Island_Bridge So, it would take until the mid 2020s for this wagon road era bridge to be seriously considered for upgrading.

 https://dailyhive.com/vancouver/westham-island-bridge-new-replacement-crossing-planning-transink-delta 

https://deltasheritage.com/buildings/wib.html Whenever a new bridge is built, it should have 2 wide lanes, 2 bike lanes & 2 sidewalks. 

https://lifesincrediblejourney.com/explore-historic-westham-island/

https://seabc.ca/rehabilitation-of-westham-island-bridge-and-alexandra-bridge/ 


The Marpole_Bridge_(1889) was another wagon road era crossing that took a very long time to be upgraded. 

https://en.wikipedia.org/wiki/Marpole_Bridge_(1889)#Congestion_and_replacement 


The 1970s Arthur_Laing_Bridge (ALB) should have had at least 6 lanes, plus 2 wide shoulders. 

https://en.wikipedia.org/wiki/Arthur_Laing_Bridge#Since_opening There also should have been 2 sidewalks & 2 bike lanes. By now, there should have been a bus+and+bike+bridge built next to it.


Several decades after the removal of the (wagon road) Fraser_Street_Bridge_(1894), no replacement has ever been built. 

https://en.wikipedia.org/wiki/Fraser_Street_Bridge_(1894)#Provincial_government_headache  

At the very least, it should have been replaced with a bus+and+bike+bridge in the 1970s.

https://www.richmond-news.com/local-news/photos-and-video-was-this-the-unluckiest-bridge-between-richmond-and-vancouver-4475444 However by now, there should have been a new 4 lane bridge with 2 emergency lanes, 2 bike lanes & 2 sidewalks. 

https://evelazarus.com/the-fraser-street-swing-span-bridge


The joke that is the Knight_Street_Bridge (KSB) was deliberately designed to be another quintessential BC bottleneck-chokepoint. The bridge should have opened with 6 lanes & 2 wide shoulders or emergency lanes. Pulse, 2 wide sidewalks & 2 bike lanes. 

https://en.wikipedia.org/wiki/Knight_Street_Bridge#Maintenance,_upgrades_and_incidents Instead, the middle of the bridge is just 2 lanes each way, with 2 narrow sidewalks & no bike separate bike lanes. The KSB should have had a parallel bus+and+bike+bridge built next to it decades ago.  


https://jfdatalinks.blogspot.com/search?q=Westham+Island

Saturday, January 4, 2025

The O-Train Line 2 and 4 launch

"The lines will begin a five-day service on Jan. 6 (Monday through Friday) and will continue for a minimum of two weeks. Buses through routes B2 (formerly called Line 2 buses), 99 and 97 will run parallel seven days a week in case of any issues." https://ottawa.citynews.ca/2025/01/03/heres-what-to-know-before-o-train-line-2-and-4-launch

This makes a lot of sense & not just because Ottawa is far away from Vancouver & the backwards BC mentality. Trains & people can break down causing a disruption on the tracks. Plus, there is no urban rail or commuter rail line in Canada that's running 24hrs a day. This means that its a good idea to have an express bus route that closely follows each train line 24hrs a day.

Greater Vancouver seems to always be a sleep at the wheel, or just inept with proper urban planning. Once the public was informed that the Skytrain won't be a 24hr system. Therefore, it would be a good idea to have express busses running parallel to each line 24hrs a day. 

Unfortunatly, the backward BC planning mentality never allowed for the SkyBridge_linking_NW_and_Surrey_with_SkyTrain to have enough space for 2 bus-lanes, 2 bike-lanes & 2 footpaths. https://en.wikipedia.org/wiki/Skybridge_(TransLink) The bridge has none of that, as if to conform to a BC bottleneck agenda. 

The 4 lane Pattullo_Bridge and the 4 lane Queensborough_Bridge were never designed with wide sidewalks & 2 wide emergency lanes. For if they were, then a few decades ago both bridges could have provided 3 lanes each way & have adequate space for bike lanes. A 3rd lane each way would have been great for buses, but that might improve the congestion.

While the new Pattullo_Bridge will actually have wide sidewalks on each side, no serious consideration was given to having 2 bus-lanes, despite the Skytrain not being a 24hr system. So buses, trucks, ambulances & cars will all have to be funneled into only 2 lanes each way. Having 2 bus lanes & 2 wide emergency lanes would actually go against the BC bottleneck mentality.

Even considering budget limitations, the new Pattullo-Bridge should have been designed with a provision for a future lower deck & open with 3 lanes each way & have 2 wide emergency lanes. Apparently, having the Pattullo-Bridge-Replacement with only 2 lanes each way & no emergency lanes somehow will make it easier for emergency vehicles to cross. Of course its the opposite effect, but this is backwards BC.

SurreyDelta & all of Langley, already have as many people, if not even more people than Ottawa, but the infrastructure is so lacking in BC. Thus, a new 4 lane bridge will be an instant chokepoint between NW & SurreyDelta & Langley. A 10 lane bridge & a 10 car Skytrain is what a proper urban area of over 3 million people would plan for.  

While Vancouver has less people than Ottawa, the BC Lower_Mainland has more people than Calgary, Edmonton & Winnipeg, combined. Thus, its very strange that Vancouver & BC insist on a congestive planning approach.

The 4 lane Queensborough_Bridge in NW has enough space to accommodate a parallel 4 lane bridge. While some backwater BC types might freakout with an 8 lane crossing there, they don't realise that a 4 lane bridge is very limited. Thus, by having two 4 lane bridges, there could be a bus & a truck lane each way as well as 2 general lanes each way. Not having dedicated bus & truck lanes for what is supposed to be a major port is absurd, but its OK for backward BC. 

In backwards BC its desired to not have a rail transit component on any of the current road bridges. Indeed, most of the bridges are so narrow that there isn't enough room for either bus lanes or HOV lanes.

https://en.wikipedia.org/wiki/Queensborough_Bridge

https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge

Friday, July 25, 2025

Four lanes or 6? MLA comments reignite Pattullo Bridge debate

 https://www.surreynowleader.com/local-news/four-lanes-or-6-mla-comments-reignite-pattullo-bridge-debate-8151111

Two bike lanes & 2 sidewalks are great, but the government really tipped their hand with this. Despite the SkyTrain not running 24hrs, the new bridge won't open with any bus lanes & no HOV lanes. Despite Greater Vancouver being a port region, there won't be any dedicated truck lanes & worst of all, no emergency or breakdown lanes. 

Since there was such a push to only have 2 lanes each way, the new bridge still should have opened with 2 wide emergency lanes & 2 wide breakdown lanes. Thats 6 lanes already in place, with a provision to eventually add 2 more. However, that would go against the congestive planning agenda that is Greater Vancouver & backwards BC.

It's one thing to say or pretend to support bus & HOV lanes, but opening this new bridge without such additional lanes all fits in with the congestive planning agenda. Just like a 5 car SkyTrain squeezed into an 80 m station, is a far cry from a 9 car Montreal Metro train with 152.5 m stations. Thinking, planning & building big in BC goes against the congestive planning agenda.

Symbolism is very important in backwards BC. Thus, half-size infrastructure is one of the best ways to demonstrate an ongoing reluctance to accommodate growth & efficiency. There have been several decades, even generations where funding has only created half-size & HALF-A$$ED infrastructure. So the big question is, where did so much of the money go, when BC still needs proper size infrastructure?

This multigenerational backwards BC mind Virus is horrible!


https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge 4 narrow lanes & a narrow sidwalk.

https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge+replacement 4 wide lanes with a central divider, pulse 2 sidewalks & 2 bike lanes. 

Sunday, October 26, 2025

All cables and final steel girders now installed for new Pattullo Bridge

 https://dailyhive.com/vancouver/pattullo-bridge-construction-milestone-cables-deck Unlike the old, inadequate bridge, which only has 4 narrow lanes and just 1 sidewalk, this will have 2 sidewalks and 2 bike lanes. Unfortunatly, there won't be any bus or HOV lanes. Thus, all the traffic will be funneled into just 2 lanes each way. Of course there won't be any emergency lanes or breakdown lanes, so this is another quintessential BC bottleneck by design. At least a provision for a lower deck would have provided some hope. While this bridge can eventually be widened to 6 lanes, there seems to be no serious consideration for there to be bus and HOV lanes. So it will end up like the overloaded 6 lane Iron Bridge.

https://en.wikipedia.org/wiki/SkyBridge_(TransLink) No bike lanes and sidewalks and it wasn't built wide enough to eventually accomodate 3-4 tracks and 2 bus lanes. There is just something about backwards BC that makes it so obtuse and inept. 

https://upload.wikimedia.org/wikipedia/commons/thumb/1/1d/SkyBridge_from_SkyTrain_%285770458210%29.jpg/500px-SkyBridge_from_SkyTrain_%285770458210%29.jpg At the very least, this bridge should have had 3 tracks and 2 bus lanes, a bike lane and a sidewalk on a lower deck. There is only a middle service track and apparently, no provision for a bike lane and a sidewalk.

https://en.wikipedia.org/wiki/New_Westminster_Bridge Still, only a single track bridge for freight and passenger trains. 

https://upload.wikimedia.org/wikipedia/commons/thumb/1/1f/New_Westminster_Swing_Bridge.jpg/960px-New_Westminster_Swing_Bridge.jpg This old single track bridge should have been double tracked on a lower deck and have at least 4 lanes on an upper deck. Then when the first 4 lane Pattullo Bridge opened, it might not have been quite as overloaded in its later decades. 

In order for this joke of a river railway crossing to be properly upgraded and efficient is for there to be at least a new double track bridge.  

NW should have really had something like its own version of the Steel_Bridge in Portland. 

https://upload.wikimedia.org/wikipedia/commons/thumb/5/51/Amtrak_talgo_train_crossing_steel_bridge.jpg/960px-Amtrak_talgo_train_crossing_steel_bridge.jpg Fortunatly, Portland didn't have a provincial backwater mentality like NW. Thus, they could build a lot more bridges. 
https://upload.wikimedia.org/wikipedia/commons/thumb/8/80/SteelBridgePano1.jpg/960px-SteelBridgePano1.jpg MAX light rail on the upper deck and Amtrack and freight trains on the lower deck. Fortunately, Oregon is far enough away from ever catching the BC Mind Virus. 
https://upload.wikimedia.org/wikipedia/commons/thumb/e/e3/Aerial_view_of_Willamette_River_crossings_in_Portland%2C_February_2018.JPG So many nice bridges in Portland.
https://upload.wikimedia.org/wikipedia/commons/thumb/2/27/Fraser_River%2C_Surrey_-_panoramio_%281%29.jpg/960px-Fraser_River%2C_Surrey_-_panoramio_%281%29.jpg 
Look at the lack of bridges between NW and Surrey.
https://upload.wikimedia.org/wikipedia/commons/thumb/0/0a/New_Westminster_Aerial_view_2015.jpg/960px-New_Westminster_Aerial_view_2015.jpg For most of the history of NW, Surrey was just some farmland south of the river with not much going on, but its many times larger than little NW. 

There just didn't seem to be that much a big city vision for little provincial backwater NW. Back in the day, NW could have acquired what would become the Tri-Cities and perhaps, even Surrey. There just wasn't any desire to have a big river city in BC on the scale of Portland,_Oregon. So while NW is stuck as a tiny city, Surrey is on its way to becoming the biggest city in BC.

Unfortunately, the Iron Bridge and Granville Bridge were never designed to have a lower deck for trains and buses either. That's just how it is in backwards BC. 

Friday, November 1, 2024

Vancouver's narrow bridges over the Fraser River

 https://dailyhive.com/vancouver/vancouver-knight-street-video-concern

The Knight_Street_Bridge (KSB) was deliberately designed to not have a couple of emergency lanes. No truck lanes and especially no bus and HOV lanes. No proper bike lanes, just 2 narrow sidewalks. 

https://en.wikipedia.org/wiki/Knight_Street_Bridge#Infrastructure

Thus, the Knight_Street_Bridge is one of the best examples of BC bottleneck planning.

https://images.drivebc.ca/bchighwaycam/pub/html/www/695.html

The Knight_Street_Bridge is so narrow and inept, that a new HOV, bus and bike bridge should be built right next to it. The Knight+Street+Bridge is only 4 lanes wide in the middle, so a parallel 4 lane bridge would greatly improve things. One lane on and one lane off between the twin bridge crossing and Marine-Drive. Then the main 3 lanes each way onto the 6 lanes of Knight+Street up to Kingsway. 


The incredibly narrow Fraser_Street_Bridge (FSB) was torn down and should have been rebuilt or replaced by the 1970s, especially by the 1990s. The city and the Provincial_government didn't seem to understand that a new bridge there would be great as a HOV, bus and bike bridge. A couple of wide emergency lanes would have made it a lot easier for emergency vehicles to go between Vancouver & Richmond.


Despite Oak Street being 6 lanes wide, the BC bottleneck mentality wanted to force everything into a 4 lane Oak_Street_Bridge (OSB). Even if there was no concept to have bus lanes in the late 1950s, the OSB should have had 6 lanes, plus 2 wide emergency lanes and 2 wide sidewalks.

https://en.wikipedia.org/wiki/Oak_Street_Bridge#Infrastructure

By now, there should have been a HOV, bus & bike bridge built next to the narrow & inept Oak_Street_Bridge


The Arthur-Laing-Bridge (ALB) is only 2 lanes each way. https://en.wikipedia.org/wiki/Arthur_Laing_Bridge


The multigenerational inept Vancouver & BC planning agenda is all about creating more congestion. 

Fortunately, the 8 lane Champlain+Bridge also has 2 passenger train tracks. This was possible, because Montreal and Quebec don't have anything like the Vancouver & BC mentality to hinder them.

Why have a provision for 10 car SkyTrains, when a 2-4 car joke of a train can enable more congestion? That's the backward BC way.

It's amazing that the Montreal+Metro was designed to have 9 car trains, even back in the 1960s. Montreal and Quebec in general, just don't have anything like a backwater BC mentally to contend with. Quebec isn't just able to do more because it has more people than BC, Quebec has been able to accomplish more because it isn't BC.

https://vancouver.ca/streets-transportation/bridges-and-structures.aspx

Despite being a newer crossing, the Arthur+Laing+Bridge was only designed to have 4 lanes, just like the older Oak+Street+Bridge. Both bridges should have been built with very wide shoulders, so that they eventually could have provided 6 lanes. Plus, both bridges should have had very wide sidewalks. However, that goes against the chokepoint planning mentality.

Friday, July 11, 2025

How Bike Lanes have affected Vancouver's urban infrastructure

https://www.youtube.com/watch?v=LvkifuIjq9I The BSB was a 6 lane crossing that even had a provision for a lower deck intended for streetcars. Eventually, 2 lanes were removed & the lower deck was never completed. However, Vancouver was unable to prevent Seattle & Portland from reviving some of their streetcar routes.

The problem isn't bike lanes, it's the lack of interest to build a proper regional network of bus & bike bridges. Thus, if a proper bike bridge was built next to the Burrard+Street+Bridge, then 2 of its 6 lanes could have been for buses or at least HOV lanes. The lower deck could have still been for streetcars or tram-trains going between Vancouver & Richmond. The irony of backwards Vancouver is that it was one of the first cities to get rid of its streetcars & will likely be one of the last to bring them back.

The Fraser River Tunnel Project https://www.youtube.com/watch?v=NWhHJWKa6CQ Unfortunatly, this will still be a chokepoint or congested crossing.

Of course the new Richmond-Delta+Tunnel wasn't designed to be part of a rail link between the airport and the ferry terminal. There should have been 2 HOV lanes, as well as 2 bus lanes, but that would be a big-city 10 lane crossing. Instead, just an 8 lane tunnel with no train component. Eventually, a train and HOV bridge or tunnel will have to be built next to it. 

At least the first SkyTrain line can now have 5 car trains. However, the 2 car joke of a train still exists between Vancouver & Coquitlam, as well as between Vancouver & Richmond. The Montreal Metro can have 9 car trains and BART in SF can have 10 car trains. Such things are possible because they don't have a congestive BC panning mentality.


https://jfdatalinks.blogspot.com/search?q=Bike+Lanes

Sunday, April 20, 2025

The Oak Street-Granville Street Corridor

 https://en.wikipedia.org/wiki/Oak_Street_(Vancouver) , https://www.youtube.com/watch?v=kXbUb7TMj6k

The Oak+Street-Granville+Street+Corridor are both 6 lanes wide for most of their lengths. Thus, this is mostly a 12 lane street corridor and is much less disruptive than if a 10-12 lane freeway had been pushed through in the 1950s or 60s.

https://en.wikipedia.org/wiki/Granville_Street , https://storeys.com/vancouver-granville-street-entertainment-district-history-renewal-planning-program

The yellow line is set for 3 lanes each way. However, if it was moved over 1 or 2 lanes, then there could be 4 or 5 main lanes one way & 1 or 2 lanes the other way. 

The Oak+Street+Bridge+and+Granville+Street+Bridge are still part of an incomplete corridor.

An improved 8 lane Granville+Street+Bridge with double-width sidewalks could have still worked, if there had also been a wide bike & foot bridge built next to it. Then, a roughly new paralel bridge next to the 4 lane Oak+Street+Bridge could have allowed for an 8 lane crossing there. Four lanes of Granville_Street southbound over the Fraser River and 4 lanes of Oak_Street northbound.

Unfortunatly 2 lanes were removed from the Burrard+Street+Bridge (BSB), 2 lanes removed from the Granville+Street+Bridge (GSB) and 1 lane from the Cambie+Street+Bridge (CSB). That didn't have to happen if a bike bridge was built next to the BSB and the GSB. While the east side of the Cambie-Street-Bridge has a nice, wide sidewalk, there wasn't enough foresight to also have a wide sidewalk on its west side. However, that narrow sidewalk could still be built out to be nice & wide so that the CSB can be restored to 6 lanes. 

When a city & metropolitan region mostly has narrow bridges, removing lanes or not having enough is utterly foolish! Case in point... https://www.pattullobridgereplacement.ca Instead of 2 bus & 2 HOV lanes, everything will be initially funneled into just 2 lanes each way. https://www.pattullobridgereplacement.ca/about/projectoverview Two nice sidewalks & 2 nice bike lanes, but no emergency lanes or bus lanes, right from the start. Its another classic BC bottleneck in the making. Since the SkyTrain doesn't run on a 24hr basis, 24hr bus lanes are essential, but that would go against the congestive planning methodology that is backwards BC.


https://jfdatalinks.blogspot.com/search?q=Oak+Street+and+Granville+Street

Tuesday, May 28, 2024

Five of Ontario's top 10 worst roads are located in the Greater Toronto Area

 https://toronto.ctvnews.ca/five-of-ontario-s-top-10-worst-roads-are-located-in-the-toronto-area-1.6903196 Of course its a good idea to make sure that the roads & streets are as smooth as possible.

The Greater_Toronto_Area is gradually becoming a vast urban region like the Chicago_metropolitan_area. So many more modes of transit must be provided for the GTA. IE, trains, HOV, bus & bike lanes. 

https://www.insauga.com/one-of-ontarios-worst-roads-is-among-the-busiest-streets-in-mississauga

Being from the BC Lower_Mainland, it's hard to believe that Canada's GTA is on its way to becoming like another Chicagoland. But then I always remember that Ontario, like Quebec & Alberta aren't under anything like the BC mentality & all of its restrictions.

https://www.cbc.ca/news/canada/hamilton/worst-roads-ontario-2024-1.7215979 

In effect, the Burlington_Bay_James_N._Allan_Skyway went from a BC like 4 lane bridge to an 8 lane Ontario crossing in the mid 1980s. https://en.wikipedia.org/wiki/Burlington_Bay_James_N._Allan_Skyway#1985_twin_bridge

https://511on.ca/map/Cctv/loc06--3
https://511on.ca/map/Cctv/loc06--3 Both bridges are safer than cramming everything into one crossing structure. 

https://burlingtontraffic.ca/qew-burlington-bay-james-n-allan-skyway The 4th lane each way could eventually become a bus & HOV_lane.

The 4 lane Burlington_Canal_Lift_Bridge is more like a narrow Vancouver bridge. Just 2 lanes each way with no space for an emergency lane or bus & HOV lane. That's why the Burlington_Bay_James_N._Allan_Skyway crossing is still better than any bridge within the Vancouver city limits. The skyway crossing combined with the lift bridge, provides 12 lanes, because the emergency lanes usually aren't counted. Just imagine if all that was funneled into a 4 lane Vancouver bridge. Fortunately, the backward BC bottleneck mentality has never taken over Ontario. 

While Oak Street in Vancouver has 6 lanes, the Oak_Street_Bridge was only designed to have 4 lanes. Thus, it's a fine example of the BC mentality and the multigenerational Vancouverization agenda. Vancouverization is all about watering things down & creating bottlenecks or chokepoints.

https://upload.wikimedia.org/wikipedia/commons/5/5f/Oak_Street_Bridge.jpg
https://wikimedia.org/Oak_Street_Bridge.jpg

The narrow 4 lane bridge should have been designed with a provision to eventually be at least 8 lanes wide. 3 lanes each way, plus a bus & HOV lane each way, but that would conflict with the narrow mindedness of Vancouver. It's sad that at least a bus & bike bridge wasn't built next to it, but that would conflict with the BC bottleneck planning approach to things.

https://upload.wikimedia.org/wikipedia/commons/5/53/Oak_Street_Bridge_and_Fraser_River%2C_Vancouver_-_panoramio.jpg
https://wikimedia.org/Oak_Street_Bridge_and_Fraser_River.jpg

https://images.drivebc.ca/bchighwaycam/pub/html/www/70.html A 6 lane street funneled into a 4 lane bridge. WTH?

The Oak_Street_Bridge really should have been opened as a 10 lane bridge. Yet, Oak_Street has only 6 lanes. A 10 lane OSB could have not only allowed for 3 lanes each way, but a bus & HOV_lane each way. Then the 5th lane each way could have been an emergency lane

https://www2.gov.bc.ca/gov/content/transportation/driving-and-cycling/traveller-information/routes-and-driving-conditions/hov-lanes

At the very least, a HOV, bus & bike bridge should be built next to the OSB. However, the multi generational backward BC mentality just doesn't care.

The 4 lane joke that is the George_Massey_Tunnel, should have had a HOV, bus & bike bridge built next to it several decades ago. But that would have actually created better mobility & less congestion.

https://en.wikipedia.org/wiki/George_Massey_Tunnel#Replacement Of course just like with the old tunnel, the new tunnel won't have a provision for LRT & emergency lanes. Thus, a LRT bridge would eventually have to be built next to it. Apparently, having a train from the Tsawwassen_ferry_terminal to the airport still doesn't make sense. That's just the backward BC way.

If you are from Ontario, Quebec, Alberta, the Pacific NW, Australia or just about anywhere, the watered down BC infrastructure will surprise you.


https://jfdatalinks.blogspot.com/search?q=old+and+new+narrow+bridges 

https://jfdatalinks.blogspot.com/search?q=bus+and+bike+bridges

Friday, March 14, 2025

City of Surrey to plan for new waterfront entertainment district next to Pattullo Bridge

 https://dailyhive.com/vancouver/surrey-waterfront-entertainment-district-fraser-river-study

A lot of potential, but there shouldn't be any scaling back of the riverport facilities.

Unfortunatly, for several generations, there wasn't a keen sense to properly develop the Surrey side of the river. NW never pushed for more bridges over the past few generations. 

No 10 car trains to Surrey, but at least there is a hope of 5 car trains. No 8-10 lane bridges, because it's better to just omit bus & HOV lanes on the new version of the narrow Pattullo+Bridge. So narrow that at only 4 lanes, there isn't enough width to accomodate 2 bus lanes & 2 HOV lanes & certainly no provision for a future lower LRT deck. 

Unfortunatly, the Queensborough_Bridge in NW has only 2 lanes each way & no emergency lanes. Had there been 2 wide emergency lanes, the bridge could have become a 6 lane crossing. A new parallel bridge with wider sidewalks & 2 bike lanes, could also provide 2 general traffic lanes, a bus lane & a HOV lane & the same for the old bridge, minus any bike lanes. 

https://en.wikipedia.org/wiki/Queensborough_Bridge Apparently, it's better to just keep funneling everything into one narrow 4 lane bridge. There is no direct train from NW to the airport, so a direct bus with its own lanes to YVR would be a good idea. 

https://en.wikipedia.org/wiki/Queensboro_Bridge The NYC version has 9 lanes.


https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge

Thursday, April 3, 2025

The inadequate Arthur Laing Bridge

https://en.wikipedia.org/wiki/Arthur_Laing_Bridge Another fine example of how Vancouver doesn't allow for proper big city infrastructure planning. The ALB has no sidewalks, no proper bike lanes, & especially, no bus lanes.

https://en.wikipedia.org/wiki/Arthur_Laing_Bridge#Since_opening

https://upload.wikimedia.org/wikipedia/commons/6/61/Arther_Lang_Bridge_and_Fraser_River%2C_Vancouver_%28504734%29_%2823678427633%29.jpg The 4 lane BC bottlenek mentality is so firmy entreched. There just wasn't any proper concept to have 2 bus lanes, in addition to 4 general lanes. There is no good reason as to why the Arthur+Laing+Bridge wasn't designed to have 2 sidewalks & 2 bike lanes. 

Unless the bridge can slightly be widened on each side, safe & properly separated bike lanes will be unlikely. 

https://bikehub.ca/about-us/news/arthur-laing-bridge-bike-lane-widening


  • Arthur Laing Bridge (Richmond-Vancouver): As there are no sidewalks on the bridge, cyclists ride on the shoulders of the roadway. Northbound cyclists can get to the bridge via Russ Baker Way or an off-street pathway that can be accessed from the Airport Station bus loop or from the Airport Connector bridge.

https://www.richmond.ca/parks-recreation/parks-trails-cycling/cycling/cycling_maps.htm


https://www.yvr.ca/en/passengers/transportation/bicycles-and-cycling

https://evelazarus.com/?s=the+Arthur+Laing+Bridge

This bridge & the Knight+Street+Bridge & the Queensborough_Bridge are so narrow, that there should be bus & bike bridges built next to each of them. 


https://jfdatalinks.blogspot.com/search?q=Arthur+Laing+Bridge

Tuesday, October 14, 2025

Granville Bridge, Vancouver, etc.

 https://vancouver.ca/streets-transportation/granville-bridge.aspx 

Even after 3 tries, Vancouver still couldn't quite get the Granville_Street_Bridge correct. Of course the 3rd bridge wasn't designed to have a lower deck for streetcars or tram-trains. Even though it was generally designed to be a car, truck and bus bridge, the sidewalks should have been double width and have an inner railing. If the city couldn't wait until late March, it should have had the official dedication in early March, not in crappy February 1954.

https://en.wikipedia.org/wiki/Granville_Street_Bridge#Third_bridge_(1954) "On February 4, 1954, the current Granville Street Bridge opened to traffic after five years of planning and construction; its dedication ceremony was attended by 5,000 spectators after it had been delayed a week due to heavy snow." 

https://en.wikipedia.org/wiki/Granville_Street_Bridge#21st_century Unfortunatly, new bike lanes and extra sidewalks couldn't be installed below the 8 lane deck. Thus, Vancouver went for strike 3 and removed 2 lanes from the bridge. The Burrard+Street+Bridge lost 2 lanes and the Cambie+Bridge lost 1 lane. A bike and foot bridge could have been built on the west side of the Burrard Bridge, then no lanes would have been removed. The Cambie Bridge already had a wide sidewalk on its east side. The west sidewalk should have been widened, then no lane would have been removed. 

The Granville+Bridge could have had 6 lanes and 2 bus lanes. Now, if there are ever 2 bus lanes, there will only be 2 general lanes each way.

Several cities around the world have bike & foot bridges and don't have to remove lanes from the existing bridges.

For a congested city to have removed 5 lanes from 3 bridges, could there even be more of a reduction of lanes Well, there are some who would like to have the LGB just for bike and foot traffic.

https://globalnews.ca/news/1946543/government-says-lions-gate-bridge-will-not-close-to-cars-come-2030 

That would be OK if an 8 lane tunnel could be built near it. As its projected, the new & improved tunnel between Richmond & Delta won't be ready unto 2030. Since things move so slow in constipated, backwater BC, a First_Narrows_Tunnel might not be completed until 2040.

Friday, May 21, 2021

Deep Cove and Belcarra, BC

https://en.wikipedia.org/wiki/Deep_Cove,_North_Vancouver  

While the locals would be freaked out if a highway bridge was ever built between Deep Cove and Belcarra, a bus+and+bike+bridge should be considered. Such a typical bridge should have 2 bus lanes and 2 emergency vehicle lanes, plus 2 bike lanes and 2 sidewalks. Then, even a provision for a lower deck to accommodate an LRT line. Unfortunatly, the Greater Vancouver Region doesn't have such a proper bus and bike bridge network.  

The inadequate Iron+Bridge should have had a bus+and+bike+bridge built next to it several decades ago. The joke that is the Lions+Gate+Bridge should have become a bus+and+bike+bridge several decades ago, if an 8 lane tunnel had been built. Such a tunnel could have 3 lanes each way with the 4th being an HOV lane. Then, the very narrow bridge could just be a nice bus, bike & pedestrian crossing.

While the Pitt_River_Bridge is designed to potentially accommodate 8 lanes and 2 LRT tracks, even it should have a parallel bus and bike bridge. Then, an 8 lane Pitt_River_Bridge could have 3 general lanes each way with the 4th being an HOV lane. Then the SkyTrain could easily be extended to Pitt_Meadows and eventually, Maple_Ridge

https://en.wikipedia.org/wiki/Belcarra

https://en.wikipedia.org/wiki/Buntzen_Lake 

https://en.wikipedia.org/wiki/Indian_Arm 

https://en.wikipedia.org/wiki/Indian_Arm#Buntzen_Generating_Station , https://www.youtube.com/watch?v=lKXHGD5Xvus , https://www.atlasobscura.com/places/buntzen-lake-powerhouses , https://montecristomagazine.com/community/the-buntzen-lake-powerhouses# , https://evelazarus.com/the-buntzen-power-stations-on-indian-arm

https://en.wikipedia.org/wiki/Burrard_Inlet

https://en.wikipedia.org/wiki/Anmore 

https://en.wikipedia.org/wiki/Burrard_Generating_Station 

https://en.wikipedia.org/wiki/Port_Moody  

https://en.wikipedia.org/wiki/North_Vancouver_(district_municipality) 

Switzerland can fit into British_Columbia almost 2 dozen times. Yet, BC doesn't even have the population of one CH. 

 https://dailyhive.com/vancouver/vancouver-housing-affordability  

Backwater BC is so far behind with several things. Proper urban and transportation planning is one of them.


https://jfdatalinks.blogspot.com/search?q=bus+and+bike+bridges

Wednesday, January 15, 2025

Skybridge and The North Arm (Train) Bridge

Officially, there isn't suppose to be a backwards BC agenda. However, the Skybridge between NW & Surrey and the North_Arm_Bridge between Vancouver & Richmond, were designed too narrow. Unfortunatly, both of these SkyTrain+bridges weren't designed to have 2 bus lanes, or even HOV lanes. Key people knew that the SkyTrain wasn't going to be running 24hrs a day. Thus, there would have to be late-night busses when the trains shut down for the night. The 4 lane Pattullo+Bridge and the 4 lane Oak+Street+Bridge don't have enough space for 2 bus lanes, not even 1, let alone any HOV lanes. Therefore, if there is any traffic disruption on such narrow bridges, a bus will be blocked.

Both the Skybridge and The North Arm (Train) Bridge should have at least had a provision for 2 bike lanes & 2 sidewalks. But BC continually lacks having a proper transportation infrastructure vision. 

It's amazing that there wasn't enough interested people to make sure that the Skybridge between NW & Surrey would have at least 1 bike lane & 1 sidewalk. It has neither, because the public was expected to just take their bikes on a single sidewalk that is narrower than some people's bathtubs on the old, inept Pattullo Bridge.

https://www.alltrails.com/trail/canada/british-columbia/north-arm-bridge-bikeway There should have been a sidewalk & a bikepath on both sides of this bridge. Plus, 2 bus lanes & 2 HOV lanes, since the SkyTrain doesn't run 24 hours a day.

https://www.canadianconsultingengineer.com/features/north-arm-bridge There just doesn't seem to be a proper level of input from the public to make sure that both rapid transit bridges & others, are designed for future capacity.


https://jfdatalinks.blogspot.com/search?q=Skybridge

https://jfdatalinks.blogspot.com/search?q=The+North+Arm+Bridge

https://jfdatalinks.blogspot.com/search?q=SkyTrain+bridges

https://jfdatalinks.blogspot.com/search?q=Bike+Lanes

Monday, December 18, 2023

Washington Avenue Bridge and the Tilikum Crossing vs...

 https://en.wikipedia.org/wiki/Washington_Avenue_Bridge_(Minneapolis) 2 lanes & 2 tram-train tracks, bike & walkways.

https://en.wikipedia.org/wiki/Tilikum_Crossing 2 tram train tracks & 2 for streetcars & buses. It's just so far beyond what's allowed in BC, especially in Greater Vancouver.


Both of these bridges should have been designed to have 2 bus & 2 bike lanes each, but that actually might help to relieve some of the congestion.

https://en.wikipedia.org/wiki/Skybridge_(TransLink) In spite of the regional congestion, no bus & bike lanes became part of the design. It's a fine example of inept planning in BC.

https://en.wikipedia.org/wiki/North_Arm_Bridge No bus lanes & only 1 bike lane. 


https://jfdatalinks.blogspot.com/search?q=Portland

https://jfdatalinks.blogspot.com/search?q=Tilikum+Crossing

https://therabbitportal.blogspot.com/search?q=Portland

https://therabbitportal.blogspot.com/search?q=transit+bridges 

https://jfdatalinks.blogspot.com/search?q=Bike+Lanes

Sunday, January 12, 2025

Frigid nights in the BC Lower Mainland, but still not usually as cold as the rest of Canada

 https://www.vancouverisawesome.com/local-news/vancouver-forecast-frigid-nights-coming-as-cold-air-mass-headed-to-lower-mainland-10065523

A few freezing nights during each winter month is still pretty mild when compared to the rest of Canada. SW BC is usually the only part of Canada that can avoid weeks of horrible 24hr freezing days that most of the country has to endure. Thus, over the years, more & more people want to move to this part of Canada.

However, it seems that some people over the course of several decades really wanted to establish antigrowth symbolism in backwards BC. Indeed, there seems to have been a multigenerational agenda to keep people out of BC, or at least slow down the influx of people. Canada it self is no where from containing even just 1% of the world's population. 

The Lions+Gate+Bridge is so narrow that there should be bus & train tunnels to relieve it. 

With so many narrow bridges in BC, its as if some multigenerational power-structure didn't want to allow space for a proper regional network of express bus lanes on wider bridges. A fine example is the new Pattullo+Bridge between NW & Surrey. A bridge so narrow that there isn't enough room for 2 express bus lanes & 2 emergency lanes, let alone 2 truck lanes. 

Instead of Vancouver building an abundance of bike-bridges, lanes were removed from the existing bridges. It was almost like NW wanted to have its own symbolic version. But instead of taking 2 lanes away like on the Burrard Bridge or the Granville Bridge, the lanes on the new Pattullo+Bridge just weren't built in the first place. Thus, cars, trucks & buses will still be funneled into only 2 lanes each way.

The very narrow NW-Surrey Skybridge wasn't designed to have 2 bus lanes & 2 bike lanes & sidewalks. The same mistakes or omissions were made with the North_Arm_Bridge, but at least there is one shared bike and foot path on the narrow North-Arm-Bridge. Perhaps some day another path could be added on the east side of the bridge.

Worst of all, most of the Skytrain lines were built with only half-length stations of 80m. The Canadian embarsement Line was designed to only have 50m stations when the Montreal Metro has 152.5m long stations. Despite a provision for the new Pattullo+Bridge to eventually provide 3 lanes each way, it wasn't designed for a future lower deck. That means no provision for another Skytrain crossing or even a future LRT component.

This is all part of a congestive planning mentality.

Sunday, July 21, 2024

Metro Vancouver expected to grow by 50,000 people a year

 https://vancouversun.com/news/local-news/metro-vancouver-expected-grow-50,000-people-year

Of course all the real big cities around the world are able to properly plan & build up an appropriate level of infrastructure, were as Greater Vancouver keeps taking a scaled back approach. Especially within the small city limits of  Vancouver.

Little backwater NW should have been properly planned as a gateway between Surrey, Burnaby & Coquitlam, decades ago. However, there has been a multi-generational resistance mentality & its quite apparent in the stunted infrastructure.

https://globalnews.ca/news/9489375/pattullo-replacement-six-lanes-debate Open the new P Bridge with only 4 lanes & no emergency lanes, because 2 extra bus & HOV lanes would be what a proper big city would do. Make sure that there is no provision for a LRT deck, because NW & Surrey only needs one rail transit line. A provision for a 2nd deck would ensure future truck capacity, but that would mean to properly plan for growth. This multi-generational congestive planning approach in BC is so absurd. 

https://dailyhive.com/vancouver/pattullo-bridge-replacement-crossing-capacity-small

https://en.wikipedia.org/wiki/Skybridge_(TransLink) When the SkyBridge between NW & Surrey opened in 1990, there was no provision to have 2 bus & HOV lanes. Of course there were no bike lanes & footpaths on the bridge. Apparently, it was better to just squeeze all bike & foot traffic onto the very narrow Pattullo_Bridge, which only has 1 sidewalk no wider than a bathtub.

https://evelazarus.com/aborted-plans-a-third-crossing-for-the-north-shore While V-BC celebrated the cancelation of a series of freeway plans through the small city between the 1950s & into the early 70s, there was never a proper follow-up to a North Shore rapid-transit crossing.

https://www.nsnews.com/opinion/letters-lets-get-going-on-a-third-crossing-for-north-shore-6436538 It is pathetic & embarasing that a bike, bus & train bridge wasn't built across the North+Shore inlet at least by the mid 1980s.

https://www.nsnews.com/opinion/almost-two-thirds-of-north-shore-readers-say-a-new-bridge-is-needed-6423723 It is absurd that there wont be a train, bus & bike bridge crossing the inlet by 2025 or even 2030. https://council.vancouver.ca/010313/tt2.htm

The only hope seems to be an eventual replacement or some kind of upgrade to the Iron Bridge. Transportation_in_Vancouver has always been on a smaller scale than what it should be. 

https://vancouversun.com/news/local-news/a-look-at-six-possible-routes-for-rapid-transit-across-burrard-inlet

https://globalnews.ca/news/3765300/little-hope-of-third-crossing-to-north-shore-as-traffic-woes-worsen/

https://viewpointvancouver.ca/2016/08/26/first-rule-for-a-third-crossing

https://vancouversun.com/news/local-news/this-week-in-history-1967-wacky-bennett-and-tom-terrific-team-up-to-push-for-a-third-crossing Of course a new bus and train bridge should have still been built. Having a freeway system within the city limits of Vancouver would have been too damaging. People got so freaked out about it and didn't properly realize that there still should have been 2 bus lanes and 2 HOV lanes crossing the inlet. The plan should have also included 2 truck lanes and at least 2 train tracks in a bridge or tunnel, no freeway required, just a link to the surface streets of Vancouver & North Vancouver.

BC doesn't even have the population of one Switzerland. Yet, many local people already say that BC is too populated. WTH? Most of the worlds population is non-white. Keeping the infrastructure short, small & narrow is a strange way to symbolically refuse to build for more people on a mostly non-white world. 


https://jfdatalinks.blogspot.com/search?q=North+Shore+of+Greater+Vancouver

https://jfdatalinks.blogspot.com/search?q=V-BC

https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge

Saturday, November 22, 2025

Some Canada Mega-projects Under Construction

 https://www.youtube.com/watch?v=kwsOVZ-j7hg 

Oakridge_Park is on a much smaller scale than MetrotownBrentwood and Lougheed. It will especially be on a much smaller scale than Parramatta in NSW. 

Unfortunatly, the Oakridge-41st_Avenue_station was only designed to have 50m platforms, when it should have been at least 100m. Thus, the utter foolishness has meant that instead of allowing for a future level station clearance to accomodate 5 car trains, the Canada (embassament) Line was only designed to just have 2.5 car trains. While its extremely short stations might have been disguised as a cost saving measurer, there didn't seem to be any key people onboard to make sure that it could eventually become a proper big city train line. Its sad that a line which opened in 2009 is still only running 2 car trains. While the 2.5 car configuration is still a joke of a train, at least half of an extra coach-length is better than nothing. Plus, there should have been extra cars ordered by now so at least during the very busy times the trains could be operating at 1 minute headways. Unfortunatly, this goes against the Vancouver & BC congestion planning mentality.

Despite being built several years after the Sydney_Harbour_Bridge, the joke that is the Pattullo_Bridge was designed to only have 4 narrow lanes & only 1 sidewalk. Of course the replacement_bridge will only open with 2 lanes each way. It was as if someone really wanted to make sure that there won't be 2 bus lanes and no HOV lanes when the bridge opens. While the new bridge is designed to be expanded from a 4 lane joke to eventually having 6 lanes, it still won't be wide enough to accomodate 2 HOV lanes as well as 2 bus lanes. Of course the new bridge won't have any emergency lanes, just like the old bridge. However, it will have 2 bike lanes and 2 sidewalks. https://www.globalhighways.com/news/pattullo-bridge-completion-end-year Its only fitting that in backwards BC this new bridge wouldn't be designed to eventually have a lower deck to accomodate 2 bus lanes and 2 LRT tracks. 

If the planners were afraid to symbolically have a wide bridge between NW and Surrey, the old Pattullo_Bridge should have been designed to eventually have a lower deck for trams, trucks and busses. Even when the SkyBridge between NW and Surrey opened in 1990, it wasn't designed to have any bus lanes or emergency vehicle lanes and especially, no bike and footpaths. 

Is Vancouver the best city in North America? (2019) https://www.youtube.com/watch?v=P8dmVUrNt38

 One of the biggest mistakes in Vancouver & SW BC is to have short trains combined with mostly narrow bridges. Thus, the region doesn't get to have long, high capacity trains and there isn't a proper regional network of bus-bridges. The refusal to twin most of the bridges means that it's almost impossible to have a proper and efficient regional network of rapid-bus and HOV lanes.  

While Montreal built the REM to augment their long-train Metro system, Vancouver should have allowed for enough clearance to eventually have 500 foot long trains. 80m-50m Skytrain stations are going to become inadequate, when there should have been a 152.4m provision so that the trains could eventually become as long as the ones on the Montreal Metro. 

Is Regional Rail in the Future of British Columbia? https://www.youtube.com/watch?v=1PeIOVy6fFc