Showing posts sorted by date for query Montreal Metro. Sort by relevance Show all posts
Showing posts sorted by date for query Montreal Metro. Sort by relevance Show all posts

Friday, June 26, 2026

CN Tower celebrates 50 years of being a skyline icon

https://www.youtube.com/watch?v=ujWLEBhbdt8 

If it were possible today, the KEEP VANCOUVER SMALL AND BACKWARDS people would still not permit any building to be a 3rd of the height of the CN_Tower. (CNT) https://en.wikipedia.org/wiki/CN_Tower#Height_comparisons

The Harbour_Centre opened just over a year after the CNT, and is just under a 3rd of its height. https://en.wikipedia.org/wiki/Harbour_Centre#Height

https://www.cntower.ca/

Unfortunately, The Vancouver Mind Virus (VMV) was able to ensure that the Canada_Line Stations aren't even quite a 3rd of the length of the 152.5 m Montreal Metro stations. 


Even the North-Shore mountains aren't allowed to be as tall as the mountains north of L.A. 

https://en.wikipedia.org/wiki/North_Shore_(Greater_Vancouver) 


https://upload.wikimedia.org/wikipedia/commons/c/c0/LA_San_Gabriel_Mountains.jpg

https://en.wikipedia.org/wiki/San_Gabriel_Mountains#Gallery 


Whether you are from Toronto or Chicago, LA or SF, Melbourne or Sydney, you might be shocked as to seeing how scaled down or watered down Vancouver is. Yet, the City of Paris, despite having a slightly smaller land area than Vancouver, can fit so much more inside. Boston and SF are only slightly larger in area than the City of Vancouver, yet they can also fit in so much more. 

Sunday, June 21, 2026

How the Seattle to Vancouver area could become a megaregion

 https://www.youtube.com/watch?v=POcg0oFvVf8 

The larger Portland, Seattle and the Vancouver, BC (V-BC) region has a lot of growth potential. However, Seattle size buildings haven't been allowed in Portland and in Vancouver, BC. Nothing like a 12 lane Ship Canal Bridge has been allowed in Portland and Vancouver. While Oregon and backwater BC haven't been able to thwart the largest city in Washington State, Seattle might eventually become more of a magnet in pulling more people into the area between Portland and V-BC. 

Right now, Vancouver, WA (V-WA) still has a wider bridge than V-BC. Most of the V-BC bridges are so damn narrow that its not possible to have an efficient regional express bus network. As long as there is a refusal to build proper BRT bridges as part of a regional system, it remains a sad joke. 

The Skytrain (LRT) was built with shorter stations than what the underground stations in Seattle and Edmonton are at. Whenever possible, the Skytrain stations are shorter than the C Train stations in Calgary, DART stations in Dallas and even the Max in Portland. 

The biggest mistake of the Skytrain was to not build all of the stations with a future level clearance to eventually have Montreal Metro size stations of 500 feet or 152.5 m. Instead, the first 2 lines only have 80 m stations and the line to YVR (The Canada embarrassment Line) is only 50 m. Backwater BC logic is that a 5 car Skytrain could run twice as frequent as a 9 car Montreal Metro train. Someday, a 2.5 car YVR-Canada Line train could also run much more frequently than a 9 car Montreal Metro train. 

There is just one key problem with that type of BC logic. While initially constructing short stations and having short trains can save money, its not proper BIG city size infrastructure. In the long run, it costs more to try to lengthen stations for longer BIG city type trains. 

Wednesday, June 17, 2026

Can the SkyTrain in BC, Canada ever become a very high capacity system?

 Why BC, Canada Got it Right With its New SkyTrain https://www.youtube.com/watch?v=dqo_KAEF81k 

The argument is that a mostly elevated train can move more people than an 8-10 lane elevated freeway, at much less the cost. However, any major urban grade-separated LRT system should be designed to eventually become a very high capacity conduit.

The first 2 lines only have 80 m stations, which are just a little more than half the length of a 152.5 m Montreal Metro station. Unfortunately, the line to Richmond only has a designed level clearance for 50 m stations, not even quite a 3rd of the length of a Montreal Metro station platform. 

While it might seem economical to opt for short trains and stations, the Skytrain stations should have still been designed to eventually become more like a proper big city train station allowing for much higher capacity. 

The first 2 lines can run the newest 5 car trains, but the 3rd line can only run 2.5 car trains, some day.

Monday, June 8, 2026

The Unusual transportation approaches used in Vancouver

 https://www.vancouverisawesome.com/history/5-of-a-kind-unusual-modes-of-transportation-used-or-nearly-used-in-vancouver-12388220 

Vancouver is such an unusual and backwards city with its inefficient and congestive approach towards transportation infrastructure.

Getting rid of the streetcars and interurban trams was utterly foolish! Fortunately, such MADNE$$ wasn't adopted in Melbourne, SF, Toronto, Boston, Philadelphia and New Orleans. 

Just because a no freeways mandate was chosen for Vancouver, the streets should have been kept wide enough for busses as well as other vehicles. 

https://movementyvr.ca/the-case-of-vancouvers-nine-missing-bus-lanes

Despite most of the Vancouver bridges being too narrow, some bridge lanes were removed, because the city wasn't interested in building parallel bike bridges. 

Since most of the bridges are so narrow, there isn't enough room for proper express bus lanes. Of course the city isn't interested in building parallel bus bridges next to the narrow bridges. 

Since Vancouver is supposed to be a major, properly functioning city in Western Canada, the city should have pressed the designers of the first 2 Skytrain lines to make sure that all of the 80 m stations could gradually be extended to 152.5 m, the same as the 500 foot long Montreal Metro stations and trains.

Unlike the first 2 Skytrain lines, the Canada Line was only designed to ultimately have 50 m stations and trains. A 2 billion dollar line to YVR could have been designed in such a way that would have allowed it to look and function like a proper big-city passenger train. 

A commuter train to the North Shore keeps taking a long time to be finalized.

https://northshoreconnects.ca/wp-content/uploads/2021/10/BIRT-Benefits-Assessment_Final.pdf

Think small and build backwards, or not at all. 

Friday, May 22, 2026

Canada Line station platforms being extended for interchange hub with Broadway Subway

 https://dailyhive.com/vancouver/canada-line-broadway-city-hall-station-platform-extension-millennium-line-interchange Fortunatly, the planning for the TTC Subway, Montreal Metro & Edmonton LRT, all have much longer stations than what backwards Vancouver settled for. 

https://dailyhive.com/vancouver/skytrain-canada-line-rebuilding

Once all of the YVR-Canada Line stations have 50-metre-long platforms, it will become quite apparent that the long-range planning for 5 car trains wasn't seriously considered. The 50 m stations will only be long enough for a 2.5 car joke of a train. 

However, there is a potential to work around this particular manifestation of the Vancouver Mind Virus. Selective_door_operation can allow for longer trains, despite the ridiculous short Vancouver stations. 

https://en.wikipedia.org/wiki/Selective_door_operation#International_variations


There is such a problem with Vancouver and BC in general of not properly planning for future transportation infrastructure expansion. 

https://www.railforthevalley.com/latest-news/zweisystem/the-skytrain-lobby-get-over-it/

Sunday, May 17, 2026

The Broadway Subway-Mount Pleasant to Broadway City Hall

 https://www.youtube.com/watch?v=z64SisMwIuY 

Another illogical lane reduction project. Broadway was for the most part, always 6 lanes, 7, if you count the turning lane at major intersections. The train isn't a 24 hour service, so its important to always have 1 bus lane each way, especially if the train is shut down for an occasional emergency. Then there still should be 2 general lanes each way, because this isn't supposed to be a small town street or avenue. 

This, combined with so many 4 lane bridges, ensures that BC bottleneck-chokepoint planning remains firmly entrenched. 

A 5 car Vancouver train is expected to do the job of a 9 car Montreal Metro train. That's because a short Vancouver train can run a little more frequently than a 9 car Montreal Metro train, during even the most busy times of the day. Of course many proper cities have long big-city trains, because they aren't under anything like small thinking Vancouver, or a backwater BC mentality.

The standard short trains, narrow bridges & narrow streets and short buildings, are all part of holding the scale of Vancouver back. Apparently, if you can't build a wall around Vancouver, the next best thing is to continually plan and build symbolically for a provincial backwater of a city. 


https://jfdatalinks.blogspot.com/search?q=Selective+Door+Operation

Oakridge Park and Mall

 https://www.youtube.com/watch?v=E6Kwx7SctJ4 

Somehow the people around Broadway Station weren't able to stop this. Well, the Oakridge Station area is becoming its own town centre in that part of provincial Vancouver. Yet, the Broadway & Commercial area is already a big transportation intersection.

Despite the C-Line still only running 2 car joke trains, there is a potential to have 3 car trains. That's still pretty sad when the 50 m stations should have been built to eventually accommodate 5-6 car trains. Unfortunately, the planners never seriously considered to have a future level station clearance of 100-120 m. In contrast, the Montreal Metro has 152.5 m stations and can accommodate 9 car trains. The Vancouver Mind Virus (VMV) has always prevented the city from thinking on a big scale. 


https://jfdatalinks.blogspot.com/search?q=Oakridge+Park+Mall 

https://jfdatalinks.blogspot.com/search?q=Selective+Door+Operation

Wednesday, May 13, 2026

Is the SkyTrain (YVR) Canada Line under-built and nearing capacity, because of Short platforms and trains?

https://dailyhive.com/vancouver/short-platforms-and-trains-is-the-skytrain-canada-line-under-built-and-nearing-capacity

Its one thing to build a line with stations that are only a 3rd of the length of a Montreal Metro station, but to no not properly allow for enough future level clearance is so inept. 

https://en.wikipedia.org/wiki/Selective_door_operation#International_variations

https://dailyhive.com/vancouver/skytrain-canada-line-rebuilding 

https://dailyhive.com/vancouver/canada-line-skytrain This and the 3 lane Lion Bridge should get an award for the blatant symbolism of not wanting to build proper big-city infrastructure in backwards BC.

Friday, April 17, 2026

Eight more Mark V trains are now in service on SkyTrain's Expo Line

 https://dailyhive.com/vancouver/skytrain-mark-v-trains-incoming-arrivals-april-2026 

While the Montreal Metro can run 9 car trains and Auckland is planning to eventually have 9 car trains, the 1st Skytrain line can only run 5 car trains. The 2nd and 3rd Skytrain lines are still only running 2 car joke trains.

Combine that with mostly narrow regional bridges, and BC is clearly maintaining its congestive transportation agenda.

Sunday, March 29, 2026

YVR-Canada Line and REM Train

 https://www.youtube.com/watch?v=a1ouk0VifwM&t=42s Even if the YVR-Canada Line had to initially be built as a symbolically small city train, urban transportation infrastructure can be designed in ways that can double or even triple capacity to meet future demand. Unfortunately, its very difficult to build anything in BC with significant future capacity in mind.

Ultimately, the YVR-Canada Line should have had level station clearances to eventually be able to accommodate 10 car trains. Unfortunately, in typical backwards BC planning the stations weren't even designed with enough level clearance to accommodate 5 car trains. The joke that is the Canada Line only has a level station clearance of 50m to eventually accommodate just a 2.5 car train. 

Most other cities actually build long stations to accommodate long trains right in the first place. Or, at least allow for enough level clearance so that the stations can eventually be doubled or tripled in length. 

The YVR-Canada Line should have started with the Vancouver & Richmond segment, then the Vancouver and Horseshoe+Bay+ferry+terminal segment. Then finally, the YVR to Delta and the Tsawwassen+ferry+terminal

The SkyTrain Stations in Greater Vancouver https://www.youtube.com/watch?v=6Qg78Bmf1fk

Unfortunately, proper big city transportation planning is very difficult to achieve in backwards BC. So much is watered down in Vancouver.


Montreal’s Biggest REM Expansion Yet https://www.youtube.com/watch?v=4G1oeIAfxDU&t=106s 

The Montreal REM https://www.youtube.com/watch?v=g9O6RzsXIqQ 

While the REM was designed to help the Metro, it should have the capability to be gradually expanded. Eventually, REM trains should be lengthened from 4 car trains to 6 and even 8 car trains. 

In contrast, every Skytrain line should have been designed with enough level future station clearance to eventually accommodate a train as long as a 152.5 (500 ft.) long Montreal Metro train. The first 2 Skytrain lines have 80m stations and the joke that is the Canada Line only has 50m stations. 

While the first 2 lines can accommodate 5 car trains, the C Line wasn't designed to accommodate 5 car trains. Just 2.5 car trains, someday. 

Despite there being such a symbolic push for Vancouver to keep having short trains, narrow bridges and stumpy buildings, things are gradually changing in backwards BC. The Vancouver or BC Mind Virus should have been challenged decades ago, but too many loud people wanted to perpetuate the, KEEP THINGS SMALL AND INDEQUATE agenda.

Given how most of the bridges in Greater Vancouver are so narrow, there isn't enough room for proper bus and HOV lanes, or even wide emergency lanes. One would think that at least the trains & stations would have been designed to eventually be doubled or tripled in length. But that would go against the mutigenerational congestive planning agenda. That's why there still is only a 3 lane LGB when there should have been at least a parallel bus, HOV and train tunnel. The Pattullo+Bridge replacement didn't open with 2 bus and 2 HOV lanes, not even wide shoulders or emergency lanes. NW really likes the congestive planning approach. Of course the new tunnel between Richmond and Delta won't have an additional provision for a train tube. This will also help to perpetuate the congestive transportation mandate. 

Fortunately, Selective_door_operation technology can eventually allow more sensible transportation planners to enable longer trains. 

https://en.wikipedia.org/wiki/Selective_door_operation#International_variations , https://www.youtube.com/watch?v=YdH5d1ZthmM 

This means that a 5 car Skytrain (85m) could eventually become a 7 car train, despite the 80m stations. 

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)_rolling_stock#Alstom_Mark_V Thus, an 80m train can become a 117m train.

A two car and 2.5 car (50m) train on the multibillion dollar Canada Line is so absurd and inept! With some slight station modifications, there could be a potential to eventually accommodate three, 20m cars at such short platforms. Then, once 3 car trains could become possible, its just a matter of having an extra 20m car at both ends of each train. A 5 car train of 100m is so much better than a 50m joke of a train. 

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)#Alstom_Mark_V_fleet 


https://jfdatalinks.blogspot.com/search?q=SkyTrain-Canada+Line

https://jfdatalinks.blogspot.com/search?q=REM

Saturday, March 28, 2026

Vancouver 1960s vs Today: The Shocking Difference

 https://www.youtube.com/watch?v=JnMLMp_gf1w 

Unlike Toronto, SF and Melbourne, Vancouver was one of the first cities to get rid of streetcars and tram-trains or interurbans. Backwards Vancouver will likely be one of the last cities to ever bring them back. 

No office tower in Vancouver was allowed to have a 30th floor before the 1970s. https://en.wikipedia.org/wiki/TD_Tower_(Vancouver) The first 30 story office tower in backwater BC opened in 1972. As of 2026, no office tower in Vancouver, or anywhere in BC has been permitted to have a 40th floor. 

As of 2026, no Skytrain stations are even close to the length of the Montreal Metro, TTC subway and underground Edmonton LRT stations. 

Unfortunately, almost every city around the world is expensive. Its just that you get less of things in Vancouver. Short trains, short buildings, narrow bridges and mostly narrow streets. 

Thus, its no surprise that there isn't a regional network of bus-bridges. Congestive transportation planning is what Vancouver does best. 

Vancouver seems to be reluctant in constructing a network of bike-bridges. The city would rather remove a total of 5 lanes from 3 bridges for bike lanes. 

Broadway will eventually be reduced from 6 lanes to 4 lanes so that even some small towns will have wider major streets.  

https://en.wikipedia.org/wiki/Vancouver

https://en.wikipedia.org/wiki/List_of_the_largest_municipalities_in_Canada_by_population 

https://en.wikipedia.org/wiki/Lower_Mainland

Thursday, March 26, 2026

K Line (Los Angeles Metro)

 https://en.wikipedia.org/wiki/K_Line_(Los_Angeles_Metro) 

https://la.urbanize.city/post/metro-seeks-state-funds-extend-green-line-platforms 

https://en.wikipedia.org/wiki/K_Line_(Los_Angeles_Metro)#Rolling_stock 

Car length89 ft (27.13 m)
Width8 ft 8+34 in (2.66 m)
Height12 ft 6 in (3.81 m)

https://en.wikipedia.org/wiki/Kinki_Sharyo_P3010 

https://upload.wikimedia.org/wikipedia/commons/thumb/0/07/LA_Metro_Rail_Expo_Line_Kinki_Sharyo_P3010_17th_St_Santa_Monica_College_Station_%2848943282587%29.jpg/960px-LA_Metro_Rail_Expo_Line_Kinki_Sharyo_P3010_17th_St_Santa_Monica_College_Station_%2848943282587%29.jpg  

https://www.metro.net/projects/kline-northern-extension Just like in SD, Seattle, Calgary and Edmonton, their LRT trains are longer than the ones on the first 2 Skytrain lines. Especially, the embarrassing Canada Line. 

https://www.latimes.com/california/story/2026-03-24/this-rail-line-would-get-you-to-grove-beverly-center-cedars-sinai-is-it-l-a-s-missing-link In backwards BC its like it takes 2 or 3 people to turn a lightbulb than someone in Quebec. An 80m Skytrain on the first 2 lines would have to be about twice as frequent as a 152.5m Montreal Metro train to match capacity. The ridicules 50m maximum allowance for Canada Line trains would have to run 3 times as frequently as a Montreal Metro train. 

https://la.streetsblog.org/2026/03/18/metro-committee-again-sides-with-nimbys-postpones-key-north-k-line-rail-decision Unfortunatly, the Vancouver Mind Virus is all about holding back the scale of the city. Thus, anytime that a bridge or street can be narrower, a building kept shorter and especially a train kept short, is all part of the imposed symbolism of refusing to build on a BIG city scale. 

Sunny L.A. has been thinking, planning and building like a BIG city for over a century. In contrast, rainy Vancouver has been refusing to think on a big city scale throughout its history. For several decades, all White city counsels kept imposing various restrictions to keep Vancouver on a small scale. 

Friday, February 6, 2026

REM and Metro in Montreal

The REM vs. Reality: Does Montreal's new train meet expectations? https://www.youtube.com/watch?v=eq1xpxOt7FM&t=596s 

Montreal’s Biggest REM Expansion Yet! https://www.youtube.com/watch?v=4G1oeIAfxDU&t=12s  

How Montreal’s miracle metro could change everything https://www.youtube.com/watch?v=XlHqqA0onn0  

Evolution of the Montreal Metro & REM 1966-2030 https://www.youtube.com/watch?v=7zvOk2t1EpE

Saturday, January 31, 2026

Why Greater Toronto Has Several Skylines

 https://www.youtube.com/watch?v=eI9WJa9Q8dA 

Of course many large urban areas around the world have more than 1 or 2 skylines or tower clusters. 

For the longest time, no building in Vancouver or BC, was allowed to be as tall as the 1930s CIBC tower, which is now a stump.

https://www.blogto.com/city/2017/05/toronto-lost-observation-deck-commerce-court-north/

https://www.torontojourney416.com/canadian-bank-of-commerce-building/ 

https://www.25king.ca/the-history 

It wasn't until the early 1970s when stumpy, Vancouver allowed a building to be taller than the L.A. City Hall, or the Smith Tower in Seattle. 

The 1930s CIBC tower, the L.A. City Hall and the Smith Tower, would still be prominent towers in Vancouver, but stumps in their own cities. 

Despite Vancouver being divided by an inlet and a river, the city wasn't able to build a huge wall along Boundary Road. Thus, the KEEP THEM OUT agenda was a little thwarted. The various White city councils tried to do the next best thing. That was to symbolically impose various restrictions as a reluctance to think, plan and build on a BIG city scale. The time especially from 1960 to 2000 had predominantly White City Hall and its councils continually impose several overlapping restrictions. 

Since Vancouver can't control immigration or the movements of non-white people, keeping things small and backwards, means that less people will move there than to Toronto, Montreal, Calgary and Edmonton. However, with a mild winter climate, more and more people want to move to backwards BC, especially small-minded Vancouver and provincial Victoria. 

In spite of immigration and Multiculturalism, Vancouver was to perpetually promote its small scale agenda. 

While the first Skytrain line can finally run 5 car trains, the stations weren't designed to become long enough to eventually accomodate 9 car trains like the big city Montreal Metro has. 

The 2nd and 3rd Skytrain lines are still only running 2 car joke trains. Running 8-10 car trains is what a proper big city would do, but not backwards Vancouver. 

Narrow bridges provides strong symbolism of the cities narrow-mindedness. When bridges are too narrow, its difficult to have a proper express or rapid bus system. The reluctance to build parallel bus and HOV bridges helps to maintain the congestive planning approach that is vancouver and the Greater Region. 

Vancouver's refusal to build parallel bike bridges has meant that 2 lanes were removed from the Burrard Bridge, 1 lane from the Cambie Bridge and 2 lanes from the Granville Bridge. 

Keeping buildings symbolically short when compared to what scenic Sydney, Auckland, SF and Seattle allow, also helps to maintain Vancouver's reluctance to enter the big and tall urban scale. In fact, the scenic setting that Vancouver is in has been used as the main excuse to continually scale the city down. Yet, several scenic cities around the world are either able to have wider bridges, wider roads, longer trains or taller buildings. 

The world is mostly composed of non-white people. Canada has less than 1% of the world's population and stubborn Vancouver symbolically remains as a small provincial backwater on the Pacific Rim. 

https://centralparktower.com.au Unlike Perth, Vancouver forbids 50 story office towers and Brisbane, Sydney and Melbourne size residential towers. 

https://en.wikipedia.org/wiki/108_St_Georges_Terrace In fact, no office building in Vancouver has been permitted to have a 40th floor. However, since Burnaby and Surrey aren't under the restrictive controls of Vancouver, they will eventually allow office towers over 40 stories. 

Despite Australia having less people than Canada, Perth is allowed to have taller buildings, wider bridges and longer trains than Vancouver. Taller buildings, wider bridges and longer trains are even less likely in Halifax than whats in Brisbane or Queensland.

https://en.wikipedia.org/wiki/Q1_(building) To see buildings on a similar scale of what Brisbane allows, one has to get to Greater Toronto. Brisbane is allowed to have some buildings that would even be impressive in Melbourne and Sydney. 

While Montreal is allowed to have taller buildings than Vancouver, Montreal isn't allowed to have Sydney size towers. Especially not on the scale of what Melbourne and Toronto permit. 

Saturday, January 17, 2026

The Great SkyTrain upgrade (potential)

 https://www.youtube.com/watch?v=_D2CXdZ_4Ro 

Unfortunatly, the first 2 Skytrain lines were designed to only have 80m stations and trains. The 3rd line to YVR and Richmond was only designed to have 50m stations. In contrast, the Montreal Metro has stations long enough to accomodate 152.4m long trains. Thus, the greatest mistake was to not enable the Skytrain to eventually become a very high capacity train system. Combine that with mostly narrow bridges and roads in Greater Vancouver and you have the epitome of congestive urban planning. 

At least by late 2025 some of the new 5 car trains were out, along with some of the old 6 car little box trains on the 1st line. The 2nd and 3rd lines are still running 2 car joke trains, but that symbolically fits right in with the, KEEP BC SMALL AND BACKWARDS mentality. 

A proper big city long-term plan would have been to allow for 10 car trains, with at least 5-6 car trains at the start when each line opened.

Wednesday, December 24, 2025

Spacex starship height

 https://www.spacex.com/vehicles/starship 123m or 403 feet in length.

https://www.businessinsider.com/spacex-starship-nasa-saturn-v-sls-moon-rockets-comparison-2019-7

https://www.nps.gov/wamo/faqs.htm 169m or 555 feet. https://en.wikipedia.org/wiki/Washington_Monument 


Even the Skytrains in backwards Vancouver aren't allowed to be as long, due to such short stations. Of course the Montreal Metro can run 152.4m or 500 foot long trains, because of building longer stations in the first place.

Monday, December 8, 2025

The Montreal Metro and REM Trains

The REM vs. Reality: Does Montreal's new train meet expectations? https://www.youtube.com/watch?v=eq1xpxOt7FM