Showing posts sorted by date for query YVR-Canada-Line. Sort by relevance Show all posts
Showing posts sorted by date for query YVR-Canada-Line. Sort by relevance Show all posts

Sunday, September 6, 2026

A Speculative Map of Montreal Metro-REM-EXO

 https://www.reddit.com/r/TransitDiagrams/comments/1w9apwg/oc_montreal_metroremexo_speculative_map/ 

What if Montreal could have a Paris scale of transportation infrastructure? Unfortunately, Greater Montreal hasn't reached the 5 million point yet, let alone 10 million people. Thus, the really big city stuff is still quite a ways off. 

At least Montreal isn't stuck with a 3 lane LGB. So far, Vancouver isn't interested in building an express bus tunnel and an LRT tunnel next to the inadequate LGB. A line from Burrard_station to Park+Royal and the Horseshoe+Bay+ferry+terminal would be getting into proper big city transportation infrastructure. Just like a tunnel between Waterfront station and Lonsdale_Quay would be.

At least Le REM wasn't designed to be a 2 car joke of a train like the YVR-Canada+Line is. 

The stations on the first 2 Skytrain lines are barely half the length of a 9 car Metro station. While a REM station can accommodate a 4 car train, the Canada+Line stations can only accommodate a 2.5 car train, but only 2 car joke trains, so far.

Monday, August 31, 2026

Why New York City has a Two-Car Subway Train and provincial Vancouver is stuck with a 2 car airport train

 https://www.youtube.com/watch?v=xH37SqlW0Ks 

https://en.wikipedia.org/wiki/Franklin_Avenue_Shuttle 

https://en.wikipedia.org/wiki/R68_(New_York_City_Subway_car) 75-foot (22.86 m) length for each car. So roughly, a 2 car joke of a train is almost 46 m, or 150 ft. The absurd Canada_Line-Stations with its 2 car trains are in the 40 m to 50 m range. Thus, only two car & 2.5 car trains are only possible. In contrast, a 9 car Montreal_Metro train can be up to 152.5 m, or 500 ft.

Train length
  • 2 car train: 150 feet (46 m)
  • 4 car train: 300 feet (91 m)
  • 8 car train: 600 feet (180 m)

https://en.wikipedia.org/wiki/R68_(New_York_City_Subway_car)#Description So, an 8 car, 600 foot long train is 100 feet longer than a 500 foot, 9 car Montreal train. 

The end of the line for the Franklin_Avenue_Shuttle is only a single track platform. 

Unfortunately, the YVR and the Richmond end if the Canada_Line stations are also a single track platforms. Even if this was initially decided as a cost saving measure, a double track guideway still should have been built. Then, a proper double track station could eventually be completed. Especially if the line is ever extended to the Delta Ferry terminal.

The YVR-Airport_station was deliberately designed to be narrower and shorter than what a proper big city airport station should be. Its another example of the unofficial BCMV reducing and thwarting the scale of things. 

https://en.wikipedia.org/wiki/Pearson_Airport_station Almost like REM quality for Toronto, but not for provincial Vancouver. https://www.upexpress.com/en/up-express-stations/pearson-station , https://www.torontopearson.com/en/transportation-and-parking/up-express Wow, Toronto like Perth can run 3 car big city type trains. https://en.wikipedia.org/wiki/Union_Pearson_Express#Rolling_stock Vancouver can only hope for a 2.5 car train, someday. 

https://en.wikipedia.org/wiki/Union_Pearson_Express#Route Sometimes, a 2 car joke of a train might be OK to start with, but there should already be enough station clearance for at least 3-5 car trains. Then, as long as its a walk-through train, Selective_Door_Operation (SDO) can make it possible to add an extra car at both ends of a short train. SDO can be an intermediate step before having to extensively lighten each station. 

Stubborn, backwards Vancouver will eventually have to seriously consider SDO in order to have longer big city type trains. Unfortunately, as long as its stuck in the BC backwater mentality or under the spell of the BCMV, things won't improve.

https://canada.constructconnect.com/dcn/news/projects/2026/05/montreals-airport-rem-station-will-have-signature-iceberg-motif , https://montrealgazette.com/news/rem-has-begun-testing-trains-on-airport-branch Of course the YUL-P.E. Trudeau_station, like the Honolulu Airport station, will be longer and wider than the one at YVR.

Perhaps the short, single track & platform at the YVR-Airport_Station would be impressive if it were in Victoria, Prince George, Kamloops or Kelowna, but its hardly impressive when compared to the SeaTac/Airport_station, Portland_Airport_station, Lelepaua_station in Honolulu, Brisbane_Airport station, Sydney_Airport stations, the future Melbourne_Airport station and Perth_Airport station. The scale of the San_Francisco_International_Airport_station, which can accommodate 10 car trains, is on a whole other scale. All major airports and their train stations in Asia & Europe are so far beyond what Canada has. There is no reason as to why Greater Vancouver and some other cities in BC, can't be upgraded to a Pacific Rim infrastructure level, instead of  being stuck in a perpetual BC backwater mindset. 

The VMV, under the umbrella of the larger BCMV, is such a horrible impediment and it doesn't even officially exist. 

Saturday, August 29, 2026

Vancouver International Airport (YVR) is Getting MASSIVE Upgrades

 https://www.youtube.com/watch?v=XQw18DQ4TlY MA$$IVE Upgrades? Compared to what, other provincial backwaters? 

SkyTrain Front Window View - Canada Line to YVR https://www.youtube.com/watch?v=WxTEBfxYH0g This is very sad & pathetic that the stations weren't designed to be long enough to accommodate a 5 car train. The stations can only accommodate a 2.5 car joke of a train. The real sad joke is that the line is still only running 2 car trains on what is supposed to be a major urban area on the Pacific Rim.

Unfortunately, even if Vancouver-Surrey & Abbottsford, Victoria & Nanaimo, Prince Rupert & Kitimat were all upgraded to proper big urban areas on par with Melbourne, Sydney & Brisbane, or even Seattle & Calgary, BC just isn't as warm as Australia, or even NZ for half of of the year. Edmonton & Calgary, Seattle & Portland are able to have wider bridges & roads, and even longer trains than Vancouver to Richmond & Vancouver to Surrey-Langley. 

Fortunately, the Pacific Rim part of Australia hasn't been trapped in a provincial backwater mentality like the Pacific Rim part of Canada. For too long there has been a keep BC small and backwards mindset. AKA, the BC Mind Virus (BCMV).

Running short & frequent trains could be seen as a cost saving measure initially, but unless there is a genuine to have proper long big city type trains, the BCMV still wins out. The fanatical approach to keep most of the bridges in BC so narrow has made it very difficult to have a proper regional express bus network, let alone BRT. 

The 3 main seaport regions of BC, Greater Vancouver, Victoria-Nanaimo-Kitimat should become proper big city ports on the Pacific Rim. BC is 23 times the size of Switzerland, yet it doesn't even have the population of 1 CH. Canada in turn, has less than half of 1% of the worlds population. 


Wednesday, August 26, 2026

Highway 99 Tunnel Program Update

 https://www.youtube.com/watch?v=fvaPpt2R69Y 

A parallel bridge or tunnel should have been built decades ago.

There should have been 3 + 1 express bus lane each way, but also a temporary HOV lane each way. Then eventually, becoming 4 general lanes each way with the 5th becoming a totally separate BRT line each way. 

Unfortunately, no 10 lane tunnel, just like no 10 lane bridge. Thus, whenever the 8 lane tunnel finally opens, there should be serious planning for a parallel BRT and LRT bridge or tunnel. 

An extension of the YVR-Canada Line to the mall and ferry terminal would be of great benefit. However, since BC doesn't have 24hr train service, 24hr BRT can fill in the gaps.

Monday, August 17, 2026

The Oakridge–41st Avenue Station

https://dailyhive.com/vancouver/oakridge-41st-avenue-station-early-closure-construction-august-2026

 https://www.richmond-news.com/highlights/vancouver-canada-line-station-close-early-august-2026-12675151 

https://www.google.com/maps/place/Oakridge-41st+Avenue 

https://dailyhive.com/vancouver/canada-line-skytrain For a line of B$ to have opened in 2009 and is still only using 2 car joke trains is a pretty sad example of inept transportation infrastructure planning. 

Even using the argument that it was necessary to have a watered down or scaled back the YVR-Canada+Line to save money, this line of B$ still could have been designed to eventually become a proper big city like train. As long as the 50 m stations were designed with a future level clearance of 130 m to 153 m, the underground stations could have been as long as the Montreal Metro stations, or at least as long as the underground Edmonton LRT stations.

The YVR-Canada Line since 2009

The Canada_Line opened with 2 car trains and is still running just 2 car trains. https://www.youtube.com/watch?v=a1ouk0VifwM&t=817s

https://thecanadaline.com/station-history No reasonable attempt was made to make sure that the stations could eventually accommodate at least 5 car trains. 

https://en.wikipedia.org/wiki/Canada_Line#Stations The inadequate 50 m stations can only accommodate a 2.5 car train, not a 5 car train.

https://globalnews.ca/news/5778392/canada-line-10-year-anniversary/

https://buzzer.translink.ca/2024/08/skytrains-canada-line-marks-15th-anniversary/

https://en.wikipedia.org/wiki/Canada_Line#Technology 

https://www.atkinsrealis.com/en/projects/the-canada-line 

https://thetyee.ca/News/2025/01/31/Canada-Line-New-Stop-Years-Making/ 

https://www.bb-gi.com/investment/canada-line/ 

 Airport to Downtown Vancouver Transit Guide (Don't Take a Taxi!) https://www.youtube.com/watch?v=9bNYrJhUgu0

https://www.railforthevalley.com/latest-news/zweisystem/should-we-convert-the-canada-line-to-light-rail-2 

 This $9 Train Saves You $40 at Vancouver Airport (YVR to Canada Place) https://www.youtube.com/watch?v=ZxUpww86dow

Fortunately, the REM trains in Montreal can accommodate 4 car trains, as does the Skyline_(Honolulu). 

The big mistake for all 3 of the Skytrain lines was not having all of the stations to be capable of accommodating 6-8 car trains. Plus, allowing for a future level station clearance of 153 m-160 m. That would have allowed Greater Vancouver to start of with short REM & Skyline type trains, with the capability to eventually have trains as long as those on the Montreal_Metro.  

Proper big city transportation infrastructure is so difficult to plan and build in backwards BC.


https://jfdatalinks.blogspot.com/search?q=YVR-Canada+Line

Sunday, August 16, 2026

New South Wales H set trains

 https://en.wikipedia.org/wiki/New_South_Wales_H_set 

Train length81.55 m (267 ft 6+5⁄8 in)
Car length
  • 20.34 m (66 ft 8+3⁄4 in) (OD)
  • 20,435 mm (67 ft 1⁄2 in) (ON/ONL)

https://en.wikipedia.org/wiki/New_South_Wales_H_set#Design 

https://en.wikipedia.org/wiki/South_Coast_Line 

https://en.wikipedia.org/wiki/Sydney_Trains 



Example of selective door operation. The doors in the first 2 carriages are not opened, because the platform is too short for an 8-carriage OSCAR train. https://en.wikipedia.org/wiki/Selective_door_operation (SDO)

https://upload.wikimedia.org/wikipedia/commons/thumb/9/95/Selective_Door_Operation.jpg/960px-Selective_Door_Operation.jpg 
This platform can accommodate 6 out of an 8 car heavy-rail train. 

This means that an extra car or 2 can be added to a shorter train, even if the station isn't long enough. 

Thus, before lengthening the stations on the first 2 Skytrain lines, a 5 car train could become a 7 car train. Perhaps even a 9 car train, like with the Montreal Metro trains. Eventually, the stations on the first 2 Skytrain lines could be lengthened for 7 car trains and whenever possible, 9 car trains.

Unfortunately, the 50 m level station clearance for the YVR-Canada Line trains wasn't designed for 5 car, 100 m trains, just a 2.5 car joke of a train. However, with some platform modifications and some very slight station lengthening, three 20 m cars might be possible, instead of a 2.5 car joke of a train.  

Then, once a 3 car, 60 m train is adapted to a 50-55 m platform, SDO can enable an extra car at each end to become a 5 car train. Perhaps ultimately, there could even be an extra 2 cars at each end of the middle 3 car train, to become a 7 car train.


Tuesday, August 11, 2026

A look inside Broadway-City Hall Station's future Canada Line-Millennium Line interchange

 https://dailyhive.com/vancouver/broadway-city-hall-station-canada-millennium-lines-skytrain-interchange-construction 

It really would have been nice if the YVR-Canada Line was able to run 5 car trains by now. Unfortunately, due to inept transportation planning in the BC part of Canada, the stations were only designed to accommodate 2.5 car trains. 

A 2.5 car train fits right in with a 3 lane Lion Bridge that was never augmented with parallel BRT and LRT train tunnels. 

Backwards Vancouver and backwater BC, are some of the best places in the world to see inept multigenerational transportation infrastructure. 


Friday, August 7, 2026

3 Ways to the JFK Airport

 https://www.youtube.com/watch?v=YG1aRLZwihA  

Of course Vancouver opted to have the shortest airport train possible. The 2 car YVR-Canada+Line. 


https://jfdatalinks.blogspot.com/search?q=NYC

Wednesday, August 5, 2026

Some massive transportation projects in Metro Vancouver

 https://www.youtube.com/watch?v=emSr9NLwfT4 

Unfortunately, the Broadway+Subway will only open with the potential of 5 car trains, not 10. 

Unfortunately, the YVR-Canada+Line wasn't even designed to have 5 car trains, only a potential of 2.5 car trains, someday. 

Of course the Massey+Tunnel+replacement wasn't designed to have an LRT and a BRT section. Thus, in addition to the basic 3 lanes each way, there will only be an express bus lane.

A separate BRT section would be beneficial since BC doesn't want to run 24hr trains. Thus, when the LRT is shutdown for maintenance, a 24hr BRT line could still be running. Unfortunately, part of the BC Mind Virus is backwards thinking and inept infrastructure planning. Of course there is still no official plan to have LRT from YVR to the Tsawwassen Ferry terminal anytime soon.

Saturday, July 25, 2026

Why Montreal’s shortest Metro line exists

 https://www.youtube.com/watch?v=WKI4DhIC2DY 

https://en.wikipedia.org/wiki/Yellow_Line_(Montreal_Metro)

https://www.youtube.com/watch?v=uDxX0HU3Srg REM 

Unlike the 2009 YVR-Canada Line, which is still only running 2 car joke trains, La REM has 4 car trains. Hardly as long as a 9 car Metro train, but it can run with shorter headways. 

https://en.wikipedia.org/wiki/Yellow_Line_(Montreal_Metro)#Proposed_extensions 

https://en.wikipedia.org/wiki/Yellow_Line_(Montreal_Metro)#Rolling_stock 6 car trains

Vancouver SkyTrain Front Window View - King George Station to Vancouver Waterfront

 https://www.youtube.com/watch?v=GLOYm6u8ecc 

This really should be a line from Langley to West Vancouver, someday.


https://www.youtube.com/watch?v=_VPFqSyi1Z4&t=50s Line 3 or line C or C Line? Perhaps the YVR-Canada Line. https://www.youtube.com/watch?v=cHuus0AHPRw  

This ultimately should be a line from Delta to YVR and to West Vancouver.



 History of the SkyTrain https://www.youtube.com/watch?v=pP4RUBp1Ucw

Greater Vancouver's SkyTrain Network Evolution https://www.youtube.com/watch?v=AXF44HciCe8  


Why the SkyTrain and DLR are So Unique https://www.youtube.com/watch?v=KrMISsHZ85s

Monday, July 6, 2026

New replacement George Massey Tunnel to cost $8.5 billion and opening in September 2031

 https://dailyhive.com/vancouver/george-massey-tunnel-new-replacement-cost-timeline-update 

Of course with all the extra delays costs, there still won't be an LRT tube and no HOV lanes. While the new tunnel will be 4 lanes each way, there should have been an extra section for 2 LRT tracks and 2 rapid bus lanes. BC has a problem providing 24hr rapid rail transportation, so 24hr BRT is essential. 

A 10 lane version of an Alex_Fraser_Bridge with a provision for LRT, could have been completed a few years ago. However, just because some people didn't want a bridge crossing that part of the river, the plan was scrapped. The result is more cost and delay in what should have been completed a few decades ago. 

If ever a proper LRT and rapid bus crossing can be built parallel to the new tunnel, then that 8 lane tunnel could still have 3 general lanes each way, plus the 4th being an HOV lane. A parallel LRT and rapid bus needs to be built between Richmond and Delta so that there can be an efficient connection between YVR and the 2 ferry terminals.

Something like a Tilikum_Crossing between Richmond and Delta should have already been built decades ago, but there just isn't proper transportation planning in backwards BC.

Either an extension of an improved YVR-Canada Line, or an LRT like the C Train or MAX_Train. Since such a train won't be running 24 hours a day, there would need to be a Rapid bus_crossing as well. Such redundancy is important, especially if there is an occasional problem with the train. A Streetcar_Crossing would also be nice, because the Skytrain, LRT and BRT can't go everywhere. Where as express and local buses and streetcars can fill in the gaps. 

Of course more bicycle and footpaths can be a great improvement.  


https://jfdatalinks.blogspot.com/search?q=Richmond-Delta+Tunnel

Saturday, June 27, 2026

How much will Vancouver change by 2036?

 https://www.youtube.com/watch?v=OJtotvMq2ls 

The Lion+Bridge will likely still not have an express bus and LRT tunnel near it. The+Iron+Bridge still might not have a proper BRT and LRT bridge next to it. The OSB and the KSB will likely not have a bus and bike bridge built beside them. There will still likely be no new Fraser Street Bridge for bikes and buses. No Boundary Road bridges to provide a direct link between the North Shore and Richmond for buses, trucks and bikes.

While the first 2 Skytrain lines will have 5 car trains, the stunted YVR-Canada Line will only have 2.5 car trains. Vancouver still might not permit any office tower to have a 40th floor, but might allow some residential towers to be on a Melbourne, Sydney, Brisbane & Toronto scale. 

However, BIG city thinking and planning in Vancouver has always been so difficult. Boston, SF and the City of Paris are ridiculously small cities like Vancouver with all 3 having a land area of less than 50 sq. mi. or 129.5 sq. km. Yet, Boston, SF and especially the City of Paris, have all been able to fit so much more into the same general space. That's because they aren't bound by anything like the inept and extreme Vancouver type restrictions. 


Sunday, June 21, 2026

How the Seattle to Vancouver area could become a megaregion

 https://www.youtube.com/watch?v=POcg0oFvVf8 

The larger Portland, Seattle and the Vancouver, BC (V-BC) region has a lot of growth potential. However, Seattle size buildings haven't been allowed in Portland and in Vancouver, BC. Nothing like a 12 lane Ship Canal Bridge has been allowed in Portland and Vancouver. While Oregon and backwater BC haven't been able to thwart the largest city in Washington State, Seattle might eventually become more of a magnet in pulling more people into the area between Portland and V-BC. 

Right now, Vancouver, WA (V-WA) still has a wider bridge than V-BC. Most of the V-BC bridges are so damn narrow that its not possible to have an efficient regional express bus network. As long as there is a refusal to build proper BRT bridges as part of a regional system, it remains a sad joke. 

The Skytrain (LRT) was built with shorter stations than what the underground stations in Seattle and Edmonton are at. Whenever possible, the Skytrain stations are shorter than the C Train stations in Calgary, DART stations in Dallas and even the Max in Portland. 

The biggest mistake of the Skytrain was to not build all of the stations with a future level clearance to eventually have Montreal Metro size stations of 500 feet or 152.5 m. Instead, the first 2 lines only have 80 m stations and the line to YVR (The Canada embarrassment Line) is only 50 m. Backwater BC logic is that a 5 car Skytrain could run twice as frequent as a 9 car Montreal Metro train. Someday, a 2.5 car YVR-Canada Line train could also run much more frequently than a 9 car Montreal Metro train. 

There is just one key problem with that type of BC logic. While initially constructing short stations and having short trains can save money, its not proper BIG city size infrastructure. In the long run, it costs more to try to lengthen stations for longer BIG city type trains. 

Monday, June 8, 2026

The Unusual transportation approaches used in Vancouver

 https://www.vancouverisawesome.com/history/5-of-a-kind-unusual-modes-of-transportation-used-or-nearly-used-in-vancouver-12388220 

Vancouver is such an unusual and backwards city with its inefficient and congestive approach towards transportation infrastructure.

Getting rid of the streetcars and interurban trams was utterly foolish! Fortunately, such MADNE$$ wasn't adopted in Melbourne, SF, Toronto, Boston, Philadelphia and New Orleans. 

Just because a no freeways mandate was chosen for Vancouver, the streets should have been kept wide enough for busses as well as other vehicles. 

https://movementyvr.ca/the-case-of-vancouvers-nine-missing-bus-lanes

Despite most of the Vancouver bridges being too narrow, some bridge lanes were removed, because the city wasn't interested in building parallel bike bridges. 

Since most of the bridges are so narrow, there isn't enough room for proper express bus lanes. Of course the city isn't interested in building parallel bus bridges next to the narrow bridges. 

Since Vancouver is supposed to be a major, properly functioning city in Western Canada, the city should have pressed the designers of the first 2 Skytrain lines to make sure that all of the 80 m stations could gradually be extended to 152.5 m, the same as the 500 foot long Montreal Metro stations and trains.

Unlike the first 2 Skytrain lines, the Canada Line was only designed to ultimately have 50 m stations and trains. A 2 billion dollar line to YVR could have been designed in such a way that would have allowed it to look and function like a proper big-city passenger train. 

A commuter train to the North Shore keeps taking a long time to be finalized.

https://northshoreconnects.ca/wp-content/uploads/2021/10/BIRT-Benefits-Assessment_Final.pdf

Think small and build backwards, or not at all. 

Wednesday, June 3, 2026

SkyTrain YVR-Canada Line

 https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)#Canada_Line , https://www.youtube.com/watch?v=WxTEBfxYH0g


https://buzzer.translink.ca/2010/08/canada-line-and-the-olympics "For the 17-day Games period, the Canada Line carried over 3,881,986 passengers, with the most ever riding on Friday, February 19: 287,000 riders!" 

https://www.bcaviationcouncil.org/canada-line-continues-to-break-records-translink/

TransLink's Hyundai Rotem EMU cars have been operating since 2009 and have played a massive role for the City of Richmond, Vancouver and YVR. https://www.youtube.com/watch?v=a1ouk0VifwM   

https://archive.news.gov.bc.ca/releases/news_releases_2005-2009/2009tran0002-000047.htm "During the Olympic Games, there were approximately 230,000 daily trips on the Canada Line." 

https://dailyhive.com/vancouver/short-platforms-and-trains-is-the-skytrain-canada-line-under-built-and-nearing-capacity

https://www.reddit.com/r/vancouver/comments/1eu70hl/skytrains_canada_line_marks_15th_anniversary/ 

https://francesbula.com/uncategorized/is-the-canada-line-at-maximum-capacity-no-will-it-be-in-a-decade-depends-on/ 

https://www.reddit.com/r/vancouver/comments/5t97h9/this_is_why_the_canada_line_has_been_far_less/ 

https://globalnews.ca/news/90468/canada-line-races-toward-capacity/

https://www.reddit.com/r/askvan/comments/1fsfptv/why_are_the_current_canada_line_cars_designed_the/ 

TransLink offers cyclists a lift to BC Ferries, but on weekends only

 https://www.nsnews.com/2026-world-cup/translink-offers-cyclists-a-lift-to-bc-ferries-weekends-only-12332483 

Unfortunately, due to the decades of inept regional transportation planning, no bus bridge or BRT tunnel was ever built next to the D Island Tunnel. While the new tunnel is supposed to have 2 bus lanes, there won't be any HOV lanes and especially no provision for LRT. 

Ultimately, the YVR-Canada Line should be extended to Ladner and the Tsawwassen Ferry terminal. A special train bridge or tunnel should be built with a provision for 2 BRT lanes, since BC doesn't seem to want a 24hr Skytrain. 

Tuesday, June 2, 2026

Seoul's Subway System Is Decades Ahead of many others

 https://www.youtube.com/watch?v=PPlGQDpx4xg 

While there could be a reasonable argument that if a subway or elevated line isn't expected to be that busy in its first few years, then just build half-size stations and run half-length trains. However, in the case of backwards Vancouver, what should have been stations that were designed to accommodate at least 5 car trains, were only designed for an eventual 2.5 car train. Thus, it will be challenging enough just to modify the incredibly short Canada Line stations to gradually accommodate 3 full-size 20 m cars, not just some 2.5 car joke of a train for a 50 m station. 

Fortunately the Skyline_(Honolulu) stations can accommodate a 4 car train right from the start. Someday, with SDO a 4 car train could become a 6 car train.

If Selective+Door+Operation (SDO) can ever be implemented on the YVR-Canada Line then it can go from being a 2 car joke of a train to a 3 car attempt of a train. Then, once people got used to 3 car trains, an extra car could be added at both ends, thus allowing for a 5 car train. 

Ultimately, the YVR-Canada+Line should have been designed as a proper big-city size train with 8-10 cars. There seems to be such a lack of proper long-term transportation infrastructure planning in BC. To just build a small-scale line as a symbolic demonstration of reluctance towards the Pacific Rim is so absurd. 

Fortunately, Melbourne, Sydney and Brisbane never opted for such a short train.  


There Is a Hidden City Under Seoul Nobody Talks About. https://www.youtube.com/watch?v=pIewf8sOZ0I