Monday, August 12, 2024

Several Vancouver narrow bridge issues

 https://dailyhive.com/vancouver/metro-vancouver-bridge-cyclist-wire-allegations

Someone might have been very angry with bike people and not with car, bus & truck people. The real problem is that so much of the older BC infrastructure just wasn't designed to be more of a multi-modal crossing. The+Lion+Bridge+and+The+Iron+Bridge have no rail rapid transit crossings to help them.

The Ironworkers-Bridge is so narrow for a highway bridge in that location & wasn't designed for substantial future capacity. When it was initially designed in the 1950s, there was no concept to have 2 bus lanes, 2 HOV lanes, 2 truck lanes & 2 emergency lanes for a port city. Plus, at least 2 general traffic lanes each way & a provision for 2 train tracks. Thus, the 6 lane bridge is so overwhelmed, because it just can't do the job of an 8-10 lane wide bridge. While the Iron Bridge has 2 improved bike+lanes, they are part of the sidewalks.  

The former 8 lane Granville+Street will have 6 lanes, while the  & Oak+Street only has 4 lanes. The inadequate Oak+Street+Bridge (OSB) should have opened with at least 8 lanes, instead of only 4. Plus, 2 wide emergency lanes & 2 wide sidewalks. There still should be a new southbound OS Bridge, but the city would be against it. A narrow 4 lane bridge just doesn't have the space & capacity for 2 express bus lanes, 2 HOV & 2 truck lanes. Apparently, it's better to just funnel everything into only 2 lanes each way.  

The OSB should be twinned or replace with something like the Samuel-De_Champlain_Bridge in Montreal. The largest city in Quebec is allowed to have a nice wide bridge & long metro trains, because Quebec isn't bound by anything like the backwards BC mentality. 

https://www.theglobeandmail.com/canada/article-montreals-new-44-billion-champlain-bridge-opens-to-traffic-for Fortunatly, the Vancouver mentality wasn't able to ever reach back to Montreal & prevent such a nice modern bridge from being built there. https://www.flatironcorp.com/project/champlain-bridge If you are from Montreal & have visited Vancouver, you will be surprise to see how much shorter an underground Vancouver train station is than what is allowed underground in Montreal, Toronto, Edmonton, Seattle, SF & LA...

https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx A bike & foot bridge should have been built next to it decades ago. Then the Granville Bridge could have 3 general lanes each way, plus a bus & HOV lane each way. Instead, if 2 bus & HOV lanes are designated, there will only be 2 general lanes each way in the downtown core.

The Burrard Bridge should have had a bike & foot bride next to it. Instead, it was reduced from a 6 lane crossing to a 4 lane bridge.

The very narrow Oak+Street+Bridge & the Knight Street Bridge, should have had bus & bike bridges built next to them decades ago. 

Most bridges in Vancouver & the metropolitan region just weren't designed with that much future capacity in mind, especially for buses & HOV lanes. Thus, it's a travesty that by now, almost every crossing should have had bus & bike bridges built next to them. 

https://vancouver.ca/streets-transportation/walk-bike-and-transit.aspx Unfortunatly, provisions for bus & bike lanes just weren't the thing to do several decades ago in BC.  

A truck lane is just as important as a bus & HOV lane. That's because freight should be efficiently & easily be transported in any major urban region.

https://vancouver.ca/streets-transportation/trucks-commercial-and-oversize-vehicles.aspx

https://jfdatalinks.blogspot.com/search?q=Oak+Street+and+Granville+Street

https://jfdatalinks.blogspot.com/search?q=Iron+Bridge 

https://jfdatalinks.blogspot.com/search?q=Lion+Bridge

Tuesday, May 20, 2025

TransLink to extend North Shore RapidBus route to Metrotown starting in 2027

 https://dailyhive.com/vancouver/r2-rapidbus-north-shore-metrotown-burnaby-route-extension

https://aquilinidevelopment.com/community/kwasen-village

https://kwasenvillage.com 

The Kwasen Village & BCIT area is becoming a new intersection of housing & shopping, as well as education. So, hopefully starting in 2027, there will be an express bus from Metrotown_to_West-Vancouver. It will run along Willingdon Avenue providing a rapid bus link between Metrotown and Brentwood-Town-Centre-Station. Then onto N.Vancouver & W.Vancouver. This is being done, because backwards Vancouver refuses to build a rapid bus tunnel under or near the absurd, 3 lane Lions_Gate Bridge. Plus, the BC Government isn't interested in extending the SkyTrain on a bridge or through a tunnel to W.Vancouver. Thus, the inept, 3 lane Lions-Gate-Bridge remains as one of the worst bottlenecks or chokepoints in the world. 

Perth, WA built a 10 lane bridge with double train tracks in the middle of it.

Seattle, WA did something similar, but their 3 section bridge or crossing has 4 lanes each way & a double track middle section.

Montreal also did something similar to Seattle & Perth.

Being from backwards Vancouver & backwater BC, it's always amazing to see what other places can do, simply because they aren't in BC.

Fortunately, Perth, Seattle & Montreal don't have to contend with anything like the inept Vancouver & BC transportation mentality. It's mindboggeling that in 2025, Vancouver is still only running 4 car trains to Surrey & only 2 car trains to Coquitlam & Richmond. This, combined with several narrow bridges, makes it one of the most congested cities in the world. It's a sad & pathetic situation, because things in BC should be designed for proper future capacity expansion.


Friday, November 1, 2024

Vancouver's narrow bridges over the Fraser River

 https://dailyhive.com/vancouver/vancouver-knight-street-video-concern

The Knight_Street_Bridge (KSB) was deliberately designed to not have a couple of emergency lanes. No truck lanes and especially no bus and HOV lanes. No proper bike lanes, just 2 narrow sidewalks. 

https://en.wikipedia.org/wiki/Knight_Street_Bridge#Infrastructure

Thus, the Knight_Street_Bridge is one of the best examples of BC bottleneck planning.

https://images.drivebc.ca/bchighwaycam/pub/html/www/695.html

The Knight_Street_Bridge is so narrow and inept, that a new HOV, bus and bike bridge should be built right next to it. The Knight+Street+Bridge is only 4 lanes wide in the middle, so a parallel 4 lane bridge would greatly improve things. One lane on and one lane off between the twin bridge crossing and Marine-Drive. Then the main 3 lanes each way onto the 6 lanes of Knight+Street up to Kingsway. 


The incredibly narrow Fraser_Street_Bridge (FSB) was torn down and should have been rebuilt or replaced by the 1970s, especially by the 1990s. The city and the Provincial_government didn't seem to understand that a new bridge there would be great as a HOV, bus and bike bridge. A couple of wide emergency lanes would have made it a lot easier for emergency vehicles to go between Vancouver & Richmond.


Despite Oak Street being 6 lanes wide, the BC bottleneck mentality wanted to force everything into a 4 lane Oak_Street_Bridge (OSB). Even if there was no concept to have bus lanes in the late 1950s, the OSB should have had 6 lanes, plus 2 wide emergency lanes and 2 wide sidewalks.

https://en.wikipedia.org/wiki/Oak_Street_Bridge#Infrastructure

By now, there should have been a HOV, bus & bike bridge built next to the narrow & inept Oak_Street_Bridge


The Arthur-Laing-Bridge (ALB) is only 2 lanes each way. https://en.wikipedia.org/wiki/Arthur_Laing_Bridge


The multigenerational inept Vancouver & BC planning agenda is all about creating more congestion. 

Fortunately, the 8 lane Champlain+Bridge also has 2 passenger train tracks. This was possible, because Montreal and Quebec don't have anything like the Vancouver & BC mentality to hinder them.

Why have a provision for 10 car SkyTrains, when a 2-4 car joke of a train can enable more congestion? That's the backward BC way.

It's amazing that the Montreal+Metro was designed to have 9 car trains, even back in the 1960s. Montreal and Quebec in general, just don't have anything like a backwater BC mentally to contend with. Quebec isn't just able to do more because it has more people than BC, Quebec has been able to accomplish more because it isn't BC.

https://vancouver.ca/streets-transportation/bridges-and-structures.aspx

Despite being a newer crossing, the Arthur+Laing+Bridge was only designed to have 4 lanes, just like the older Oak+Street+Bridge. Both bridges should have been built with very wide shoulders, so that they eventually could have provided 6 lanes. Plus, both bridges should have had very wide sidewalks. However, that goes against the chokepoint planning mentality.

Saturday, June 18, 2022

The Iron Bridge and the old Champlain Bridge

https://en.wikipedia.org/wiki/Ironworkers_Memorial_Second_Narrows_Crossing 

https://en.wikipedia.org/wiki/Champlain_Bridge_(Montreal,_1962-2019) Both became classic 6 lane bottlenecks or chokepoints. That's because more than 6 lanes of traffic connected to such bridges.

https://en.wikipedia.org/wiki/Samuel-De_Champlain_Bridge An 8 lane bridge with 2 REM tracks. While I would like it to have been 10 or 12 lanes with 4 tracks, its still so much better than what backwards Vancouver would allow. 8 lanes plus 2 HOV lanes & 2 bus lanes, because the REM train isn't running 24 hours.

The+Lion+Bridge+and+The+Iron+Bridge are just too inadequate to be modern transportation crossings.

The inept Lion_Bridge should have had bus & train tunnels built next to it decades ago.

https://en.wikipedia.org/wiki/Lions_Gate_Bridge An 8 lane road tunnel could allow the Lions-Gate-Bridge to become a foot & bike crossing, but that's what a proper big city would do.


https://pbs.twimg.com/media/FVfdglQUAAEiQZV?format=jpg&name=large Vancouver Stumps vs. Towers.

https://dailyhive.com/vancouver/vancouvers-shrinking-skyline Holding Vancouver back is what you do when you symbolically don't want to acomodate growth. Whit so much scaled back infrastructure, who knows where the money went?


https://jfdatalinks.blogspot.com/search?q=Iron+Bridge  

https://jfdatalinks.blogspot.com/search?q=Lion+Bridge

Saturday, July 26, 2025

Metro Vancouver Regional District delays review of North Shore wastewater treatment plant project until legal battle resolved

 https://dailyhive.com/vancouver/north-shore-wastewater-treatment-plant-project-review-delayed

So much money has been wasted that could have otherwise have gone towards a train & bus bridge or a tunnel across the inlet. 

The+Ironworkers-Bridge will still have to be upgraded or rebuilt and it should be on the scale of the New Samuel-De_Champlain_Bridge. The New_Champlain_Bridge_in Montreal has 4 lanes each way, plus 2 train tracks. More things are possible in Montreal and Quebec, simply because they don't have anything like Vancouver's restrictions & the backwards BC B$ mentality to thwart them.

https://www.samueldechamplainbridge.ca/traffic-and-detours/

https://www.samueldechamplainbridge.ca/pedestrians-and-cyclists/

https://www.arup.com/projects/samuel-de-champlain-bridge-corridor/