The Mount Royal Tunnel in Montreal

 https://en.wikipedia.org/wiki/Mount_Royal_Tunnel

https://en.wikipedia.org/wiki/Mount_Royal_Tunnel#REM

https://rem.info/en/news/first-passage-rem-through-mount-royal-tunnel-and-start-dynamic-testing-area

https://www.montrealgazette.com/news/article144286.html

Even the REM train stations should be expandable to eventually accomodate 6-8 car trains.


The Dunsmuir_Tunnel was rebuilt to become a double deck tunnel providing a split_platform station configuration. https://en.wikipedia.org/wiki/Split_platform#North_America

Unfortunatly, the Burrard_station & Granville_station platforms were only built to be 80m, when they should have been 155m-160m. This would have helped to eventually have 9 car SkyTrains, just like 9 car Montreal Metro trains. 

With proper long-range planning in mind, the SkyTrain should have been planned to eventually be a double length LRT system. Instead, its been challenging enough just to establish 5 car trains on the first 2 lines.

Unfortunatly, the 3rd line or Canada_Line was built to only have 50m, whereas the Montreal Metro has 152.5m long stations.