Showing posts sorted by relevance for query $HIT-BOX. Sort by date Show all posts
Showing posts sorted by relevance for query $HIT-BOX. Sort by date Show all posts

Friday, February 28, 2025

Former B.C. deputy finance minister to lead audit of North Shore sewage plant

 https://www.burnabynow.com/highlights/former-bc-deputy-finance-minister-to-lead-audit-of-north-shore-sewage-plant-10304011

While a Burnaby to North Vancouver express bus and rail link is a good idea, there should also be a link between Vancouver and West Vancouver. Unfortunatly, so much extra money will be going toward a shit-pipe and a shit-box, instead of a rail tunnel & a new bridge. So many people are still in denial, but urban planning & funding in BC is really the $HIT$ for Greater Vancouver.

https://www.burnabynow.com/economy-law-politics/fractures-deepen-as-metro-vancouver-faces-governance-review-10305334

So much money was wasted on a $HIT-BOX and a $HIT-PIPE that could have gone towards a train tunnel near the LGB.

https://www.ctvnews.ca/vancouver/vancouver-island/article/metro-vancouver-should-not-be-a-gravy-train-bc-asked-to-partner-in-regional-governance-review


https://jfdatalinks.blogspot.com/search?q=$HIT-PIPE

https://jfdatalinks.blogspot.com/search?q=SHIT-BOX

Wednesday, October 22, 2025

'Insufficient evidence' to conclude city building inspectors taking bribes in Vancouver

 https://www.biv.com/news/entertainment-media-sports/vpd-insufficient-evidence-to-conclude-city-building-inspectors-taking-bribes-vancouver-11383302 

Allegations remain as allegations. 

However, in an unrelated matter, there was a case of total $HIT-BOX mismanagement and excrement.  Billions of dollars wasted in a $HIT-PIPE DREAM. https://www.cbc.ca/news/canada/british-columbia/metro-vancouver-board-votes-to-pause-nswwtp-review-until-legal-dispute-settled-1.7594512 

https://www.nsnews.com/local-news/metro-vancouver-halts-view-into-wastewater-plant-boondoggle-10994469

Then there is the case as to why the Canada+Line+is+so+under-built. Apparently, as a rushed and inept cost saving measure, the Canada+Line wouldn't have 152.4m long stations like the Montreal Metro or even the Edmonton LRT stations, which range from 125m to 130m. Despite its 2 billion dollar cost the Canada-Line wasn't designed with that much future capacity in mind. The ridiculously short 50m stations should have been roughed out or level for at least 100m, if not even 160m. That would have allowed for future 5-8 car trains. 

Ultimately, as a long-term, high capacity link between YVR and the 2 main ferry terminals, the stations should have had a 200m level clearance. That would have allowed for ten, 20m car trains. Unfortunatly, no provision for a 10 car train, not even a 5 car train, just an absurd 2.5 car short train, someday. 

$HIT-BOX mismanagement and opting for short trains is such careless urban infrastructure planning. 

https://www.nsnews.com/local-news/metro-vancouvers-pledge-for-reforms-insufficient-district-of-north-van-councillor-says-10716480

https://www.biv.com/news/economy-law-politics/metro-vancouver-slashes-sewage-plant-cost-by-39b-but-risks-long-term-bill-11303969

The BC Mind Virus is such a horrible thing, but it officially doesn't exist. Yet, the crappy approach to things endures.

Friday, September 19, 2025

The Best fix for North Shore traffic is to upgrade or replace both bridges

 https://www.nsnews.com/opinion/letter-best-fix-for-north-shore-traffic-is-to-upgrade-or-replace-both-bridges-11233455 

When there is a refusal to build bigger and better bridges, there still should be a regional network of bus and train bridges. However, the gridloc planning agenda keeps winning out.

Unfortunatly, after decades of inept transportation planning and then so much money wasted down a $HIT-PIPE, the North Shore keeps getting hit hard from the $HIT-BOX planning mentality. 

The Tilikum+Crossing in Portland is a fantastic example of modern infrastructure planning and development. It allows for the MAX-LRT, the streetcar, the bus, bikes and pedestrians to conveniently get across. The nice thing about the TC is that no lanes had to be removed or repurposed on the other Portland bridges. Perhaps that's why something like the TC isn't allowed in BC, because it could actually help to improve transportation efficiency. 

The Washington+Avenue+Bridge is another example of what's not allowed in Greater Vancouver or anywhere else in the BC part of Canada. After all this time, Greater Vancouver is still so lacking in a regional network of transit+bridges


https://jfdatalinks.blogspot.com/search?q=transit+bridges  

Tuesday, August 12, 2025

Community groups want a public inquiry into North Shore sewage plant debacle

 https://globalnews.ca/news/11332030/north-shore-wastewater-public-inquiry 

A cost overrun of at least 3 billion dollars for a $HIT-BOX and a $HIT-PIPE is outrageous! https://jfdatalinks.blogspot.com/search?q=North+Shore

This SHIT-BOX mentality must be challenged and stopped.

The Lion Bridge and The Iron Bridge

https://jfdatalinks.blogspot.com/search?q=Lion+Bridge As of 2025, still no official plan for a train tunnel and a bus & HOV tunnel. A 3-4 track train tunnel and a 6-8 lane road tunnel would actually improve that absurd 3 lane crossing area.  

https://jfdatalinks.blogspot.com/search?q=Iron+Bridge As of 2025, still no official construction plan to add a 4 lane bus & HOV bridge, plus a 3-4 track rapid transit train bridge. 

Why a 3-4 track train tunnel or bridge? Someday, enough sensible people might realize the benefit and importance of having a train linking the Horseshoe+Bay+ferry+terminal to YVR and to the Tsawwassen+ferry+terminal

Unfortunatly, when so much money was wasted on a $HIT-PIPE and a $HIT-BOX, more money was lost that could have gone towards improving transit to & from the North Shore.


https://jfdatalinks.blogspot.com/search?q=The+Lion+Bridge+and+The+Iron+Bridge 

https://jfdatalinks.blogspot.com/search?q=Lions+Gate+Bridge

Thursday, April 24, 2025

The Canada (embarrassment) Line

Using the limited funds and low capacity argument is excrement! It's only because of inept urban planning that the Canada+Line is such a transportation embarrassment & sad joke since 2009. Several other cities around the world are able to think big, they plan & build in a long-term way. Thus, if there are only enough funds to build a 2.5 car train, the stations could have been designed to eventually accomodate 5 car trains as demand increases. Plus, all the stations should have been designed with enough clearance to gradually be long enough for 10 car trains.

https://www.translink.ca/-/media/translink/documents/plans-and-projects/regional-transportation-strategy/transport-2050/backgrounders/transport_2050_backgrounder_action_2_rapid_transit_network.pdf

An ultimate capacity of 10 car trains connecting both ferry terminals with the airport & downtown Vancouver, would really have been properly planning for the future. 10 car trains running every 2 minutes during the busiest times of the day would efficiently allow a lot people to get around. Unfortunatly, it will be challenging enough just to eventually have 5 car trains.

https://dailyhive.com/vancouver/canada-line-skytrain

The absurdity to design the stations to only handle 2.5 car trains is a sad joke. The ultimate capacity of two 20m cars with a 10m filler car is so inadequate & pathetic, but this is the BC part of Canada. This backwards & backwater thinking must be challenged. 

https://dailyhive.com/vancouver/skytrain-future-station-locations

With some modifications, three 20m cars could form a 60m train, despite the absurd platforms only having a clearance for 50m. A 60m walkthrough train makes this possible, its just that the doors at either end wouldn't reach the short station platform. Selective_door_operation could enable the Canada Line to go from a 2 car & 2.5 car joke, to a 3 car & ultimately, a 5 car train. That's still a far cry from cities with 10 car trains running every 2 minutes. However, a 5 car train running every minute could make all the difference for Greater Vancouver.

https://www.cbc.ca/news/canada/british-columbia/what-you-need-to-know-north-shore-wastewater-treatment-plant-1.7235368# Aparently, there is enough money to overpay for a $HIT-PIPE and a $HIT-BOX, but not enough funds to build a proper high capacity train over a couple of decades.  

The Canada_Line opened in 2009 with its short 2 car trains & in 2025, there still aren't any 2.5 car trains. By now, it really should have been running 5 car trains, connecting the 2 ferry terminals & the airport. Fortunately, most real cities are able to do proper long range planning for their infrastructure, unlike backwards Vancouver.

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)_rolling_stock#Canada_Line_fleet 

Any serious airport+train should be envisioned as more than just a 2 car joke. While a 3 car train might be a little better, a 4 car train should be the minimum. Then, having the stations already long enough to accomodate 6 car trains, with enough clearance for eventually 8-10 car trains. A 2 car joke of a train is almost as bad as the 3 lane Lion Bridge. 

There should have been enough informed people to not only make sure that the C+Line was properly designed, but that the whole Greater Vancouver Region had proper planning measures for future transportation infrastructure capacity. Unfortunatly, backwards BC has been under a multi-generational backwater agenda. 


https://jfdatalinks.blogspot.com/search?q=Canada+Line 

https://jfdatalinks.blogspot.com/search?q=airport+line

Wednesday, June 19, 2024

Surfing At $HIT-PIPE

 https://mpora.com/surfing/fancy-surfing-SHIT-PIPE-yep-real-place

https://www.surf-forecast.com/breaks/Shit-Pipe

https://www.boardriding.com/spots/shit-pipe

https://www.surfline.com/surf-report/shitpipe/5842041f4e65fad6a7708900?view=table

In the Vancouver and BC context, its as if there is some kind of a Mind Virus that turns things into a $HIT-BOX boondoggle. Its like cities in backwards BC are affected by some kind of a PIPE-DREAM mentality. 

Monday, December 15, 2025

Metro Vancouver leadership chaos

 https://globalnews.ca/video/11579521/metro-vancouver-leadership-chaos 

This has been such an inept and mismaged organization for several decades. Too many short trains and mostly narrow bridges, but always enough money to put into another $HIT box project. 

https://en.wikipedia.org/wiki/Metro_Vancouver_Regional_District

Sunday, August 10, 2025

BC Conservatives support third North Shore crossing to ease 'endless traffic gridlock'

https://www.westernstandard.news/news/exclusive-bc-conservatives-support-third-north-shore-crossing-to-ease-endless-traffic-gridlock/66766 This shouldn't just be a BC Con. issue, because this has been neglected for several decades.


While the North Shore $HIT BOX fiasco is relatively new, generations have come & gone without sufficient funds going towards proper big city infrastructure. Who knows where all the money went? 

If only there was a proper oversight committee to make sure that Greater Vancouver was putting enough funds towards proper urban infrastructure.

Friday, May 23, 2025

Metro Vancouver Regional District to pursue major governance reforms

 https://dailyhive.com/vancouver/metro-vancouver-regional-district-governance-reform-deloitte-report

Why put an adequate amount of funds towards the regional transportation infrastructure, when it can be wasted on other things? That's what inept regional planning is suppose to do. Fortunately, most urban areas around the world try to avoid such a foolish approach.

https://www.ctvnews.ca/vancouver/article/metro-vancouvers-damning-deloitte-report-prompts-differing-opinions/

There should be a 40-60 year audit to determine why Metro Vancouver doesn't have long, high capacity trains that real proper cities have.

https://globalnews.ca/news/11194788/metro-vancouver-board-changes-report/

There would also have to be an audit of the mismanagement over the past several decades to determine why Metro Vancouver doesn't have a regional network of bus & HOV bridges.

https://vancouver.citynews.ca/2025/05/23/metro-vancouver-slashes-some-pay-perks-boosts-oversight-after-scathing-report/

https://vancouversun.com/news/metro-vancouver-vows-change-consultants-report

https://www.nsnews.com/opinion/editorial-metro-vancouver-is-more-than-the-wastewater-boondoggle-10176971 So much extra money went towards a shit-box & a shit-pipe, that should have gone towards an express bus & high capacity train tunnel between Vancouver & Park Royal & the ferry terminal.

https://vancouversun.com/news/local-news/consultant-releases-damning-report-on-metro-vancouver-governance This is shit-box planning & funding at its best. Apparently, all this regional B$ was to just keep going on until enough people started to realize that something is wrong in Vancouver & BC.


https://jfdatalinks.blogspot.com/search?q=SHIT-BOX 

https://jfdatalinks.blogspot.com/search?q=$HIT-PIPE

Thursday, September 11, 2025

Metro Vancouver taxpayers left in the dark over ballooning sewage plant costs

 https://www.nsnews.com/economy-law-politics/kirk-lapointe-metro-vancouver-taxpayers-left-in-the-dark-over-ballooning-sewage-plant-costs-11198245

It's sad and unfortunate that so much money was diverted and wasted on an over-budget $HIT-box. Yet, no bus bridges or bus tunnels have been built to the North Shore, so far.  At least one of the SkyTrain lines should have been extended to the North Shore at least a dozen years ago. 


https://jfdatalinks.blogspot.com/search?q=North+Shore