Showing posts sorted by relevance for query Oakridge. Sort by date Show all posts
Showing posts sorted by relevance for query Oakridge. Sort by date Show all posts

Thursday, November 14, 2024

The Oakridge-41st Avenue Stations' expansion

 https://dailyhive.com/vancouver/skytrain-oakridge-41st-avenue-station-upgrade-design-renderings

Despite the absurd cost-cutting measures, the Canada+Line still could have been designed & built to eventually have 152m long stations, like the Montreal Metro. However, Vancouver & BC are all about inadequate or congestive infrastructure. Planning for a future high capacity train line goes against the backward BC mentality. Thus, all of the underground train stations are shorter than those in Edmonton, Seattle, Toronto & Montreal. Having proper big city long stations isn't a problem for real cities, but Vancouver wants to be more like a false front or a movie set.  

https://thecanadaline.com/station-guides/oakridge-41st

LA & SF have their versions of a C-Train or an Edmonton LRT, but they also have proper big city size subway stations & trains. 

The entire SkyTrain-and-Canada+Line should have been built with a provision to eventually have 172m long stations, or at least 152m. While the elevated stations could somewhat be lengthened, it's much more difficult & costly for the underground stations. Had they already been roughed out, it would have just been a matter of eventually completing them.

https://www.google.com/maps/place/Oakridge-41st+Avenue The edge of the ridiculousley short train platform. This joke of a train really should have been designed to eventually accomodate 8-10 car trains. However, that would go against the multi-generational, KEEP THINGS SMALL OR BACKWARDS IN BC mentality. Apparently, even having 4-6 car trains would be too symbolic of recognizing urban transportation growth in backwater BC. Thus, a 2 car joke of a train, which can eventually become a 2.5 car train, was decided to be enough. 

https://www.google.com/maps/place/Oakridge-41st+Avenue At least some of the absurdly short underground stations are level enough to potentially be doubled in length, but not tripled.

https://www.google.com/maps/place/Oakridge-41st+Avenue

https://www.google.com/maps/place/Oakridge-41st+Avenue/@49.2331553,-123.1166421,3a,75y,90t/data=!3m8!1e2!3m6!1sAF1QipMuAMM_RIhGU-EzA2NoKi0MFrPUeEkXwmbMg49z!2e10!3e12!6shttps:%2F%2Flh5.googleusercontent.com%2Fp%2FAF1QipMuAMM_RIhGU-EzA2NoKi0MFrPUeEkXwmbMg49z%3Dw203-h152-k-no!7i3899!8i2924!4m16!1m8!3m7!1s0x548673f143a94fb3:0xbb9196ea9b81f38b!2sVancouver,+BC!3b1!8m2!3d49.2827291!4d-123.1207375!16zL20vMDgwaDI!3m6!1s0x54867470d349b63b:0xabce161967e00006!8m2!3d49.2331553!4d-123.1166421!10e5!16zL20vMGN0d2do!5m1!1e2?entry=ttu&g_ep=EgoyMDI0MTEyNC4xIKXMDSoASAFQAw%3D%3D

Thursday, October 9, 2025

Oakridge Park mall in Vancouver

 https://dailyhive.com/vancouver/vancouver-oakridge-park-mall-opening While shopping online can be a great convience, going to a mall can still be a nice tactile experience. Had the horrible Covid shutdown gone on for another year, people would have been more conditioned to order things online and perhaps even have to ask AI for permission to go out anywhere. 

Despite feeble attempts to the moon and Mars, most of humanity is confined to the Earth. That doesn't mean that the planet should ever become an AI run prison. However, things like a World Carbon Credit Score, a Personal Compliance Score and having to seek permission from AI to go anywhere, would be the epitome of a Sci-Fi dystopian story being imposed upon the MA$$E$.  

Thus, the shopping mall and public transit should always remain as safe, open places. Eventually, mall security and transit police might be augmented with robots and AI drones.  

Fortunately, the new and improved Oakridge wont be like anything out of a dystopian Sci-Fi story. 

Its so creepy how the Canada Embasesment Line was designed to only have 2 car trains, with no easy expansion ability to have 4-8 car trains. Indeed, to design a 2 billion dollar line without the capability to at least have 5 car trains is a very sad joke. The stations are only designed to eventually accomodate a 2.5 car train as if to symbolise the reluctance to ever connect YVR to both ferry terminals. 

https://en.wikipedia.org/wiki/Oakridge-41st_Avenue_station

https://www.translink.ca/news/2025/may/oakridge%20canada%20line%20station%20to%20close%20early


Wednesday, April 23, 2025

Oakridge Park mall free parking and train station

 https://dailyhive.com/vancouver/oakridge-park-mall-free-parking-vancouver

https://en.wikipedia.org/wiki/Oakridge-41st_Avenue_station

https://upload.wikimedia.org/wikipedia/commons/1/18/Oakridge%E2%80%9341st_Avenue_station_Platform_2018.jpg Its almost painful to see how small these stations are. The Montreal Metro stations are 152.5m or 500 feet long & can accommodate a 9 car train. All of the underground stations of the Canada (embarrassment) Line are only 50m. Anyone in engineering or construction knows, that if designed properly, a structure can eventually be lengthened or widened.

Therefore, all the stations should have been doubled in length by now to be 100m. Then in another decade the stations should have become 160m & in another decade, 200m. Unfortunatly, the Canada Line was only designed to ultimately accomodate a 2.5 car train, not 8-10 car trains.

As of 2025, the 2009 Canada Line operators are still only running a 2 car joke of a train.


https://jfdatalinks.blogspot.com/search?q=Oakridge

Thursday, January 15, 2026

Early nightly closures at Oakridge-41st Avenue SkyTrain station for construction extended by two months

 https://dailyhive.com/vancouver/oakridge-41st-avenue-skytrain-station-early-closure-2026 

While some improvements are possible with the very short Canada+Line stations, there was a lack of vision to allow for enough level clearance to be able to double the length of the stations.

https://dailyhive.com/vancouver/skytrain-oakridge-41st-avenue-station-upgrade-design-renderings 

Indeed, the stations should have been at least 100m long, but only can be 50m. So instead of eventually having 5 car trains, only 2.5 car trains will be the maximum. WTH? 


https://jfdatalinks.blogspot.com/search?q=YVR-Canada+Line

Thursday, October 9, 2025

Oakridge–41st Avenue station

 https://en.wikipedia.org/wiki/Oakridge-41st_Avenue_station 

It's so sad that the Canada (Embarrassment) Line stations are only an absurd 50 m, when the Montreal_Metro stations are 152.5 m or 500 feet long. A 2 car Vancouver-Richmond train just can't match the capacity of a 9 car Montreal Metro train.

https://en.wikipedia.org/wiki/Canada_Line#Stations "The five busiest stations have platforms 50 metres (160 ft) long, while the rest of the stations have 40-metre (130 ft) platforms that can be easily extended to 50 metres." 

https://en.wikipedia.org/wiki/Canada_Line#Canada_Line_Hyundai_Rotem_specifications "Train length: 41 m (134 ft 6 in)"  

https://en.wikipedia.org/wiki/Montreal_Metro#Station_design "Platforms, 152.4 metres (500 ft) long and at least 3.8 metres (12 ft) wide..."

The Canada_Line is a total backwards BC embassesment. The argument for such short stations and trains was to save money. However, all the stations could have still been designed to be level long enough to eventually be extended to 160 m. That would be able to accomodate an 8 car train of 525 feet. 

Unfortunatly, in accordance with backwards Vancouver transportation planning, the Canada (Embarrassment) Line stations are https://en.wikipedia.org/wiki/Central_station_(Edmonton)

The multigenerational backwards BC thinking always gets in the way. An initial 2 billion dollar train line should have ultimately been designed to have 10 car trains. This line should have eventually linked YVR to both ferry terminals, but that would actually be efficient long-range transportation planning. 

Tuesday, February 16, 2016

Brentwood and Oakridge Centre

B is a bustling area in Burnaby.



O is a secondary commercial, retail & residential hub in Vancouver.