The 3 Lane Bridge

 A 3 lane bridge, viaduct or tunnel can be great if its for one direction. However, if it's for 2 way traffic, it can easily get very congested, unless its in a rural area.

The Johnson_Street_Bridge in Victoria, BC & the Lions_Gate_Bridge in Vancouver, are quintessential 3 BC lane bottlenecks. How is this possible? Make sure that a bus & HOV tunnel or bridge isn't built next to them. Especially make sure that a heavy rail or a light rail tunnel or bridge isn't built close to them. Thus, both crossings are fine examples of BC congestive planning. It's also crucially symbolic, as BC has been refusing to keep up with urban transportation needs. Thinking big & building big in Texas is no problem, because it's so far away from the backwater BC planning mentality. However, even Alberta & Washington State never seemed interested in taking a backward BC approach to things as well.

If you are from Montreal & haven't visited Vancouver or Victoria, nothing can prepare you for the shock, if you ever do. As preparation, it might be good to drive over to Jacques+Bizard+Blvd and then over the 3 lane Jacques_Bizard_Bridge. Of course this is in a backwater part of Montreal. However, imagine if this 3 lane bottleneck was at one of the main crossings in Montreal. Well, that's what you would have to prepare yourself for, if you visit Vancouver or Victoria. Whether its a low level bridge or a high level bridge, as long as it's a 3 lane chokepoint, it meets the BC standard. Fortunately, Montreal was able to build a new bridge there, simpy because it doesn't have a Vancouver like mentality. https://montreal.ca/en/articles/building-new-bridge-pont-jacques-bizard-26379

The Windsor+Bridge is a backwater, 3 lane Sydney crossing. Just imagine if that was on the edge of the CBD. Well, if you are from NSW & you visit backwards BC, nothing can prepare you for such narrow bridges, short trains & stumpy buildings. Fortunately, nothing like the BC mentality was ever allowed to take over NSW.

If you are from New_Haven,_Connecticut, you might be shocked if you visit the 2 largest urban areas in the BC part of Canada.

https://www.google.com/maps/place/New+Haven,+CT,+USA/@41.3012189,-72.9233923,83m/data=!3m1!1e3!4m6!3m5!1s0x89e7d8443a8070e5:0xf6a354c659b264ed!8m2!3d41.308274!4d-72.9278835!16zL20vMGYybmY?entry=ttu 3L next to 8L.


https://www.google.com/maps/place/Ted+Smout+Memorial+Bridge,+Brisbane,+Australia

"The bridge features

  • 3 traffic lanes (originally 2 for regular traffic and a T2 (bus, taxi and vehicles with more than 2 occupants) lane, but the T2 lane has now been converted to a regular lane).
  • A 4.5 m (15 ft) wide pedestrian and cycle path that connects footpath and cycle networks on either side of Bramble Bay. The path is separated from traffic by a concrete barrier." https://en.wikipedia.org/wiki/Ted_Smout_Memorial_Bridge Of course after duplication, it became a 6 lane crossing.

Saturday, April 19, 2025

The narrow bridges of Vancouver, Canada

https://montecristomagazine.com/community/forgotten-bridges-vancouver

The LGB just wasn't designed with any future capacity in mind. 

History of the Lions Gate Bridge https://www.youtube.com/watch?v=JHqi7Kijedw 

https://en.wikipedia.org/wiki/Lions_Gate_Bridge#History

https://upload.wikimedia.org/wikipedia/commons/7/7e/Lions_Gate.jpg 

The inadequate 3 lane LGB is currently the most narrow road bridge in backwards & stubborn Vancouver. It's been in that category since the removal of the 2 lane Fraser Street Bridge in the 1970s. There was a refusal to twin the absurdly narrow LGB between the 1950s & 1970s. By the 1980s there should have been a subway tunnel and an 8 lane tunnel. Then two of the lanes could have been for buses. Georgia+Street is 7 lanes wide as it gets closer to Stanley Park. Thus, the main part of a tunnel through the park could have provided 3 general lanes each way & a bus lane each way. Instead, the 7 lanes of the westernmost part of Georgia Street are funneled into a 3 lane causeway & a 3 lane bridge. The LGB would be fantastic as just a bike & foot crossing, with train, bus & road tunnels well beneath & beside it.    

The Burrard_Bridge, BB or  BSB opened with 6 lanes, but now it only has 4 lanes. There are 2 bike lanes & 2 sidewalks. Had a parallel bike-bridge been built, the BB could have still had 6 lanes. While the BB has a lower level provision for streetcars or tram-trains, Vancouver did its damndest to phase out streetcars well before the 1960s. 

The Ironworkers_Memorial_Bridge has 6 lanes, but should also have had 2 wide shoulders & 2 very wide sidewalks. Unfortunatly, there was no provision for a lower deck, as is also the case with all of the other Vancouver  bridges. https://en.wikipedia.org/wiki/Ironworkers_Memorial_Second_Narrows_Crossing

Any replacement of the inadequate Ironworkers+Memorial+Bridge should be on the scale of what Perth, Seattle and Montreal have done.

https://en.wikipedia.org/wiki/Granville_Street_Bridge#Third_bridge_(1954)

https://www.youtube.com/watch?app=desktop&v=vPSdF0jRTC4 The Granville-Bridge or GSB is the widest bridge in the city limits. It opened with 8 lanes, but is being transformed into a 6 lane bridge with 2 bike lanes & 2 sidewalks. Had there been a paralel bike & foot bride, the GSB could have still been 8 lanes wide. Then there could have been 2 exclusive bus lanes.

https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx

The Oak Street Bridge should have been 8 lanes wide, with 2 wide sidewalks.

The Knight+Street+Bridge should have been 8 lanes with 2 wide sidewalks. Instead, its a 4 lane chokepoint.

The Arthur+Laing+Bridge should have been at least 6 lanes with 2 proper bike lanes & 2 sidewalks.

If the Cambie_Street_Bridge had 2 very wide sidewalks, then its likely that it would still have 6 lanes instead of 5. https://en.wikipedia.org/wiki/Cambie_Bridge#The_present_bridge

Unfortunatly, bottleneck or chokepoint planning is part of the Vancouver & BC mentality.

Of course BC & the Metro+Vancouver Region just hasn't put enough funds and effort towards proper big-city planning & infrastructure development. 

If Perth+and+Seattle had to conform to the extremely restrictive Vancouver approach to things, those cities would be in a perpetual state of chaos. Fortunately, nothing like the BC Mind Virus has ever reached WA.


https://jfdatalinks.blogspot.com/search?q=Oak+Street+and+Granville+Street

Tuesday, May 28, 2024

Five of Ontario's top 10 worst roads are located in the Greater Toronto Area

 https://toronto.ctvnews.ca/five-of-ontario-s-top-10-worst-roads-are-located-in-the-toronto-area-1.6903196 Of course its a good idea to make sure that the roads & streets are as smooth as possible.

The Greater_Toronto_Area is gradually becoming a vast urban region like the Chicago_metropolitan_area. So many more modes of transit must be provided for the GTA. IE, trains, HOV, bus & bike lanes. 

https://www.insauga.com/one-of-ontarios-worst-roads-is-among-the-busiest-streets-in-mississauga

Being from the BC Lower_Mainland, it's hard to believe that Canada's GTA is on its way to becoming like another Chicagoland. But then I always remember that Ontario, like Quebec & Alberta aren't under anything like the BC mentality & all of its restrictions.

https://www.cbc.ca/news/canada/hamilton/worst-roads-ontario-2024-1.7215979 

In effect, the Burlington_Bay_James_N._Allan_Skyway went from a BC like 4 lane bridge to an 8 lane Ontario crossing in the mid 1980s. https://en.wikipedia.org/wiki/Burlington_Bay_James_N._Allan_Skyway#1985_twin_bridge

https://511on.ca/map/Cctv/loc06--3
https://511on.ca/map/Cctv/loc06--3 Both bridges are safer than cramming everything into one crossing structure. 

https://burlingtontraffic.ca/qew-burlington-bay-james-n-allan-skyway The 4th lane each way could eventually become a bus & HOV_lane.

The 4 lane Burlington_Canal_Lift_Bridge is more like a narrow Vancouver bridge. Just 2 lanes each way with no space for an emergency lane or bus & HOV lane. That's why the Burlington_Bay_James_N._Allan_Skyway crossing is still better than any bridge within the Vancouver city limits. The skyway crossing combined with the lift bridge, provides 12 lanes, because the emergency lanes usually aren't counted. Just imagine if all that was funneled into a 4 lane Vancouver bridge. Fortunately, the backward BC bottleneck mentality has never taken over Ontario. 

While Oak Street in Vancouver has 6 lanes, the Oak_Street_Bridge was only designed to have 4 lanes. Thus, it's a fine example of the BC mentality and the multigenerational Vancouverization agenda. Vancouverization is all about watering things down & creating bottlenecks or chokepoints.

https://upload.wikimedia.org/wikipedia/commons/5/5f/Oak_Street_Bridge.jpg
https://wikimedia.org/Oak_Street_Bridge.jpg

The narrow 4 lane bridge should have been designed with a provision to eventually be at least 8 lanes wide. 3 lanes each way, plus a bus & HOV lane each way, but that would conflict with the narrow mindedness of Vancouver. It's sad that at least a bus & bike bridge wasn't built next to it, but that would conflict with the BC bottleneck planning approach to things.

https://upload.wikimedia.org/wikipedia/commons/5/53/Oak_Street_Bridge_and_Fraser_River%2C_Vancouver_-_panoramio.jpg
https://wikimedia.org/Oak_Street_Bridge_and_Fraser_River.jpg

https://images.drivebc.ca/bchighwaycam/pub/html/www/70.html A 6 lane street funneled into a 4 lane bridge. WTH?

The Oak_Street_Bridge really should have been opened as a 10 lane bridge. Yet, Oak_Street has only 6 lanes. A 10 lane OSB could have not only allowed for 3 lanes each way, but a bus & HOV_lane each way. Then the 5th lane each way could have been an emergency lane

https://www2.gov.bc.ca/gov/content/transportation/driving-and-cycling/traveller-information/routes-and-driving-conditions/hov-lanes

At the very least, a HOV, bus & bike bridge should be built next to the OSB. However, the multi generational backward BC mentality just doesn't care.

The 4 lane joke that is the George_Massey_Tunnel, should have had a HOV, bus & bike bridge built next to it several decades ago. But that would have actually created better mobility & less congestion.

https://en.wikipedia.org/wiki/George_Massey_Tunnel#Replacement Of course just like with the old tunnel, the new tunnel won't have a provision for LRT & emergency lanes. Thus, a LRT bridge would eventually have to be built next to it. Apparently, having a train from the Tsawwassen_ferry_terminal to the airport still doesn't make sense. That's just the backward BC way.

If you are from Ontario, Quebec, Alberta, the Pacific NW, Australia or just about anywhere, the watered down BC infrastructure will surprise you.


https://jfdatalinks.blogspot.com/search?q=old+and+new+narrow+bridges 

https://jfdatalinks.blogspot.com/search?q=bus+and+bike+bridges

Monday, August 12, 2024

Several Vancouver narrow bridge issues

 https://dailyhive.com/vancouver/metro-vancouver-bridge-cyclist-wire-allegations

Someone might have been very angry with bike people and not with car, bus & truck people. The real problem is that so much of the older BC infrastructure just wasn't designed to be more of a multi-modal crossing. The+Lion+Bridge+and+The+Iron+Bridge have no rail rapid transit crossings to help them.

The Ironworkers-Bridge is so narrow for a highway bridge in that location & wasn't designed for substantial future capacity. When it was initially designed in the 1950s, there was no concept to have 2 bus lanes, 2 HOV lanes, 2 truck lanes & 2 emergency lanes for a port city. Plus, at least 2 general traffic lanes each way & a provision for 2 train tracks. Thus, the 6 lane bridge is so overwhelmed, because it just can't do the job of an 8-10 lane wide bridge. While the Iron Bridge has 2 improved bike+lanes, they are part of the sidewalks.  

The former 8 lane Granville+Street will have 6 lanes, while the  & Oak+Street only has 4 lanes. The inadequate Oak+Street+Bridge (OSB) should have opened with at least 8 lanes, instead of only 4. Plus, 2 wide emergency lanes & 2 wide sidewalks. There still should be a new southbound OS Bridge, but the city would be against it. A narrow 4 lane bridge just doesn't have the space & capacity for 2 express bus lanes, 2 HOV & 2 truck lanes. Apparently, it's better to just funnel everything into only 2 lanes each way.  

The OSB should be twinned or replace with something like the Samuel-De_Champlain_Bridge in Montreal. The largest city in Quebec is allowed to have a nice wide bridge & long metro trains, because Quebec isn't bound by anything like the backwards BC mentality. 

https://www.theglobeandmail.com/canada/article-montreals-new-44-billion-champlain-bridge-opens-to-traffic-for Fortunatly, the Vancouver mentality wasn't able to ever reach back to Montreal & prevent such a nice modern bridge from being built there. https://www.flatironcorp.com/project/champlain-bridge If you are from Montreal & have visited Vancouver, you will be surprise to see how much shorter an underground Vancouver train station is than what is allowed underground in Montreal, Toronto, Edmonton, Seattle, SF & LA...

https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx A bike & foot bridge should have been built next to it decades ago. Then the Granville Bridge could have 3 general lanes each way, plus a bus & HOV lane each way. Instead, if 2 bus & HOV lanes are designated, there will only be 2 general lanes each way in the downtown core.

The Burrard Bridge should have had a bike & foot bride next to it. Instead, it was reduced from a 6 lane crossing to a 4 lane bridge.

The very narrow Oak+Street+Bridge & the Knight Street Bridge, should have had bus+and+bike+bridges built next to them decades ago. 

Most bridges in Vancouver & the metropolitan region just weren't designed with that much future capacity in mind, especially for buses & HOV lanes. Thus, it's a travesty that by now, almost every crossing should have had bus & bike bridges built next to them. 

https://vancouver.ca/streets-transportation/walk-bike-and-transit.aspx Unfortunatly, provisions for bus & bike lanes just weren't the thing to do several decades ago in BC.  

A truck lane is just as important as a bus & HOV lane. That's because freight should be efficiently & easily be transported in any major urban region.

https://vancouver.ca/streets-transportation/trucks-commercial-and-oversize-vehicles.aspx

https://jfdatalinks.blogspot.com/search?q=Oak+Street+and+Granville+Street

https://jfdatalinks.blogspot.com/search?q=Iron+Bridge 

https://jfdatalinks.blogspot.com/search?q=Lion+Bridge

Friday, July 25, 2025

Who controls the 3 lane Lions Gate Bridge?

 https://www.cbc.ca/news/canada/british-columbia/who-controls-the-centre-lane-on-the-lions-gate-bridge-1.7589996

The LGB has to be the worst or at least one of the worst traffic bottlenecks & chokepoints on the planet. Over the course of the past several decades, there should have been a bus and HOV tunnel and then a train tunnel close to the alignment of the LGB. 

Seven lanes of Georgia+Street funneled into a 3 lane LGB is nuts! The LGB is already a nice bike bridge, with sidewalks, but it should also be a bus bridge. That would be possible if a proper big city tunnel was built. An eight-lane-tunnel would really help the LGB.

Of course in both cases, the Lion Bridge was never expanded, twinned or duplicated & the M Tunnel (H-99) wasn't replace with a 10 lane bridge. Unfortunatly, no serious consideration for rail rapid transit was considered for both crossings. It was as if the regional & BC governments just didn't think it was that important to have a train from the Horseshoe+Bay+ferry+terminal and the Park+Royal+Shopping+Centre to Vancouver-International-Airport. Just like not having a train from the Tsawwassen+ferry+terminal and Tsawwassen+Mills to the airport. 

Despite Richmond,_British_Columbia having YVR, its as if no one really considered that Richmond should be a major intermodal transportation hub. Proper Transportation Planning has always been lacking in backwards BC.

https://www.theprogress.com/news/province-receives-business-case-for-new-massey-crossing-1911335

https://www.highway99tunnel.ca While an 8 lane tunnel is a good start as the first phase, eventually there will have to be a train, bus & bike bridge (or tunnel) next to it.

https://www.highway99tunnel.ca/project-overview-frt Then the H-99 tunnel could be 3 lanes each way with the 4th as a HOV lane. A new parallel bridge (or tunnel) could then have 2 rapid bus lanes, as well as 2 wide sidewalks & 2 wide bike-lanes. Extra width could allow for eventually 2 tracks, 2 HOV lanes, in addition to the 2 bus lanes. That would enable the H-99 tunnel to ultimately have 4 general lanes each way in a later phase. Of course it would have been better to do things correct right from the start, but that goes against the backwards BC mentality.

Its so sad that there was never a proper big city vision to have an airport+train connect to both ferry terminals. 

Saturday, January 4, 2025

The O-Train Line 2 and 4 launch

"The lines will begin a five-day service on Jan. 6 (Monday through Friday) and will continue for a minimum of two weeks. Buses through routes B2 (formerly called Line 2 buses), 99 and 97 will run parallel seven days a week in case of any issues." https://ottawa.citynews.ca/2025/01/03/heres-what-to-know-before-o-train-line-2-and-4-launch

This makes a lot of sense & not just because Ottawa is far away from Vancouver & the backwards BC mentality. Trains & people can break down causing a disruption on the tracks. Plus, there is no urban rail or commuter rail line in Canada that's running 24hrs a day. This means that its a good idea to have an express bus route that closely follows each train line 24hrs a day.

Greater Vancouver seems to always be a sleep at the wheel, or just inept with proper urban planning. Once the public was informed that the Skytrain won't be a 24hr system. Therefore, it would be a good idea to have express busses running parallel to each line 24hrs a day. 

Unfortunatly, the backward BC planning mentality never allowed for the SkyBridge_linking_NW_and_Surrey_with_SkyTrain to have enough space for 2 bus-lanes, 2 bike-lanes & 2 footpaths. https://en.wikipedia.org/wiki/Skybridge_(TransLink) The bridge has none of that, as if to conform to a BC bottleneck agenda. 

The 4 lane Pattullo_Bridge and the 4 lane Queensborough_Bridge were never designed with wide sidewalks & 2 wide emergency lanes. For if they were, then a few decades ago both bridges could have provided 3 lanes each way & have adequate space for bike lanes. A 3rd lane each way would have been great for buses, but that might improve the congestion.

While the new Pattullo_Bridge will actually have wide sidewalks on each side, no serious consideration was given to having 2 bus-lanes, despite the Skytrain not being a 24hr system. So buses, trucks, ambulances & cars will all have to be funneled into only 2 lanes each way. Having 2 bus lanes & 2 wide emergency lanes would actually go against the BC bottleneck mentality.

Even considering budget limitations, the new Pattullo-Bridge should have been designed with a provision for a future lower deck & open with 3 lanes each way & have 2 wide emergency lanes. Apparently, having the Pattullo-Bridge-Replacement with only 2 lanes each way & no emergency lanes somehow will make it easier for emergency vehicles to cross. Of course its the opposite effect, but this is backwards BC.

SurreyDelta & all of Langley, already have as many people, if not even more people than Ottawa, but the infrastructure is so lacking in BC. Thus, a new 4 lane bridge will be an instant chokepoint between NW & SurreyDelta & Langley. A 10 lane bridge & a 10 car Skytrain is what a proper urban area of over 3 million people would plan for.  

While Vancouver has less people than Ottawa, the BC Lower_Mainland has more people than Calgary, Edmonton & Winnipeg, combined. Thus, its very strange that Vancouver & BC insist on a congestive planning approach.

The 4 lane Queensborough_Bridge in NW has enough space to accommodate a parallel 4 lane bridge. While some backwater BC types might freakout with an 8 lane crossing there, they don't realise that a 4 lane bridge is very limited. Thus, by having two 4 lane bridges, there could be a bus & a truck lane each way as well as 2 general lanes each way. Not having dedicated bus & truck lanes for what is supposed to be a major port is absurd, but its OK for backward BC. 

In backwards BC its desired to not have a rail transit component on any of the current road bridges. Indeed, most of the bridges are so narrow that there isn't enough room for either bus lanes or HOV lanes.

https://en.wikipedia.org/wiki/Queensborough_Bridge

https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge

Friday, April 19, 2024

The 4 Lane Bridge

https://en.wikipedia.org/wiki/University_Bridge_(Seattle) WA 

https://www.seattle.gov/transportation/projects-and-programs/programs/bridges-stairs-and-other-structures/bridges/university-bridge-planning-study

https://www.seattlebikeblog.com/2023/08/04/north-u-bridge-project-is-a-huge-opportunity-for-a-safer-and-better-connected-u-district-survey/

https://www.seattlepi.com/seattlenews/article/100-years-University-Bridge-UW-Seattle-ship-canal-14067372.php

https://www.historylink.org/File/20389

The 2 level, 12 lane Ship_Canal_Bridge is right next to it.

https://upload.wikimedia.org/wikipedia/commons/6/69/Ship_canal_bridge_and_downtown_skyline%2C_2000.jpg




The north end of the Montlake_Bridge is close to the University_of_Washington_station. The 380-foot-long (120 m) station_layout is almost as long as any underground LRT station in Edmonton. In contrast, the first 2 lines of the Vancouver Skytrain only have only 80 m stations. The 3rd line is a joke that is the Canada Line. It was only designed to have 50 m stations. The Montreal Metro & TTC Subway were designed to have 152 m. Unlike Seattle & Edmonton & especially Montreal & Toronto, building for longer trains isn't a problem. That's because they don't have anything like a backward BC mentality or a water it down, because its Vancouver, approach to things. Being from Vancouver, it's always amazing to see what other cities are able to do, simply because they don't take a backwater BC approach to things.

https://en.wikipedia.org/wiki/Fremont_Bridge_(Seattle)

https://en.wikipedia.org/wiki/Ballard_Bridge (Seattle)


MONTREAL

https://en.wikipedia.org/wiki/Jacques_Bizard_Bridge Even a backwater part of Montreal will get an upgrade from a 3 lane joke to a 4 lane bridge with wider sidewalks. https://montreal.ctvnews.ca/bridge-construction-causing-travel-nightmare-for-ile-bizard-residents-1.6564161

https://www.westislandtoday.com/post/the-construction-of-l-%C3%AEle-bizard-s-bridge-is-well-underway

  • Expanding to 4 traffic lanes, 1 more than the existing bridge   
  • Building a wider two-way bike path and sidewalk   
  • Complete redevelopment of the road, water and sewer mains and street lighting system   
  • Refurbishing electrical networks and wiring 

https://montreal.ca/en/articles/building-new-bridge-pont-jacques-bizard-26379 Fortunatly, no one from Metro Vancouver was able to stop this Greater Montreal improvement. The backward BC mentality is terrible. It would be devastating if Quebec had ever started to emulate the BC approach to things.

https://globalnews.ca/news/10180724/new-jacques-bizard-bridge-west-island-traffic Unfortunatly, the new bridge won't have a couple of bus-lanes. https://www.ebcinc.com/en/2022/04/05/new-jacques-bizard-bridge A 6 lane bridge would have allowed for that. Perhaps a parallel bus-bridge might eventually be built there, someday. That's what Calgary eventually did with the the+Cushing+Bridge upgrade.

Tuesday, July 18, 2023

West Georgia Street in Vancouver

 https://www.pinterest.ca/pin/west-georgia-street-rush-hour-vancouver-bc--72550243987409307

https://dailyhive.com/vancouver/skytrain-north-vancouver-west-vancouver-north-shore

The Lions+Gate+Bridge is a classic 3 lane bottleneck, or the quintessential urban chokepoint. The LGB could become an excellent foot, bus & bike bridge, if only a tunnel could be built close to it.

Five-blocks east of the park, Georgia Street is continually seven lanes wide.

https://vancouver.ca/streets-transportation/west-georgia-complete-street.aspx

While that segment of W. Georgia_Street is 7 lanes wide, an 8 lane tunnel could cross the 1st Narrows. A 7 lane tunnel might be a little cheaper with a middle centre lane section & barrier, two 4 lane compartments would be much better. During the morning, all 4 lanes could be heading into Vancouver with 1 as a HOV lane. Then, during the afternoon, all 4 northbound lanes would be open with the 4th being a HOV lane.

The 4 lane northbound tunnel could emerge just north of the LGB. Then the surface route could connect to Marine Drive and then turn onto Capilano Road. The Cap interchange is already there. Simply moving the yellow line over one lane would allow 3 lanes of northbound traffic on Capilano Road. 

A reconfigured TCH & Taylor Way interchange could allow for 3 southbound lanes right down to the mall, simply by moving the yellow line over 1 lane. Then, a 3 lane Taylor Way southbound tunnel could start just south of the Marine Drive intersection. A southbound HOV lane would have to be routed into it.

https://vancouversun.com/news/local-news/this-week-in-history-the-great-georgia-harris-viaduct-opens-in-1915 Aparently, no one bothered to make sure that the 4 lane structure could properly support streetcars. Thus, the inept city couldn't use it as a major east-west streetcar route.

https://spacing.ca/vancouver/2011/06/16/the-viaducts-past-present-and-future-part-1 Even in the 1970s there was no concept to have an express bus corridor betwen Vancouver, Burnaby & Coquitlam. 

https://viewpointvancouver.ca/2015/01/13/john-mackie-the-georgia-viaduct-and-the-freeway-fight-1972

Then when the first 2 SkyTrain lines were built, the stations were barely half the length of the 152.5 meter Montreal Metro stations. Evidently, this was to save money, but the stations should have still been built to proper big city standards. Then to further reinforce the symbolism of congestive planning agenda, the 3rd line only has enough clearance for 50 meter stations. 

Sydney started to have taller buildings than Vancouver by the early 1960s. https://ca.pinterest.com/pin/west-georgia-street-1960--497647827546801125 It took until the end of the 1960s for Melbourne to start having taller buildings than Vancouver. Then as Melbourne soared into the 1970s, Vancouver started to create a series of overlapping restrictions to thwart the city.

https://www.pinterest.ca/pin/british-columbia-vancouver-skyline-1970s-with-possible-building-site-of-west-coast-transmission-building--716424253196467928 Despite being a Pacific city, Vancouver & Canada don't seem to be interested in having a proper metropolis on the scale of Sydney, Melbourne & Brisbane. The tallest buildings in Vancouver must be shorter than even the tallest in Perth, Seattle & Calgary. Most of the roads & bridges are to be half the width & the trains are also to be a half-length joke. Thus, Greater Vancouver has been in a perpetual state of congestion.


https://jfdatalinks.blogspot.com/search?q=Georgia+Street

Friday, October 18, 2024

Canada's Highway 1 through the BC Interior is an Embarrassment

 https://dailyhive.com/vancouver/canada-highway-1-bc-interior-embarassment Back in the day, just to have a waggon road there was quite an achievement. Then with the dawn of the motorcar & trucks, having 1 wagon-road each way was amazing. A minimum of 2 lanes each way with 2 emergency lanes on all main highways in BC would be an improvement. Unfortunatly, the backwater BC mentality persists through the decades & generations. 

There should have already been a 6 lane Hope bypass with 2 wide shoulders & a provision for 2 Bus & HOV lanes. Another classic three lane BC bottleneck. The inept 2 lane Hope-Fraser+Bridge chokepoint is one of the best examples of BC and Canada's refusal to build proper size infrastructure where its really needed. This 3 lane joke should have been part of the 6 lane Hope bypass.

Since there is a reluctance to have a proper intercity passenger rail network in BC, there should at least be a proper intercity bus network. All the main highways should have 2 dedicated bus & HOV lanes.

A 6 lane elevated section could go right there. A nice 2 lane bridge that should have been twinned or duplicated decades ago. The same for the rail line as well. A single track and a 2 lane bridge are indicative or symbolic of the antigrowth mentality or agenda. 

There is nothing wrong with higher levels of immigration for such a vast country, if the infrastructure is allowed to keep up. However, decades of an antigrowth agenda is forced to collide with immigration.

This 2 lane 1963 highway tunnel should have been twinned by the early 1990s. Now the 1960s highway infrastructure is even farther away from being adequate.

Spences+Bridge is another 2 lane wonder, with no emergency lanes and no divider. 

Savona+Bridge also meets the backwater BC standard by only having 2 lanes, with no wide emergency lanes and no divider. 

https://www.google.com/maps/place/Kamloops,+BC/@50.6530262,-120.3776251,160m/data=!3m1!1e3!4m16!1m9!3m8!1s0x537a66c7aa6b6aaf:0x881b41e937e7f1f9!2sBritish+Columbia!3b1!8m2!3d53.7266683!4d-127.6476205!10e5!16zL20vMDE1anI!3m5!1s0x537e2cd33d0d3b31:0xd23e96aa9a6945e7!8m2!3d50.674522!4d-120.3272675!16zL20vMDF3ajE3!5m1!1e1?entry=ttu&g_ep=EgoyMDI0MTAxNi4wIKXMDSoASAFQAw%3D%3D

https://www.google.com/maps/place/R.W.+(Rolf+Wallgren)+Bruhn+Bridge/@50.8358134,-118.9947739,174m/data=!3m1!1e3!4m16!1m9!3m8!1s0x537a66c7aa6b6aaf:0x881b41e937e7f1f9!2sBritish+Columbia!3b1!8m2!3d53.7266683!4d-127.6476205!10e5!16zL20vMDE1anI!3m5!1s0x537ee90068c15d23:0x669386a2a005d716!8m2!3d50.8360309!4d-118.9939614!16s%2Fg%2F11vwq02dl3!5m1!1e1?entry=ttu&g_ep=EgoyMDI0MTAxNi4wIKXMDSoASAFQAw%3D%3D

https://www.google.com/maps/place/Revelstoke+Suspension+Bridge/@51.0062434,-118.2203159,192m/data=!3m1!1e3!4m16!1m9!3m8!1s0x537a66c7aa6b6aaf:0x881b41e937e7f1f9!2sBritish+Columbia!3b1!8m2!3d53.7266683!4d-127.6476205!10e5!16zL20vMDE1anI!3m5!1s0x537937491061a343:0xb88365d308abe089!8m2!3d51.0063885!4d-118.2201286!16s%2Fg%2F11gnpb6r3f!5m1!1e1?entry=ttu&g_ep=EgoyMDI0MTAxNi4wIKXMDSoASAFQAw%3D%3D

https://www.google.com/maps/place/Columbia+River+Bridge/@51.4839714,-117.1830525,1170m/data=!3m1!1e3!4m16!1m9!3m8!1s0x537a66c7aa6b6aaf:0x881b41e937e7f1f9!2sBritish+Columbia!3b1!8m2!3d53.7266683!4d-127.6476205!10e5!16zL20vMDE1anI!3m5!1s0x5379b5debedfdda3:0x1b8d0d3bead3846f!8m2!3d51.4842419!4d-117.1806309!16s%2Fg%2F11g8_2_6wc!5m1!1e1?entry=ttu&g_ep=EgoyMDI0MTAxNi4wIKXMDSoASAFQAw%3D%3D

https://www.google.com/maps/place/Frenchman's+Bridge/@51.2988904,-116.8970772,376a,35y,0.67h,44.93t/data=!3m1!1e3!4m16!1m9!3m8!1s0x537a66c7aa6b6aaf:0x881b41e937e7f1f9!2sBritish+Columbia!3b1!8m2!3d53.7266683!4d-127.6476205!10e5!16zL20vMDE1anI!3m5!1s0x5379c1b7e53bd251:0xfb9e2572de7fcac9!8m2!3d51.3023971!4d-116.8957702!16s%2Fg%2F11v3ltcw_v!5m1!1e1?entry=ttu&g_ep=EgoyMDI0MTAxNi4wIKXMDSoASAFQAw%3D%3D

https://www.google.com/maps/@51.4487081,-116.3233593,253a,35y,86.67h/data=!3m1!1e3?entry=ttu&g_ep=EgoyMDI0MTAxNi4wIKXMDSoASAFQAw%3D%3D

Tuesday, May 20, 2025

TransLink to extend North Shore RapidBus route to Metrotown starting in 2027

 https://dailyhive.com/vancouver/r2-rapidbus-north-shore-metrotown-burnaby-route-extension

https://aquilinidevelopment.com/community/kwasen-village

https://kwasenvillage.com 

The Kwasen Village & BCIT area is becoming a new intersection of housing & shopping, as well as education. So, hopefully starting in 2027, there will be an express bus from Metrotown_to_West-Vancouver. It will run along Willingdon Avenue providing a rapid bus link between Metrotown and Brentwood-Town-Centre-Station. Then onto N.Vancouver & W.Vancouver. This is being done, because backwards Vancouver refuses to build a rapid bus tunnel under or near the absurd, 3 lane Lions_Gate Bridge. Plus, the BC Government isn't interested in extending the SkyTrain on a bridge or through a tunnel to W.Vancouver. Thus, the inept, 3 lane Lions-Gate-Bridge remains as one of the worst bottlenecks or chokepoints in the world. 

Perth, WA built a 10 lane bridge with double train tracks in the middle of it.

Seattle, WA did something similar, but their 3 section bridge or crossing has 4 lanes each way & a double track middle section.

Montreal also did something similar to Seattle & Perth.

Being from backwards Vancouver & backwater BC, it's always amazing to see what other places can do, simply because they aren't in BC.

Fortunately, Perth, Seattle & Montreal don't have to contend with anything like the inept Vancouver & BC transportation mentality. It's mindboggeling that in 2025, Vancouver is still only running 4 car trains to Surrey & only 2 car trains to Coquitlam & Richmond. This, combined with several narrow bridges, makes it one of the most congested cities in the world. It's a sad & pathetic situation, because things in BC should be designed for proper future capacity expansion.


Friday, November 29, 2024

Cambie Street Bridge repairs choke traffic out of downtown Vancouver

 https://dailyhive.com/vancouver/cambie-bridge-repairs-choke-traffic-downtown

Of course Vancouver won't build anything like the Boorloo_Bridge for bikes & pedestrians. Apparently, it's much better to take a lane away from the Cambie Bridge. 

Fortunately, the backward Vancouver mentality never made it over to Perth. Otherwise, the The_Third_Causeway bridge would have had 1 or 2 lanes removed.

With 6 lanes, The_Causeway_in_Victoria_Park, Perth provides a nice 6 lane crossing. Unlike backward Vancouver the Causeway in Perth was allowed to have 3 lanes each way. The key component is that the 3rd lane each way is for busses. In contrast, absurd Vancouver won't allow for a proper bus & bike bridge network to be built, because it would rather keep its bridges as narrow & congested as possible. 

https://upload.wikimedia.org/wikipedia/commons/5/5a/Causeway_-_Victoria_Park.JPG

It's very strange that Vancouver refused to have something like the 6 lane Causeway+Bridge in the 21st century. A 3rd lane each way for buses on the Causeway+Bridge makes so much sense in Perth. However, for stubborn Vancouver, such measures might help to improve mobility.

Apparently, Vancouver has no plans to build something like the Boorloo_Bridge or the Esplanade+Riel+Footbridge next to the Cambie & Burrard Bridges. Thus, the Cambie has lost a lane & the Burrard has lost 2 lanes. Had both bridges been allowed to retain 6 lanes, they both could have provided 2 bus lanes.

The Cushing+Bridge is a 4 lane bridge in Calgary. Thus, like the Oak Bridge & Knight Bridge in Vancouver, there was no room for 2 bus lanes on them. Unlike, backward Vancouver, Calgary was able to build a 2 lane bus bridge right next to its Cushing+Bridge.

Fortunately, the horrible transportation planning mentality of Vancouver was never adopted in Perth & Calgary. Either you have a wide enough bridge for busses, or you build bus & bike bridges to help the existing bridges.

The Norwood+Bridge in Winnipeg provides at least 6 lanes, so a couple of bus lanes isn't a problem.

Singapore built its Helix_Bridge instead of removing lanes from the other bridges.


https://jfdatalinks.blogspot.com/search?q=Cambie+Street+Bridge

Thursday, November 21, 2024

How the City of Vancouver will pay for its 2026 FIFA World Cup costs

 https://dailyhive.com/vancouver/fifa-world-cup-vancouver-hotel-tax-costs

https://vancouver.ca/streets-transportation/bus-network-improvements.aspx With so many narrow streets, its difficult to have a proper network of bus-lanes, especially on the bridges.

https://visionzerovancouver.ca/2024/07/10/take-action-add-bus-lanes-to-translinks-priority-routes Unfortunatly, most of the bridges in the Greater Vancouver Region are just too narrow. There was no logic to have enough extra width for future bus-lanes and HOV lanes.

https://www.biv.com/news/transportation/vancouver-new-dedicated-bus-lanes-translink-2024-9267523

Unless there is a regional network of new bus-bridges, Greater Vancouver will remain in a bottleneck or chokepoint nightmare. Stuck with only a half-assed express or BRT attempt. I suppose that would be impressive to Kelowna-Victoria-Prince+George-Kamloops (K-V-PG-K) standards. Unfortunatly, those aren't big league cities.

Of course the 3rd line, or the YVR-Canada-Line or the Canada (embarrassment) Line, still hasn't been expanded up to a 2.5 car train, let alone having 5 car trains. Right from the start, the trains should have consisted of at least three, 20m coaches, with a provision for 6 car trains. Apparently, because of budget cuts, the station platforms weren't built to be 60-100m long in the first phase, they are only a 50m joke. 

The stations could have been roughed out to initially accomodate 3-4 car trains and eventually, 8 car trains. 8 x 20m= 160m. The Montreal Metro stations were built to accommodate a 152.5m train. Fortunately, Quebec doesn't have anything like a backward BC planning mentality to hinder it.

The YVR-Canada (embarrassment) Line doesn't have to be stuck as a symbolic example to not properly plan & build for longer trains in BC. This 3rd Metro-Vancouver rapid transit line doesn't have to be stuck with a 2.5 car train buildout. The incredibly short stations should be extended to 60m, which could accomodate a proper 3 car, walkthrough train. Then, with Selective_Door_Operation Technology, a 3 car train can become a 5 car train of 100m. Then, only the middle 3 cars would directly have access to the YVR-Canada-Line station platforms. 

Unfortunatly, due to the shortsighted planning mentality that is Vancouver & BC, the underground stations don't have enough level clearance to be lengthened to 152.5m or 500 feet, like the Montreal Metro stations, which can accomodate nine, 55 foot cars. At least a 5 car, 100m or 328 foot train is still possible in short-minded Vancouver.

For some strange reason, the YVR Canada+Line wasn't designed to eventually provide a link beyond the Vancouver_International_Airport to Waterfront_station. Indeed, a 2nd phase of the inadequate line should have connected Waterfront_station with the Park_Royal_Shopping_Centre and the Horseshoe_Bay_ferry_terminal. Then the 3rd phase to connect the YVR-Airport_station with the Tsawwassen_ferry_terminal

Like the Catheter Line, the George_Messey_Tunnel was designed to be inadequate, right from the start.

The George_Massey_Tunnel should have had at least 2 wide emergency lanes for future truck or HOV lanes. Plus, there should have been another tunnel section to accommodate a future express or rapid bus corridor & 2 tracks for a light rail train. Instead, cars, busses & trucks were all funneled into a 4 lane chokepoint. Ironically, over the past few decades, a bus & train tunnel or bridge should have been built, at least.

Express Bus lanes or Rapid Bus lanes vs. HOV & Truck lanes. Any bus lane has the potential to move many more people than any HOV lane. Any major port city & metropolitan area should have a truck lane as well as a bus lane. Thus any HOV lane would be more efficient in bussing people & trucking payloads.

Of course the new George_Massey_Tunnel still won't have a provision for a train section. No emergency lanes, but 2 bus lanes in addition to only 3 general lanes each way. Once again, backward BC gets its wrong. Greater Vancouver is suppose to be a major seaport. Unfortunatly, the new tunnel will only have 4 lanes each way & no HOV or emergency lanes, of course.  

Even if there are only 3 general lanes each way, there should have been a provision for a truck lane in addition to a bus lane each way. That would be at least 5 lanes each way, but no emergency lanes & still no provision for 2 train tracks either. 

Thus, the new tunnel will eventually have to have a bus & train bridge or tunnel next to it. That would allow the tunnel to have 3 general lanes each way & 1 HOV lane each way. A rapid bus & rail corridor would ensure 24 hour high capacity transit, even when the YVR-Canada-Line is shutdown overnight. 

Unfortunatly, none of the 80m & 50m SkyTrain stations were designed to have 4 tracks. That would have allowed for a proper express & local train system. The BC mentality seems to be about keeping the trains as well as the roads inadequate to meet future high transportation demands.

The LG Bridge in Vancouver should have had bus, HOV & train tunnels near it decades ago. Surrey_and_Richmond also should have had proper bus, HOV & train tunnels, decades ago.

Why have 3 sets of tracks like the O'Hare_station in Chicago? Or, have at least have 2 tracks like at the SeaTac/Airport_station. The small-scale YVR-Airport_station just has a single track to make congestion more likely. The Vancouver_International_Airport should have had at least 4 long runways by now.

The multigenerational backwater BC mentality is a combination of overlapping restrictions and a, keep it small or backwards agenda. Why plan and build like a big city, when Vancouver can mostly do things that are only impressive to smaller places like, Kelowna-Victoria-Prince+George-and-Kamloops?

Short trains, mostly stumpy buildings and mostly narrow bridges, provides powerful symbolism for the  antigrowth agenda. Building up proper size infrastructure is the opposite. 


https://jfdatalinks.blogspot.com/search?q=Canada+Line

https://jfdatalinks.blogspot.com/search?q=C+Line

Friday, November 1, 2024

Vancouver's narrow bridges over the Fraser River

 https://dailyhive.com/vancouver/vancouver-knight-street-video-concern

The Knight_Street_Bridge (KSB) was deliberately designed to not have a couple of emergency lanes. No truck lanes and especially no bus and HOV lanes. No proper bike lanes, just 2 narrow sidewalks. 

https://en.wikipedia.org/wiki/Knight_Street_Bridge#Infrastructure

Thus, the Knight_Street_Bridge is one of the best examples of BC bottleneck planning.

https://images.drivebc.ca/bchighwaycam/pub/html/www/695.html

The Knight_Street_Bridge is so narrow and inept, that a new HOV, bus and bike bridge should be built right next to it. The Knight+Street+Bridge is only 4 lanes wide in the middle, so a parallel 4 lane bridge would greatly improve things. One lane on and one lane off between the twin bridge crossing and Marine-Drive. Then the main 3 lanes each way onto the 6 lanes of Knight+Street up to Kingsway. 


The incredibly narrow Fraser_Street_Bridge (FSB) was torn down and should have been rebuilt or replaced by the 1970s, especially by the 1990s. The city and the Provincial_government didn't seem to understand that a new bridge there would be great as a HOV, bus and bike bridge. A couple of wide emergency lanes would have made it a lot easier for emergency vehicles to go between Vancouver & Richmond.


Despite Oak Street being 6 lanes wide, the BC bottleneck mentality wanted to force everything into a 4 lane Oak_Street_Bridge (OSB). Even if there was no concept to have bus lanes in the late 1950s, the OSB should have had 6 lanes, plus 2 wide emergency lanes and 2 wide sidewalks.

https://en.wikipedia.org/wiki/Oak_Street_Bridge#Infrastructure

By now, there should have been a HOV, bus & bike bridge built next to the narrow & inept Oak_Street_Bridge


The Arthur-Laing-Bridge (ALB) is only 2 lanes each way. https://en.wikipedia.org/wiki/Arthur_Laing_Bridge


The multigenerational inept Vancouver & BC planning agenda is all about creating more congestion. 

Fortunately, the 8 lane Champlain+Bridge also has 2 passenger train tracks. This was possible, because Montreal and Quebec don't have anything like the Vancouver & BC mentality to hinder them.

Why have a provision for 10 car SkyTrains, when a 2-4 car joke of a train can enable more congestion? That's the backward BC way.

It's amazing that the Montreal+Metro was designed to have 9 car trains, even back in the 1960s. Montreal and Quebec in general, just don't have anything like a backwater BC mentally to contend with. Quebec isn't just able to do more because it has more people than BC, Quebec has been able to accomplish more because it isn't BC.

https://vancouver.ca/streets-transportation/bridges-and-structures.aspx

Despite being a newer crossing, the Arthur+Laing+Bridge was only designed to have 4 lanes, just like the older Oak+Street+Bridge. Both bridges should have been built with very wide shoulders, so that they eventually could have provided 6 lanes. Plus, both bridges should have had very wide sidewalks. However, that goes against the chokepoint planning mentality.

Wednesday, December 18, 2024

Hobart, Tasmania

The University+of+Tasmania seems to have been Vancoverized, in terms of its 1 lane each way streets. 

Hobart is much smaller than Vancouver, BC. Yet, it has more lanes on a total of 3 crossing over the River_Derwent_(Tasmania). Burrard Inlet in Greater Vancouver only has 2 bridges.

Fortunately, Hobart has the 5 lane Tasman+Bridge, the 4 lane Bowen+Bridge and the 2 lane Midland+Hwy+Bridge. That's a total of 11 lanes.

In contrast, Burrard_Inlet-Port_of_Vancouver only has the 6 lane Iron+Workers+Memorial+Bridge and the inadequate 3 lane Lions+Gate+Bridge. Only 9 lanes for the old port area of the region. While a multigenerational moratorium on any new harbor bridges made sense from an anti-freeway perspective, something essential was neglected. As of the end of 2024, no bus-bridge or bus-tunnel was ever built across the harbor. There is only a single freight train track, so of course there was never a truck-bridge or a truck-tunnel built. Even at the dawn of 2025, a SkyTrain or LRT crossing still only seems like a pipedream. 

Greater Hobart isn't just the state capital, its the main city on the island of Tasmania, which has less than 65% of a million people. Greater_Vancouver is getting close to 3 million people, yet the infrastructure is so inadequate.

Anyone visiting Vancouver from the big 4 cities of Melbourne, Sydney, Brisbane & Perth might be surprised to see shorter trains & smaller buildings & narrower bridges & highways. Those 4 cities, just like Toronto, Montreal, Calgary & Edmonton, are allowed to exist on a larger scale than extremely restrictive Vancouver. Indeed, its as if rainy Vancouver must continually water things down.

Tuesday, October 14, 2025

Granville Bridge, Vancouver, etc.

 https://vancouver.ca/streets-transportation/granville-bridge.aspx 

Even after 3 tries, Vancouver still couldn't quite get the Granville_Street_Bridge correct. Of course the 3rd bridge wasn't designed to have a lower deck for streetcars or tram-trains. Even though it was generally designed to be a car, truck and bus bridge, the sidewalks should have been double width and have an inner railing. If the city couldn't wait until late March, it should have had the official dedication in early March, not in crappy February 1954.

https://en.wikipedia.org/wiki/Granville_Street_Bridge#Third_bridge_(1954) "On February 4, 1954, the current Granville Street Bridge opened to traffic after five years of planning and construction; its dedication ceremony was attended by 5,000 spectators after it had been delayed a week due to heavy snow." 

https://en.wikipedia.org/wiki/Granville_Street_Bridge#21st_century Unfortunatly, new bike lanes and extra sidewalks couldn't be installed below the 8 lane deck. Thus, Vancouver went for strike 3 and removed 2 lanes from the bridge. The Burrard+Street+Bridge lost 2 lanes and the Cambie+Bridge lost 1 lane. A bike and foot bridge could have been built on the west side of the Burrard Bridge, then no lanes would have been removed. The Cambie Bridge already had a wide sidewalk on its east side. The west sidewalk should have been widened, then no lane would have been removed. 

The Granville+Bridge could have had 6 lanes and 2 bus lanes. Now, if there are ever 2 bus lanes, there will only be 2 general lanes each way.

Several cities around the world have bike & foot bridges and don't have to remove lanes from the existing bridges.

For a congested city to have removed 5 lanes from 3 bridges, could there even be more of a reduction of lanes Well, there are some who would like to have the LGB just for bike and foot traffic.

https://globalnews.ca/news/1946543/government-says-lions-gate-bridge-will-not-close-to-cars-come-2030 