A Richmond encampment under the Oak Street bridge

 https://vancouver.citynews.ca/2025/11/19/growing-calls-to-clear-richmond-encampment 

Of course any neighborhood will be concerned when a bunch of people are living under a bridge and wandering around. 

Living under a bridge is hardly affordable housing. There needs to be proper secure housing with plenty of security and staff to help people who are stuck living outside. 

That bridge is so narrow and inadequate. 

SW-Vancouver needs a proper transportation upgrade. Granville Street should be extended across the Fraser River on a parallel bridge to the Oak Street Bridge (OSB). Then, the 2 bridges could provide 4 general lanes each way. Plus, another 4-lane parallel bridge to accommodate 2 BRT lanes and 2 HOV lanes. 

Or, a totally built a new version of the Oak+St+Bridge that could provide 6 lanes northbound. Then, a Granville Street extension could provide 6 southbound lanes onto a new OSB. Four general lanes each way, plus a rapid bus lane each way & 1 HOV lane each way. 

For the most part, the Oak+Street-Granville+Street+Corridor has 12 lanes. A yellow paint strip designates 3 lanes each way. Instead, Oak could have 6 northbound lanes and Granville could have 6 southbound lanes. The 5th & 6th lanes could be for the Oak & Granville BRT lane & HOV lane on complete one way streets.

Unfortunately, the OSB remains as a 4 lane traffic bottleneck or chokepoint. 

The 2009 era Canada (embarrassment) Line is still only using 2 car trains in 2025. A proper big city YVR-Canada Line should have been started with 5 car trains. Unfortunately, this joke of a train is only designed to ultimately run a 2.5 car train, someday. 

This stunted infrastructure approach is so absurd. Transportation planning in the most populated parts of BC is so inadequate, but its all part of backwards BC symbolism. The symbolism is all about showing a thwarted or watered down a city can be. Narrow bridges and short trains are some of the best ways to increase congestion and inefficiency in backwater BC. 


https://jfdatalinks.blogspot.com/search?q=Oak+Street+Bridge

Friday, February 7, 2025

Oak Street Bridge and Granville Street Bridge

While Oak+Street continues over the Fraser River as a bridge, there is no Oak+Street+Bridge (OSB) over F. Creek. The city foolishly never even allowed for future clearance for a bus & bike bridge over F. Creek. From the Fraser River to F. Creek, Oak Street should have been mostly for northbout travel.  

Right now, the Oak+Street-Granville+Street+Corridor has 12 lanes. That's because they are both 6 lane streets. Simply by moving the centerline over one lane, they each can provide 4 lanes one way & 2 lanes the other way. A reconfiguration of 4+2 lanes or even 5+1 lanes.


https://jfdatalinks.blogspot.com/search?q=Granville+Street+Bridge GSB

https://jfdatalinks.blogspot.com/search?q=Oak+Street+Bridge OSB

https://jfdatalinks.blogspot.com/search?q=Oak+Street+Bridge+and+Granville+Street+Bridge

Monday, August 12, 2024

Several narrow Vancouver bridge issues

 https://dailyhive.com/vancouver/metro-vancouver-bridge-cyclist-wire-allegations

Someone might have been very angry with bike people and not with car, bus & truck people. The real problem is that so much of the older BC infrastructure just wasn't designed to be more of a multi-modal crossing. The+Lion+Bridge+and+The+Iron+Bridge have no rail rapid transit crossings to help them.

The Ironworkers-Bridge is so narrow for a highway bridge in that location & wasn't designed for substantial future capacity. When it was initially designed in the 1950s, there was no concept to have 2 bus lanes, 2 HOV lanes, 2 truck lanes & 2 emergency lanes for a port city. Plus, at least 2 general traffic lanes each way & a provision for 2 train tracks. Thus, the 6 lane bridge is so overwhelmed, because it just can't do the job of an 8-10 lane wide bridge. While the Iron Bridge has 2 improved bike+lanes, they are part of the sidewalks.  

The former 8 lane Granville+Street will have 6 lanes, while the  & Oak+Street only has 4 lanes. The inadequate Oak+Street+Bridge (OSB) should have opened with at least 8 lanes, instead of only 4. Plus, 2 wide emergency lanes & 2 wide sidewalks. There still should be a new southbound OS Bridge, but the city would be against it. A narrow 4 lane bridge just doesn't have the space & capacity for 2 express bus lanes, 2 HOV & 2 truck lanes. Apparently, it's better to just funnel everything into only 2 lanes each way.  

The OSB should be twinned or replace with something like the Samuel-De_Champlain_Bridge in Montreal. The largest city in Quebec is allowed to have a nice wide bridge & long metro trains, because Quebec isn't bound by anything like the backwards BC mentality. 

https://www.theglobeandmail.com/canada/article-montreals-new-44-billion-champlain-bridge-opens-to-traffic-for Fortunatly, the Vancouver mentality wasn't able to ever reach back to Montreal & prevent such a nice modern bridge from being built there. https://www.flatironcorp.com/project/champlain-bridge If you are from Montreal & have visited Vancouver, you will be surprise to see how much shorter an underground Vancouver train station is than what is allowed underground in Montreal, Toronto, Edmonton, Seattle, SF & LA...

https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx A bike & foot bridge should have been built next to it decades ago. Then the Granville+Bridge could have 3 general lanes each way, plus a bus & HOV lane each way. Instead, if 2 bus & HOV lanes are designated, there will only be 2 general lanes each way in the downtown core.

The Burrard Bridge should have had a bike & foot bride next to it. Instead, it was reduced from a 6 lane crossing to a 4 lane bridge.

The very narrow Oak+Street+Bridge & the Knight Street Bridge, should have had bus+and+bike+bridges built next to them decades ago. 

Most bridges in Vancouver & the metropolitan region just weren't designed with that much future capacity in mind, especially for buses & HOV lanes. Thus, it's a travesty that by now, almost every crossing should have had bus & bike bridges built next to them. 

https://vancouver.ca/streets-transportation/walk-bike-and-transit.aspx Unfortunatly, provisions for bus & bike lanes just weren't the thing to do several decades ago in BC.  

A truck lane is just as important as a bus & HOV lane. That's because freight should be efficiently & easily be transported in any major urban region.

https://vancouver.ca/streets-transportation/trucks-commercial-and-oversize-vehicles.aspx 



https://jfdatalinks.blogspot.com/search?q=Oak+Street+and+Granville+Street

https://jfdatalinks.blogspot.com/search?q=Iron+Bridge 

https://jfdatalinks.blogspot.com/search?q=Lion+Bridge 

https://jfdatalinks.blogspot.com/search?q=Burrard+Bridge 

https://jfdatalinks.blogspot.com/search?q=Granville+Bridge 

https://jfdatalinks.blogspot.com/search?q=Oak+Street+Bridge

Friday, November 1, 2024

Vancouver's narrow bridges over the Fraser River

 https://dailyhive.com/vancouver/vancouver-knight-street-video-concern

The Knight_Street_Bridge (KSB) was deliberately designed to not have a couple of emergency lanes. No truck lanes and especially no bus and HOV lanes. No proper bike lanes, just 2 narrow sidewalks. 

https://en.wikipedia.org/wiki/Knight_Street_Bridge#Infrastructure

Thus, the Knight_Street_Bridge is one of the best examples of BC bottleneck planning.

https://images.drivebc.ca/bchighwaycam/pub/html/www/695.html

The Knight_Street_Bridge is so narrow and inept, that a new HOV, bus and bike bridge should be built right next to it. The Knight+Street+Bridge is only 4 lanes wide in the middle, so a parallel 4 lane bridge would greatly improve things. One lane on and one lane off between the twin bridge crossing and Marine-Drive. Then the main 3 lanes each way onto the 6 lanes of Knight+Street up to Kingsway. 


The incredibly narrow Fraser_Street_Bridge (FSB) was torn down and should have been rebuilt or replaced by the 1970s, especially by the 1990s. The city and the Provincial_government didn't seem to understand that a new bridge there would be great as a HOV, bus and bike bridge. A couple of wide emergency lanes would have made it a lot easier for emergency vehicles to go between Vancouver & Richmond.


Despite Oak Street being 6 lanes wide, the BC bottleneck mentality wanted to force everything into a 4 lane Oak_Street_Bridge (OSB). Even if there was no concept to have bus lanes in the late 1950s, the OSB should have had 6 lanes, plus 2 wide emergency lanes and 2 wide sidewalks.

https://en.wikipedia.org/wiki/Oak_Street_Bridge#Infrastructure

By now, there should have been a HOV, bus & bike bridge built next to the narrow & inept Oak_Street_Bridge


The Arthur-Laing-Bridge (ALB) is only 2 lanes each way. https://en.wikipedia.org/wiki/Arthur_Laing_Bridge


The multigenerational inept Vancouver & BC planning agenda is all about creating more congestion. 

Fortunately, the 8 lane Champlain+Bridge also has 2 passenger train tracks. This was possible, because Montreal and Quebec don't have anything like the Vancouver & BC mentality to hinder them.

Why have a provision for 10 car SkyTrains, when a 2-4 car joke of a train can enable more congestion? That's the backward BC way.

It's amazing that the Montreal+Metro was designed to have 9 car trains, even back in the 1960s. Montreal and Quebec in general, just don't have anything like a backwater BC mentally to contend with. Quebec isn't just able to do more because it has more people than BC, Quebec has been able to accomplish more because it isn't BC.

https://vancouver.ca/streets-transportation/bridges-and-structures.aspx

Despite being a newer crossing, the Arthur+Laing+Bridge was only designed to have 4 lanes, just like the older Oak+Street+Bridge. Both bridges should have been built with very wide shoulders, so that they eventually could have provided 6 lanes. Plus, both bridges should have had very wide sidewalks. However, that goes against the chokepoint planning mentality.

Tuesday, September 17, 2024

North end of Granville Street Bridge

 https://canada.constructconnect.com/joc/news/projects/2024/09/north-end-of-granville-bridge-roadway-reopens

The 1950s Granville+Street+Bridge (GSB) should have at least had a provision for a lower deck.

https://dailyhive.com/vancouver/granville-bridge-north-end-reopens-vancouver-connector

A lower deck would have been great for extra bus lanes and potential LRT, but this is backwards BC.

https://vancouversun.com/news/traffic-alert-north-end-granville-street-bridge-reopen-monday

Since no bus & bike bridge was even built right next to it, the bridge is being scaled down to 6 lanes, from 8. That might not have been necessary if there was an Oak Street Bridge (OSB) over F. Creek, not just over the Fraser River. An OSB over F. Creek could have been a bus & bike bridge with wide sidewalks as well.

https://vancouver.ca/news-calendar/north-end-granville-bridge-reopens-transit-into-downtown-sep-2024.aspx

The 8 lane GSB becomes a revamped 6 lane bridge with 2 bike lanes & 2 sidewalks.

https://vancouversun.com/news/local-news/vancouver-granville-street-bridge-construction-detours-closures-timeline

If the Granville+Bridge eventually has 2 express bus lanes, there will only be 4 general traffic lanes.

https://granvilleisland.com/news/transportation-updates-on-granville-bridge-city-of-vancouver

Unfortunately, the 8 lane Granville_Street_Bridge_(1954) wasn't designed to have a lower level. That wasn't the case with the 12 lane Ship+Canal+Bridge in Seattle. Fortunately, the Vancouver bridge was never connected to a city freeway, where as the Seattle bridge was. Vancouver should have opted for a better major street & bridge arrangement. 

There was never any follow-up to have a new and improved Fraser+Street+Bridge (FSB). A modern FSB could be a nice bus and bike bridge with wide sidewalks & a potential for streetcars. Unfortunately, backwards Vancouver, BC seems uninterested in building something like the Tilikum+Crossing in Portland.



https://jfdatalinks.blogspot.com/search?q=Oak+Street+and+Granville+Street 

https://jfdatalinks.blogspot.com/search?q=Granville+Bridge

Tuesday, May 28, 2024

Five of Ontario's top 10 worst roads are located in the Greater Toronto Area

 https://toronto.ctvnews.ca/five-of-ontario-s-top-10-worst-roads-are-located-in-the-toronto-area-1.6903196 Of course its a good idea to make sure that the roads & streets are as smooth as possible.

The Greater_Toronto_Area is gradually becoming a vast urban region like the Chicago_metropolitan_area. So many more modes of transit must be provided for the GTA. IE, trains, HOV, bus & bike lanes. 

https://www.insauga.com/one-of-ontarios-worst-roads-is-among-the-busiest-streets-in-mississauga

Being from the BC Lower_Mainland, it's hard to believe that Canada's GTA is on its way to becoming like another Chicagoland. But then I always remember that Ontario, like Quebec & Alberta aren't under anything like the BC mentality & all of its restrictions.

https://www.cbc.ca/news/canada/hamilton/worst-roads-ontario-2024-1.7215979 

In effect, the Burlington_Bay_James_N._Allan_Skyway went from a BC like 4 lane bridge to an 8 lane Ontario crossing in the mid 1980s. https://en.wikipedia.org/wiki/Burlington_Bay_James_N._Allan_Skyway#1985_twin_bridge

https://511on.ca/map/Cctv/loc06--3
https://511on.ca/map/Cctv/loc06--3 Both bridges are safer than cramming everything into one crossing structure. 

https://burlingtontraffic.ca/qew-burlington-bay-james-n-allan-skyway The 4th lane each way could eventually become a bus & HOV_lane.

The 4 lane Burlington_Canal_Lift_Bridge is more like a narrow Vancouver bridge. Just 2 lanes each way with no space for an emergency lane or bus & HOV lane. That's why the Burlington_Bay_James_N._Allan_Skyway crossing is still better than any bridge within the Vancouver city limits. The skyway crossing combined with the lift bridge, provides 12 lanes, because the emergency lanes usually aren't counted. Just imagine if all that was funneled into a 4 lane Vancouver bridge. Fortunately, the backward BC bottleneck mentality has never taken over Ontario. 

While Oak Street in Vancouver has 6 lanes, the Oak_Street_Bridge was only designed to have 4 lanes. Thus, it's a fine example of the BC mentality and the multigenerational Vancouverization agenda. Vancouverization is all about watering things down & creating bottlenecks or chokepoints.

https://upload.wikimedia.org/wikipedia/commons/5/5f/Oak_Street_Bridge.jpg
https://wikimedia.org/Oak_Street_Bridge.jpg

The narrow 4 lane bridge should have been designed with a provision to eventually be at least 8 lanes wide. 3 lanes each way, plus a bus & HOV lane each way, but that would conflict with the narrow mindedness of Vancouver. It's sad that at least a bus & bike bridge wasn't built next to it, but that would conflict with the BC bottleneck planning approach to things.

https://upload.wikimedia.org/wikipedia/commons/5/53/Oak_Street_Bridge_and_Fraser_River%2C_Vancouver_-_panoramio.jpg
https://wikimedia.org/Oak_Street_Bridge_and_Fraser_River.jpg

https://images.drivebc.ca/bchighwaycam/pub/html/www/70.html A 6 lane street funneled into a 4 lane bridge. WTH?

The Oak_Street_Bridge really should have been opened as a 10 lane bridge. Yet, Oak_Street has only 6 lanes. A 10 lane OSB could have not only allowed for 3 lanes each way, but a bus & HOV_lane each way. Then the 5th lane each way could have been an emergency lane

https://www2.gov.bc.ca/gov/content/transportation/driving-and-cycling/traveller-information/routes-and-driving-conditions/hov-lanes

At the very least, a HOV, bus & bike bridge should be built next to the OSB. However, the multi generational backward BC mentality just doesn't care.

The 4 lane joke that is the George_Massey_Tunnel, should have had a HOV, bus & bike bridge built next to it several decades ago. But that would have actually created better mobility & less congestion.

https://en.wikipedia.org/wiki/George_Massey_Tunnel#Replacement Of course just like with the old tunnel, the new tunnel won't have a provision for LRT & emergency lanes. Thus, a LRT bridge would eventually have to be built next to it. Apparently, having a train from the Tsawwassen_ferry_terminal to the airport still doesn't make sense. That's just the backward BC way.

If you are from Ontario, Quebec, Alberta, the Pacific NW, Australia or just about anywhere, the watered down BC infrastructure will surprise you.


https://jfdatalinks.blogspot.com/search?q=old+and+new+narrow+bridges 

https://jfdatalinks.blogspot.com/search?q=bus+and+bike+bridges

Monday, January 13, 2025

Oak Street Bridge

 https://images.drivebc.ca/bchighwaycam/pub/html/www/70.html

No emergency or breakdown lanes & especially no bus lanes. Indeed, this 4 lane bottleneck-chokepoint should have opened with 6 lanes & 2 wide shoulders & 2 wide sidewalks. 

https://vancouver.ca/streets-transportation/oak-street-sewer-separation-upgrades.aspx

Granville Street & Oak Street are both 6 lanes wide, but the Oak_Street_Bridge is only 4 lanes wide. Unfortunately, back in the 1950s, the planners never allowed for 2 bus lanes, 2 truck lanes or even 2 wide emergency lanes. Thus, everything is crammed into only 2 lanes each way. Fortunately, most cities don't take such a congestive planning approach.


https://jfdatalinks.blogspot.com/search?q=Oak+Street+Bridge

https://jfdatalinks.blogspot.com/search?q=OSB

Friday, May 15, 2026

Granville Bridge death was preventable, advocates say

 https://vancouver.citynews.ca/2026/05/14/granville-bridge-death-was-preventable-say-advocates/ 

While the Granville+Bridge needs to have a higher fence like the Burrard+Bridge, there is another remaining pending danger. 

https://vancouversun.com/news/iio-investigates-womans-death-after-9-hour-incident-on-granville-street-bridge 

There is no central safety barrier to prevent head-on collisions. Whether a person becomes disoriented, or actually wants to crash into traffic from the opposite direction, there is no traffic divider.

https://www.ctvnews.ca/vancouver/article/barrier-needed-on-vancouver-bridge-after-another-suicide-death-advocates-say/

The sidewalks could have been made a little wider in a way that there still could have been enough space for a traffic divider. 

https://www.reddit.com/r/vancouver/comments/1td85mt/iio_investigates_womans_death_after_ninehour/ 


https://jfdatalinks.blogspot.com/search?q=Granville+Bridge Was 8 lanes, now 6, but with 2 bike lanes and wider sidewalks.

https://jfdatalinks.blogspot.com/search?q=Burrard+Bridge Was 6 lanes, now 4, but with 2 bike lanes & already good sidewalks. 

Unfortunately, both bridges have no middle safety barrier to prevent head-on collisions, despite their recent modifications. 


The Pattullo+Bridge was too narrow to ever have a traffic divider. Fortunately, its 4 lane replacement does have a central divider. 

https://jfdatalinks.blogspot.com/search?q=Knight+Street+Bridge Only 4 lanes in the middle, but has a traffic safety barrier. The KSB really needs a bus and bike bridge next to it.

https://jfdatalinks.blogspot.com/search?q=Oak+Street+Bridge A traffic divider was eventually installed, but the narrow bridge was never designed to have 2 emergency lanes, or 2 wide shoulders. There especially was no consideration to have 2 bus lanes on the OSB. Since there is no 24 hour train service to the airport, there should be a parallel bus and bike bridge. 

https://jfdatalinks.blogspot.com/search?q=Arthur+Laing+Bridge While it does have a traffic divider, there are no wide emergency lanes or wide shoulders. There isn't even enough space for 2 bus lanes. Thus, a bus and bike bridge really should be built next to it.

Sunday, April 20, 2025

The Oak Street-Granville Street Corridor

 https://en.wikipedia.org/wiki/Oak_Street_(Vancouver) , https://www.youtube.com/watch?v=kXbUb7TMj6k

The Oak+Street-Granville+Street+Corridor are both 6 lanes wide for most of their lengths. Thus, this is mostly a 12 lane street corridor and is much less disruptive than if a 10-12 lane freeway had been pushed through in the 1950s or 60s.

https://en.wikipedia.org/wiki/Granville_Street , https://storeys.com/vancouver-granville-street-entertainment-district-history-renewal-planning-program

The yellow line is set for 3 lanes each way. However, if it was moved over 1 or 2 lanes, then there could be 4 or 5 main lanes one way & 1 or 2 lanes the other way. 

The Oak+Street+Bridge+and+Granville+Street+Bridge are still part of an incomplete corridor.

An improved 8 lane Granville+Street+Bridge with double-width sidewalks could have still worked, if there had also been a wide bike & foot bridge built next to it. Then, a roughly new paralel bridge next to the 4 lane Oak+Street+Bridge could have allowed for an 8 lane crossing there. Four lanes of Granville_Street southbound over the Fraser River and 4 lanes of Oak_Street northbound.

Unfortunatly 2 lanes were removed from the Burrard+Street+Bridge (BSB), 2 lanes removed from the Granville+Street+Bridge (GSB) and 1 lane from the Cambie+Street+Bridge (CSB). That didn't have to happen if a bike bridge was built next to the BSB and the GSB. While the east side of the Cambie-Street-Bridge has a nice, wide sidewalk, there wasn't enough foresight to also have a wide sidewalk on its west side. However, that narrow sidewalk could still be built out to be nice & wide so that the CSB can be restored to 6 lanes. 

When a city & metropolitan region mostly has narrow bridges, removing lanes or not having enough is utterly foolish! Case in point... https://www.pattullobridgereplacement.ca Instead of 2 bus & 2 HOV lanes, everything will be initially funneled into just 2 lanes each way. https://www.pattullobridgereplacement.ca/about/projectoverview Two nice sidewalks & 2 nice bike lanes, but no emergency lanes or bus lanes, right from the start. Its another classic BC bottleneck in the making. Since the SkyTrain doesn't run on a 24hr basis, 24hr bus lanes are essential, but that would go against the congestive planning methodology that is backwards BC.


https://jfdatalinks.blogspot.com/search?q=Oak+Street+and+Granville+Street 

https://jfdatalinks.blogspot.com/search?q=Oak+Street+Bridge OSB

Saturday, June 27, 2026

How much will Vancouver change by 2036?

 https://www.youtube.com/watch?v=OJtotvMq2ls 

The Lion Bridge will likely still not have an express bus and LRT tunnel near it. The Iron Bridge still might not have a proper BRT and LRT bridge next to it. The OSB and the KSB will likely not have a bus and bike bridge built beside them. There will still likely be no new Fraser Street Bridge for bikes and buses. No Boundary Road bridges to provide a direct link between the North Shore and Richmond for buses, trucks and bikes.

While the first 2 Skytrain lines will have 5 car trains, the stunted YVR-Canada Line will only have 2.5 car trains. Vancouver still might not permit any office tower to have a 40th floor, but might allow some residential towers to be on a Melbourne, Sydney, Brisbane & Toronto scale. 

However, BIG city thinking and planning in Vancouver has always been so difficult. Boston, SF and the City of Paris are ridiculously small cities like Vancouver with all 3 having a land area of less than 50 sq. mi. or 129.5 sq. km. Yet, Boston, SF and especially the City of Paris, have all been able to fit so much more into the same general space. That's because they aren't bound by anything like the inept and extreme Vancouver type restrictions. 


Saturday, April 19, 2025

The narrow bridges of Vancouver, Canada

https://montecristomagazine.com/community/forgotten-bridges-vancouver

The LGB just wasn't designed with any future capacity in mind. 

History of the Lions Gate Bridge https://www.youtube.com/watch?v=JHqi7Kijedw 

https://en.wikipedia.org/wiki/Lions_Gate_Bridge#History

https://upload.wikimedia.org/wikipedia/commons/7/7e/Lions_Gate.jpg 

The inadequate 3 lane LGB is currently the most narrow road bridge in backwards & stubborn Vancouver. It's been in that category since the removal of the 2 lane Fraser Street Bridge in the 1970s. There was a refusal to twin the absurdly narrow LGB between the 1950s & 1970s. By the 1980s there should have been a subway tunnel and an 8 lane tunnel. Then two of the lanes could have been for buses. Georgia+Street is 7 lanes wide as it gets closer to Stanley Park. Thus, the main part of a tunnel through the park could have provided 3 general lanes each way & a bus lane each way. Instead, the 7 lanes of the westernmost part of Georgia Street are funneled into a 3 lane causeway & a 3 lane bridge. The LGB would be fantastic as just a bike & foot crossing, with train, bus & road tunnels well beneath & beside it.    

The Burrard_Bridge, BB or  BSB opened with 6 lanes, but now it only has 4 lanes. There are 2 bike lanes & 2 sidewalks. Had a parallel bike-bridge been built, the BB could have still had 6 lanes. While the BB has a lower level provision for streetcars or tram-trains, Vancouver did its damndest to phase out streetcars well before the 1960s. 

The Ironworkers_Memorial_Bridge has 6 lanes, but should also have had 2 wide shoulders & 2 very wide sidewalks. Unfortunatly, there was no provision for a lower deck, as is also the case with all of the other Vancouver  bridges. https://en.wikipedia.org/wiki/Ironworkers_Memorial_Second_Narrows_Crossing

Any replacement of the inadequate Ironworkers+Memorial+Bridge should be on the scale of what Perth, Seattle and Montreal have done.

https://en.wikipedia.org/wiki/Granville_Street_Bridge#Third_bridge_(1954)

https://www.youtube.com/watch?app=desktop&v=vPSdF0jRTC4 The Granville-Bridge or GSB is the widest bridge in the city limits. It opened with 8 lanes, but is being transformed into a 6 lane bridge with 2 bike lanes & 2 sidewalks. Had there been a paralel bike & foot bride, the GSB could have still been 8 lanes wide. Then there could have been 2 exclusive bus lanes.

https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx

The Oak Street Bridge should have been 8 lanes wide, with 2 wide sidewalks.

The Knight+Street+Bridge should have been 8 lanes with 2 wide sidewalks. Instead, its a 4 lane chokepoint.

The Arthur+Laing+Bridge should have been at least 6 lanes with 2 proper bike lanes & 2 sidewalks.

If the Cambie_Street_Bridge had 2 very wide sidewalks, then its likely that it would still have 6 lanes instead of 5. https://en.wikipedia.org/wiki/Cambie_Bridge#The_present_bridge

Unfortunatly, bottleneck or chokepoint planning is part of the Vancouver & BC mentality.

Of course BC & the Metro+Vancouver Region just hasn't put enough funds and effort towards proper big-city planning & infrastructure development. 

If Perth+and+Seattle had to conform to the extremely restrictive Vancouver approach to things, those cities would be in a perpetual state of chaos. Fortunately, nothing like the BC Mind Virus has ever reached WA.


https://jfdatalinks.blogspot.com/search?q=Oak+Street+and+Granville+Street 

https://jfdatalinks.blogspot.com/search?q=Oak+Street+Bridge OSB

Thursday, April 3, 2025

From the old and inadequate Fraser Street Bridge to the inadequate KSB

Somewhere in between 1950 & 1960, the old Fraser_Street_Bridge (FSB) should have been replaced with a new 4 lane bridge, with 2 very wide sidewalks for bikes & a future provision for 2 bus lanes. Vancouver needs a street and transit connection with No. 5 Rd. in Richmond. Unfortunatly, backwards Vancouver has always been a city without a proper big city transportation vision.

https://evelazarus.com/the-fraser-street-swing-span-bridge

https://en.wikipedia.org/wiki/Fraser_Street_Bridge_(1894)#Provincial_government_headache

https://www.richmond-news.com/local-news/photos-and-video-was-this-the-unluckiest-bridge-between-richmond-and-vancouver-4475444

https://search.nbca.unbc.ca/index.php/fraser-st-road-bridge-in-vancouver-bc-1 In the late 1800s, just being able to have a bridge roadway width of 2 wagon-roads in backwater BC was amazing. Then, decades & even several generations later, any BC bridge that could provide 2 wagon-roads each way was even more amazing. 

https://structurae.net/en/structures/fraser-avenue-street-bridge

As usual, Vancouver & BC lost & messed up an opportunity to have 2 great new bridges.

https://structurae.net/en/structures/knight-street-bridge (KSB)

https://evelazarus.com/the-knight-street-bridge-part-2

Once again, the lack of a proper big city vision resulted in the inadequate design for the 4 lane Knight+Street+Bridge (KSB). However, it makes sense from a bottleneck congestive planing mentality. Despite Vancouver being part of what is suppose to be a major port region and in need of proper transportation corridors, the Knight_Street_Bridge is a classic chokepoint.

https://www.richmond-news.com/local-news/work-on-knight-street-bridge-in-richmond-below-deck-as-well-7319230

Just because the Knight_Street_Bridge started out as a 4 lane joke, there immediately should have been 2 wide shoulders, which could have eventually become 2 extra bus lanes. Plus, there should have been a future provision to add 2 HOV lanes. Two wide sidewalks & 2 wide bike lanes. However, that would go against the congestive planning mentality of Vancouver & BC.

Indeed, by deliberately planning the KSB to be a 4 lane chokepoint and not building a new Fraser+Street+Bridge, there clearly was no interest to have proper dedicated bus lanes in that part of the Greater Vancouver Region. With so many inadequate, narrow bridges, there should be bus & HOV lane bridges to help improve regional transportation.

A regional express bus system or a rapid bus network requires dedicated lanes. The LGB should have 2 bus lanes & 2 HOV lanes in a tunnel near it. The Iron Bridge, OSB & KSB, all should have a 4 lane bus & HOV bridge next to them. That would allow for a rapid bus lane each way & a HOV lane each way.


https://jfdatalinks.blogspot.com/search?q=old+and+new+narrow+bridges