Showing posts sorted by date for query SkyTrain bridges. Sort by relevance Show all posts
Showing posts sorted by date for query SkyTrain bridges. Sort by relevance Show all posts

Sunday, April 5, 2026

Vancouverites have some of the longest commutes in Canada

 https://dailyhive.com/vancouver/vancouver-longest-commute-canada 

With most of the regional bridges being too narrow, there isn't enough space for proper express bus+lanes or BRT lanes. Plus, the first 2 Skytrain lines only have the potential to accommodate 5 car trains. The Canada (Embarrassment) Line wasn't designed to eventually have 5 car trains, only 2.5 car trains. Narrow bridges and short trains are all part of the symbolic reluctance towards having proper big city size infrastructure.


https://jfdatalinks.blogspot.com/search?q=bus+and+bike+bridge

Monday, March 30, 2026

Its Not Just About Bus and Bike Bridges

Bike bridges might not be able to totally solve the transportation mess that is Vancouver. However, its quite odd how Vancouver Cycling_Infrastructure is missing a crucial bit of transportation infrastructure. Indeed, many cities will build least 1 proper bike bridge. The Vancouver approach is to take traffic lanes away from existing bridges, or not even bother to build a bike bridge next to a congested bridge. 

https://en.wikipedia.org/wiki/List_of_crossings_of_the_Fraser_River#North_Arm There should have been several bus and bike bridges in just this section alone. 

 https://bicyclenetwork.com.au/newsroom/2024/08/08/striking-perth-bridge-crosses-key-construction-milestone Unfortunatly, such a nice bike bridge in Perth isn't allowed in backwards Vancouver. 

https://www.mainroads.wa.gov.au/projects-initiatives/all-projects/metropolitan/causeway-path/

https://www.wsp.com/en-ca/projects/perths-boorloo-bridge If you are visiting Perth from Vancouver, you might cry when you realize what WA can do, simply because its not influenced or limited by the backwards BC mentality or mind virus.

https://www.destinationperth.com.au/listing/boorloo-bridge/3706 Unlike in backwards Vancouver, many cities build bike bridges so that they don't have to remove traffic lanes.

https://dissingweitling.com/en/project/swan-river-causeway-bridge 

https://www.buildingfortomorrow.wa.gov.au/projects/boorloo-bridge Unfortunatly, properly building-for-tomorrow is much more difficult in backwards BC than it is in WA. 

bike+bridge in the right spot can make a huge difference. A bus+and+bike+bridge can be a huge improvement, especially in the case of Vancouver and the Greater Vancouver Region. 

The Arthur_Laing_BridgeOak_Street_BridgeKnight_Street_Bridge and the Queensborough_Bridge all could be improved simply by building a bus+and+bike+bridge next to them. These bridges are simply too narrow to accommodate 2 bus lanes, 2 wide bike lanes and 2 wide footpaths.

The narrow North_Arm_Bridge for the very short Canada Line trains, is another lost opportunity. There should have been 2 express bus lanes, since the little train doesn't run 24 hours. There should have been 2 wide bike lanes as well as 2 sidewalks. 

Perhaps it was designed to be in the tradition of the narrow SkyBridge between NW and Surrey. Unfortunately, the SkyBridge wasn't designed to help the old Pattullo Bridge by accommodating 2 bus lanes, 2 bike lanes and 2 sidewalks.

While the Pattullo_Bridge_replacement opened with 2 nice bike lanes and 2 footpaths, there was a deliberate decision not to open it with 2 bus lanes and 2 HOV lanes. Especially, no wide emergency lanes or wide shoulders. Its another instant classic BC bottleneck-chokepoint. 

Somehow the Metro_Vancouver_Regional_District still hasn't realized that a regional network of bus and bike bridges can really help the region's mostly narrow bridges. Plus, proper big city long trains. 

https://en.wikipedia.org/wiki/Expo_Line_(SkyTrain) Only started to run some 5 car trains in 2025.

https://en.wikipedia.org/wiki/Millennium_Line Still usually only 2 car train with the option to run 4 and the potential to eventually run 5 car trains.

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)#Canada_Line Despite a building cost cutting measure, this joke of a train and its short stations still could have been designed with enough level clearance to allow for 5 car trains eventually. Unfortunately, this line was designed to ultimately just have 2.5 car, 50m trains. Since 2009, this line is still only running 2 car trains. 

Multigenerational congestion planning is all by design in backwards BC.


https://jfdatalinks.blogspot.com/search?q=bike+bridges

Sunday, March 29, 2026

YVR-Canada Line and REM Train

 https://www.youtube.com/watch?v=a1ouk0VifwM&t=42s Even if the YVR-Canada Line had to initially be built as a symbolically small city train, urban transportation infrastructure can be designed in ways that can double or even triple capacity to meet future demand. Unfortunately, its very difficult to build anything in BC with significant future capacity in mind.

Ultimately, the YVR-Canada Line should have had level station clearances to eventually be able to accommodate 10 car trains. Unfortunately, in typical backwards BC planning the stations weren't even designed with enough level clearance to accommodate 5 car trains. The joke that is the Canada Line only has a level station clearance of 50m to eventually accommodate just a 2.5 car train. 

Most other cities actually build long stations to accommodate long trains right in the first place. Or, at least allow for enough level clearance so that the stations can eventually be doubled or tripled in length. 

The YVR-Canada Line should have started with the Vancouver & Richmond segment, then the Vancouver and Horseshoe+Bay+ferry+terminal segment. Then finally, the YVR to Delta and the Tsawwassen+ferry+terminal

The SkyTrain Stations in Greater Vancouver https://www.youtube.com/watch?v=6Qg78Bmf1fk

Unfortunately, proper big city transportation planning is very difficult to achieve in backwards BC. So much is watered down in Vancouver.


Montreal’s Biggest REM Expansion Yet https://www.youtube.com/watch?v=4G1oeIAfxDU&t=106s 

The Montreal REM https://www.youtube.com/watch?v=g9O6RzsXIqQ 

While the REM was designed to help the Metro, it should have the capability to be gradually expanded. Eventually, REM trains should be lengthened from 4 car trains to 6 and even 8 car trains. 

In contrast, every Skytrain line should have been designed with enough level future station clearance to eventually accommodate a train as long as a 152.5 (500 ft.) long Montreal Metro train. The first 2 Skytrain lines have 80m stations and the joke that is the Canada Line only has 50m stations. 

While the first 2 lines can accommodate 5 car trains, the C Line wasn't designed to accommodate 5 car trains. Just 2.5 car trains, someday. 

Despite there being such a symbolic push for Vancouver to keep having short trains, narrow bridges and stumpy buildings, things are gradually changing in backwards BC. The Vancouver or BC Mind Virus should have been challenged decades ago, but too many loud people wanted to perpetuate the, KEEP THINGS SMALL AND INDEQUATE agenda.

Given how most of the bridges in Greater Vancouver are so narrow, there isn't enough room for proper bus and HOV lanes, or even wide emergency lanes. One would think that at least the trains & stations would have been designed to eventually be doubled or tripled in length. But that would go against the mutigenerational congestive planning agenda. That's why there still is only a 3 lane LGB when there should have been at least a parallel bus, HOV and train tunnel. The Pattullo+Bridge replacement didn't open with 2 bus and 2 HOV lanes, not even wide shoulders or emergency lanes. NW really likes the congestive planning approach. Of course the new tunnel between Richmond and Delta won't have an additional provision for a train tube. This will also help to perpetuate the congestive transportation mandate. 

Fortunately, Selective_door_operation technology can eventually allow more sensible transportation planners to enable longer trains. 

https://en.wikipedia.org/wiki/Selective_door_operation#International_variations , https://www.youtube.com/watch?v=YdH5d1ZthmM 

This means that a 5 car Skytrain (85m) could eventually become a 7 car train, despite the 80m stations. 

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)_rolling_stock#Alstom_Mark_V Thus, an 80m train can become a 117m train.

A two car and 2.5 car (50m) train on the multibillion dollar Canada Line is so absurd and inept! With some slight station modifications, there could be a potential to eventually accommodate three, 20m cars at such short platforms. Then, once 3 car trains could become possible, its just a matter of having an extra 20m car at both ends of each train. A 5 car train of 100m is so much better than a 50m joke of a train. 

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)#Alstom_Mark_V_fleet 


https://jfdatalinks.blogspot.com/search?q=SkyTrain-Canada+Line

https://jfdatalinks.blogspot.com/search?q=REM

Monday, March 9, 2026

The narrow Pattullo Bridge Replacement

https://www.pattullobridgereplacement.ca/construction/current-works Its a nice 4 lane bottleneck choakpoint. There should have been a provision for a lower deck for bus lanes, HOV lanes and LRT, but that would help to alleviate some transportation congestion.

It wasn't designed with that much future capacity in mind, just like the absurd Canada+Line. The SkyTrain-Canada+Line is still only running 2 car trains. The New stal̕əw̓asəm Bridge is only 2 lanes each way. This is congestive urban planning in BC at its best. Narrow bridges and short trains are some of the best ways to symbolically demonstrate a reluctance to accommodate future growth capacity. 

People aren't suppose to wonder where all the money went over the past several generations, because it seems that not enough funds have gone towards proper big city infrastructure.

 

Saturday, January 31, 2026

Why Greater Toronto Has Several Skylines

 https://www.youtube.com/watch?v=eI9WJa9Q8dA 

Of course many large urban areas around the world have more than 1 or 2 skylines or tower clusters. 

For the longest time, no building in Vancouver or BC, was allowed to be as tall as the 1930s CIBC tower, which is now a stump.

https://www.blogto.com/city/2017/05/toronto-lost-observation-deck-commerce-court-north/

https://www.torontojourney416.com/canadian-bank-of-commerce-building/ 

https://www.25king.ca/the-history 

It wasn't until the early 1970s when stumpy, Vancouver allowed a building to be taller than the L.A. City Hall, or the Smith Tower in Seattle. 

The 1930s CIBC tower, the L.A. City Hall and the Smith Tower, would still be prominent towers in Vancouver, but stumps in their own cities. 

Despite Vancouver being divided by an inlet and a river, the city wasn't able to build a huge wall along Boundary Road. Thus, the KEEP THEM OUT agenda was a little thwarted. The various White city councils tried to do the next best thing. That was to symbolically impose various restrictions as a reluctance to think, plan and build on a BIG city scale. The time especially from 1960 to 2000 had predominantly White City Hall and its councils continually impose several overlapping restrictions. 

Since Vancouver can't control immigration or the movements of non-white people, keeping things small and backwards, means that less people will move there than to Toronto, Montreal, Calgary and Edmonton. However, with a mild winter climate, more and more people want to move to backwards BC, especially small-minded Vancouver and provincial Victoria. 

In spite of immigration and Multiculturalism, Vancouver was to perpetually promote its small scale agenda. 

While the first Skytrain line can finally run 5 car trains, the stations weren't designed to become long enough to eventually accomodate 9 car trains like the big city Montreal Metro has. 

The 2nd and 3rd Skytrain lines are still only running 2 car joke trains. Running 8-10 car trains is what a proper big city would do, but not backwards Vancouver. 

Narrow bridges provides strong symbolism of the cities narrow-mindedness. When bridges are too narrow, its difficult to have a proper express or rapid bus system. The reluctance to build parallel bus and HOV bridges helps to maintain the congestive planning approach that is vancouver and the Greater Region. 

Vancouver's refusal to build parallel bike bridges has meant that 2 lanes were removed from the Burrard Bridge, 1 lane from the Cambie Bridge and 2 lanes from the Granville Bridge. 

Keeping buildings symbolically short when compared to what scenic Sydney, Auckland, SF and Seattle allow, also helps to maintain Vancouver's reluctance to enter the big and tall urban scale. In fact, the scenic setting that Vancouver is in has been used as the main excuse to continually scale the city down. Yet, several scenic cities around the world are either able to have wider bridges, wider roads, longer trains or taller buildings. 

The world is mostly composed of non-white people. Canada has less than 1% of the world's population and stubborn Vancouver symbolically remains as a small provincial backwater on the Pacific Rim. 

https://centralparktower.com.au Unlike Perth, Vancouver forbids 50 story office towers and Brisbane, Sydney and Melbourne size residential towers. 

https://en.wikipedia.org/wiki/108_St_Georges_Terrace In fact, no office building in Vancouver has been permitted to have a 40th floor. However, since Burnaby and Surrey aren't under the restrictive controls of Vancouver, they will eventually allow office towers over 40 stories. 

Despite Australia having less people than Canada, Perth is allowed to have taller buildings, wider bridges and longer trains than Vancouver. Taller buildings, wider bridges and longer trains are even less likely in Halifax than whats in Brisbane or Queensland.

https://en.wikipedia.org/wiki/Q1_(building) To see buildings on a similar scale of what Brisbane allows, one has to get to Greater Toronto. Brisbane is allowed to have some buildings that would even be impressive in Melbourne and Sydney. 

While Montreal is allowed to have taller buildings than Vancouver, Montreal isn't allowed to have Sydney size towers. Especially not on the scale of what Melbourne and Toronto permit. 

Saturday, January 17, 2026

The Great SkyTrain upgrade (potential)

 https://www.youtube.com/watch?v=_D2CXdZ_4Ro 

Unfortunatly, the first 2 Skytrain lines were designed to only have 80m stations and trains. The 3rd line to YVR and Richmond was only designed to have 50m stations. In contrast, the Montreal Metro has stations long enough to accomodate 152.4m long trains. Thus, the greatest mistake was to not enable the Skytrain to eventually become a very high capacity train system. Combine that with mostly narrow bridges and roads in Greater Vancouver and you have the epitome of congestive urban planning. 

At least by late 2025 some of the new 5 car trains were out, along with some of the old 6 car little box trains on the 1st line. The 2nd and 3rd lines are still running 2 car joke trains, but that symbolically fits right in with the, KEEP BC SMALL AND BACKWARDS mentality. 

A proper big city long-term plan would have been to allow for 10 car trains, with at least 5-6 car trains at the start when each line opened.

Tuesday, December 23, 2025

A Six-hour SkyTrain shutdown caps chaotic pre-Christmas morning in Metro Vancouver

 https://dailyhive.com/vancouver/bridges-skytrain-shutdown-chaos-december-23-2025 

There is nothing like short trains that stop running and mostly narrow bridges which prevents a proper and efficient regional rapid bus network.

Saturday, November 22, 2025

Some Canada Mega-projects Under Construction

 https://www.youtube.com/watch?v=kwsOVZ-j7hg 

Oakridge_Park is on a much smaller scale than MetrotownBrentwood and Lougheed. It will especially be on a much smaller scale than Parramatta in NSW. 

Unfortunatly, the Oakridge-41st_Avenue_station was only designed to have 50m platforms, when it should have been at least 100m. Thus, the utter foolishness has meant that instead of allowing for a future level station clearance to accomodate 5 car trains, the Canada (embassament) Line was only designed to just have 2.5 car trains. While its extremely short stations might have been disguised as a cost saving measurer, there didn't seem to be any key people onboard to make sure that it could eventually become a proper big city train line. Its sad that a line which opened in 2009 is still only running 2 car trains. While the 2.5 car configuration is still a joke of a train, at least half of an extra coach-length is better than nothing. Plus, there should have been extra cars ordered by now so at least during the very busy times the trains could be operating at 1 minute headways. Unfortunatly, this goes against the Vancouver & BC congestion planning mentality.

Despite being built several years after the Sydney_Harbour_Bridge, the joke that is the Pattullo_Bridge was designed to only have 4 narrow lanes & only 1 sidewalk. Of course the replacement_bridge will only open with 2 lanes each way. It was as if someone really wanted to make sure that there won't be 2 bus lanes and no HOV lanes when the bridge opens. While the new bridge is designed to be expanded from a 4 lane joke to eventually having 6 lanes, it still won't be wide enough to accomodate 2 HOV lanes as well as 2 bus lanes. Of course the new bridge won't have any emergency lanes, just like the old bridge. However, it will have 2 bike lanes and 2 sidewalks. https://www.globalhighways.com/news/pattullo-bridge-completion-end-year Its only fitting that in backwards BC this new bridge wouldn't be designed to eventually have a lower deck to accomodate 2 bus lanes and 2 LRT tracks. 

If the planners were afraid to symbolically have a wide bridge between NW and Surrey, the old Pattullo_Bridge should have been designed to eventually have a lower deck for trams, trucks and busses. Even when the SkyBridge between NW and Surrey opened in 1990, it wasn't designed to have any bus lanes or emergency vehicle lanes and especially, no bike and footpaths. 

Is Vancouver the best city in North America? (2019) https://www.youtube.com/watch?v=P8dmVUrNt38

 One of the biggest mistakes in Vancouver & SW BC is to have short trains combined with mostly narrow bridges. Thus, the region doesn't get to have long, high capacity trains and there isn't a proper regional network of bus-bridges. The refusal to twin most of the bridges means that it's almost impossible to have a proper and efficient regional network of rapid-bus and HOV lanes.  

While Montreal built the REM to augment their long-train Metro system, Vancouver should have allowed for enough clearance to eventually have 500 foot long trains. 80m-50m Skytrain stations are going to become inadequate, when there should have been a 152.4m provision so that the trains could eventually become as long as the ones on the Montreal Metro. 

Is Regional Rail in the Future of British Columbia? https://www.youtube.com/watch?v=1PeIOVy6fFc

Monday, November 3, 2025

Vancouver's Next Generation Streetcar Network Plan

 https://www.youtube.com/watch?v=VqDGu8Elysg 

Ironically, Vancouver should have been one of the first cities in the 1950s to state that streetcars & tram trains will still be essential in the far future. Especially, when most of the roads & bridges are so damn narrow, now it's difficult to have proper bus lanes. 



Canada Line SkyTrain Ride Richmond–Brighouse to Waterfront Station https://www.youtube.com/watch?v=tNQxWYtyoQY

Monday, October 27, 2025

Honolulu’s Skyline Rail Expands to West Honolulu, and to a New Airport Station

 https://www.travelandtourworld.com/news/article/honolulus-skyline-rail-expands-to-west-honolulu-bringing-faster-more-sustainable-public-transit-to-oahu-with-a-new-airport-station 

Even if the widest parts of the H-1 could be 10 or 12 lanes, it would still get plugged up. Nevertheless, being from Vancouver, it's quite impressive to see such a wide H-1 by the airport. If you visit Vancouver from Hawaii, you might think that Vancouver is a big city like Sydney, SF or Seattle. Then you discover that the roads & bridges are much narrower than what's in those cities. The real big surprise is that Vancouver not only has shorter trains than Sydney, SF & Seattle, but even Edmonton. Fortunately, the Skyline to the airport isn't a 2 car joke of a train like Vancouver's airport line is.

https://honolulutransit.org/about/route-map , https://en.wikipedia.org/wiki/Skyline_(Honolulu)#Route

https://www.honolulu.gov/dts/skyline


The Airport Segment.

https://en.wikipedia.org/wiki/Skyline_(Honolulu)#Segment_2:_Airport 

https://en.wikipedia.org/wiki/Lelepaua_station If only Vancouver's line to the airport could have opened with 4 car trains, then with Selective_door_operation, eventually 6 car trains. Unfortunatly, backwards Vancouver has been stuck with a 2 car YVR train since 2009, but it has the potential to become a 2.5 car joke of a train, someday.  


Downtown Honolulu.

https://en.wikipedia.org/wiki/Skyline_(Honolulu)#Segment_3:_City_Center 

https://en.wikipedia.org/wiki/Skyline_(Honolulu)#Ala_Moana_extension 


https://en.wikipedia.org/wiki/Skyline_(Honolulu)#Rolling_stock "The line uses 256 ft (78 m) four-car train sets, each with the capacity to carry nearly 800 passengers..."  "Each car is 64 ft (20 m) long, weighs 72,000 lb (33,000 kg), and has 36 seats with a listed total capacity of 195 people, and sits on standard-gauge (1,435 mm) rails." 

While the Skyline cars are similar in length to the YVR-Canada-Line cars, they are of a heavier construction. Plus, the trains are twice as long as any on the embarrassingly short Canada+Line trains.

While it took a long time to get the Skyline to the airport, at least the stations were all initially built to accommodate 4 car trains. Unfortunatly, the joke that is the SkyTrain-Canada+Line is still only running 2 car trains and wasn't designed to eventually have 5 car trains. Its difficult to understand why the joke-line stations are only designed to accommodate a 2.5 car train, someday.

Honolulu like Brisbane, are very far away from the Vancouver Mind Virus (VMV) and much warmer. Thus, they are able to have longer trains to the airport, because they can build on a proper big city scale.  


https://jfdatalinks.blogspot.com/search?q=Brisbane+Airport+Railway+Line 

https://jfdatalinks.blogspot.com/search?q=the+airport+train

Monday, October 13, 2025

Majority polled in Calgary and Edmonton are unhappy with the pace of population growth

 https://www.cbc.ca/news/canada/calgary/too-much-too-fast-majority-polled-in-calgary-edmonton-unhappy-with-pace-of-population-growth-9.6935121 

If you are visiting Vancouver or Victoria from Calgary or Edmonton, you will be shocked as to how narrow most of the bridges are in Greater Vancouver and Victoria. Edmonton was wise in the 1970s to have 125 m long underground LRT stations. Foolish Vancouver opted to only have 80 m stations on its first 2 lines and an absurd 50 m for the 3rd line. 

https://en.wikipedia.org/wiki/Green_Line_(Calgary) , https://www.calgary.ca/green-line.html 

https://www.calgarytransit.com/plans---projects/lrt/green-line.html

https://engage.calgary.ca/greenline/UndergroundStations Fortunatly, any underground stations in Calgary will be closer in length to that of the Edmonton LRT and not backwards Vancouver.

https://www.railjournal.com/regions/north-america/tunnel-preferred-for-calgary-lrt-green-line/

https://www.tunnelsandtunnelling.com/news/calgary-city-council-approves-green-line-lrt-construction/?cf-view

https://www.calgary.ca/green-line/stations.html

https://www.tunnelsandtunnelling.com/news/calgary-city-council-approves-green-line-lrt-construction/?cf-view 

The main roads and bridges in urban parts of Alberta are allowed to be wider than their counterparts in backwards BC. So while people in the urban parts of Alberta are concerned or even angry about rapid growth, at least Alberta can easily build more urban infrastructure. That's because Albertal isn't affect by the (unofficial) BC Mind Virus (BCMV). 

A timely example is a new bridge between Surrey & NW. Despite Surrey being expected to become the largest city in BC, the new bridge will only open with 4 lanes. No 3rd or 4th lane each way for busses, HOVs and trucks. Thus, all the road traffic at either end is funneled into just 2 lanes each way. Plus, there are no breakdown or emergency lane, just like the old bridge.   

While this new bridge can eventually be widened to 6 lanes, there is no provision for a lower deck for LRT, busses and trucks. Despite SW BC being a seaport area, trucks are funneled onto mostly narrow bridges. There has been a lack of interest to build bus bridges next to almost all of the bridges in Greater Vancouver. Yet, there is a Half-A$$ED attempt to have a better regional express bus network. This regional Rapid Bus attempt will always be a joke, unless a series of bus bridges are built. The Half-A$$ED approach is to try to have bus lanes on 4 to 6 lane bridges. Designating 2 bus lanes would reduce the narrow bridges to only 1 or 2 lanes each way for general traffic in what is suppose to be a major seaport and urban area.   

Most of the worlds population is non-white and for a big part of the history of BC, there has been a refusal to build up bigtime infrastructure for everyone. While some Albertains might wish that there was a wall built around their province or a force-field like out of Star Trek, BC is almost pretending like there is. Thus, the keep things small and backwards mentality. 

Several decades ago, BC implemented a symbolic slow-growth approach. Despite BC not having any control over immigration, or trying to establish an internal passport & checkpoint system, to KEEP PEOPLE OUT, it opted for the next best thing. Stunt or scale back the urban infrastructure to project a strong symbolic reluctance to growth and thinking big. 

When you realize how much larger things are allowed to be in Alberta, Washington State and even Western Australia & compare them to watered down BC, you see quite a difference. Despite BC & Canada in general, being multicultural, BCs cities keep finding ways to water the scale of things down. Canada has yet to have even 1% of the world's population, despite its size.  

While there are good arguments to occasionally slowdown immigration, that can eventually become problematic, just like too much immigration. Even in the 2020s, some people in the former White colonial parts of the world still wish that Canada & Australia, etc., could be a White Man's paradise. However, that seems so impractical on a planet that mostly has a non white population. 

https://humanrights.ca/story/chinese-head-tax-and-chinese-exclusion-act

https://thecanadianencyclopedia.ca/en/article/chinese-head-tax-in-canada 

https://royalalbertamuseum.ca/blog/chinese-head-tax-george-yees-story 

https://www.musee-mccord-stewart.ca/en/blog/chinese-exclusion-act/

https://parks.canada.ca/culture/designation/evenement-event/exclusion-chinois-chinese

https://www.canada.ca/en/canadian-heritage/campaigns/asian-heritage-month/important-events.html

https://stanleyparkvan.com/stanley-park-van-monument-komagata-maru.html

https://vancouver.citynews.ca/2022/10/05/vancouver-komagata-maru-memorial

https://vancouver.citynews.ca/2023/01/30/vancouver-komagata-maru-memorial-vandalism/

Even if Alberta were to eventually become its own country, it would be extremely unlikely that it could ever impose a White Man's Paradise Agenda. The same could be stated for backwards BC. However, something very peculiar has been happening in BC for several generations. 

Several BC cities and municipalities play off each other with various slow-growth agendas. Vancouver being one of the most restrictive & backwards on the the planet. Somehow the legitimate anti freeway fears of the 1960s & 70s didn't get the city & region to still build a series of bus & HOV bridges. Plus, a long-term, high capacity urban rail system.

While Montreal planned for 152.4 m stations to accomodate 9 car trains, backwards Vancouver only built 80 m Skytrain stations for the first 2 lines. Then to top that, was a plan to build a line to Richmond with only enough level clearance for 50 m stations. The 1st line only started to run 5 car trains in 2025. Eventually, the 2nd line will also have 5 car trains. However, the line to the airport was deliberately designed not to have 5 car trains. Just a Half-A$$ED 2.5 car train, someday. WTH?

For Greater Vancouver to mostly have narrow bridges, one would think the all the stations could ultimately be at least as long as a Montreal Metro train station. Indeed, Greater Vancouver should have built for 10 car trains, but will only have 5 car trains on the 1st  two lines & a 2.5 car joke of a train on the 3rd line. As of 2025, the 2nd & 3rd lines are still only running 2 car trains. Such a great way to symbolically show the resistance to eventually link YVR to both of the main BC ferry terminals. 

The inadequate 3 lane Lion Bridge still has no bus & HOV tunnels near it. Urban parts of Australia never seemed to have a similar reluctance to build tunnels as does backwards Vancouver. Tunnels for Montreal & Seattle aren't a problem either. At least BC is slated to have a new and improved tunnel by 2030, that's only a couple of generations late.   

Oh, if only people would stop moving to BC, especially Vancouver & Victoria. Well, that's not the case, its just that various BC cities want to only build urban infrastructure that is inadequate. Despite the frustrations that some people have in Alberta, at lest wider bridges, longer trains & taller buildings are allowed there. This watering things down in BC approach is symbolically indicative to refuse to properly build for a growing population. 

Surrey should have already had at least 1 hospital the size of VGH. At least Surrey like Burnaby, can build up taller in what is still mostly a mountain wilderness province. 

BC is a long way from New England & Southern Quebec. The restrictive urban planning measures in Greater Vancouver keep preventing it from becoming a proper big metropolitan area like Greater Boston and Montreal. 

Calgary and Edmonton each should have hand an airport+line by now.

https://en.wikipedia.org/wiki/Green_Line_(MBTA) Calgary will have its own version of a Green Line, eventually. https://jfdatalinks.blogspot.com/search?q=Calgary+Green+Line

Thursday, September 11, 2025

Metro Vancouver taxpayers left in the dark over ballooning sewage plant costs

 https://www.nsnews.com/economy-law-politics/kirk-lapointe-metro-vancouver-taxpayers-left-in-the-dark-over-ballooning-sewage-plant-costs-11198245

It's sad and unfortunate that so much money was diverted and wasted on an over-budget $HIT-box. Yet, no bus bridges or bus tunnels have been built to the North Shore, so far.  At least one of the SkyTrain lines should have been extended to the North Shore at least a dozen years ago. 


https://jfdatalinks.blogspot.com/search?q=North+Shore

Friday, August 29, 2025

Modular school additions a Band-Aid for classroom crunch in Surrey, BC

 https://globalnews.ca/news/11355992/modular-school-additions-no-solution-classroom-crunch-surrey-parent-leader/

Despite Surrey eventually becoming the most populated city in BC, it's still been scaled back for most of its history. It sure would have been nice if the SkyTrain between Vancouver & Surrey had 10 car trains. It's been tough enough just to finally start having some 5 car trains.

https://www.translink.ca/plans-and-projects/strategies-plans-and-guidelines/area-transport-planning/burrard-peninsula 

Unfortunatly, transportation connections between the Burrard_Peninsula and Surrey are too few and that's by design.

Fortunately, the BC mentality of limiting infrastructure hasn't been adopted in PortlandSeattleCalgaryEdmonton & Winnipeg. Thus, they are all able to have a lot more bridges. One can clearly see that a lot more funding has been properly applied in several cities. However, Greater Vancouver has a lot less bridges than many other urban areas. Short trains are expected or forced to do the job of a proper big city, long train. Most of the regional bridges are so narrow, there isn't enough space for 2 bus lanes & 2 HOV lanes. 

Then, there is a multi-generational refusal to build a regional network of bus & HOV bridges. Even the (2030) tunnel wasn't designed to have 2 HOV lanes & especially a double track train tunnel component. At lest the (2030) tunnel will have 2 bus lanes & 3 general lanes each way.   

https://www.peacearchnews.com/local-news/surrey-mayor-looks-to-repair-lack-of-healthcare-services-in-this-city-7975235  

Of course the Surrey+Memorial+Hospital wasn't designed with a series of 5-10 story buildings with a capability to eventually add another 10-15 floors.

https://www.surreynowleader.com/local-news/surrey-mayor-aghast-at-citys-dearth-of-hospital-beds-compared-to-vancouver-7873315

"Despite having a population of similar size to the City of Vancouver, Surrey has 671 hospital beds compared to Vancouver’s 2,572. Even with 168 beds slated for the new Cloverdale hospital that is under construction, Vancouver will still have triple the number of hospital beds for a population of similar size..." https://www.surrey.ca/news-events/news/surrey-mayor-proposes-health-care-administrator-address-inequity  

https://globalnews.ca/news/10342083/surrey-healthcare-crisis-hospital-capacity/ 

https://www.cbc.ca/news/canada/british-columbia/surrey-memorial-hospital-emergency-department-crisis-doctors-letter-1.7325687

Thursday, August 7, 2025

YVR-Canada Line

 https://www.yvr.ca/en/passengers/transportation/public-transportation 

Even if the excuse of a limited budget is used at the time, the YVR-Canada-Line should have been designed with at least roughed-in 100 m stations, right from the start, with enough clearance to eventually become 160 m. 

https://thecanadaline.com/station-guides/yvr-airport 

Its like there was no concept to eventually connect both ferry terminals with the YVR-Canada-Line.

https://www.translink.ca/schedules-and-maps/skytrain?page=1#canada-line 

Indeed, the YVR-Canada-Line should have been envisioned to be a long-range high capacity rapid transit corridor. A 40-50 m joke of a train can't do the job of a 150-160 m train. 

https://dailyhive.com/vancouver/canada-line-skytrain

Short trains and mostly narrow bridges are a multigenerational way of life that was planned for SW BC. 

https://dailyhive.com/vancouver/north-shore-burrard-inlet-vancouver-third-crossing-bridge

Who knows where so much of the money went, because it sure didn't go towards proper big city size infrastructure. 

https://dailyhive.com/vancouver/skytrain-future-station-locations

If ever some serious improvements can be made to the Canada+Line, it should be renamed, the YVR-Canada-Line or SkyTrain-Canada+Line. With some proper upgrades it could almost become like a proper airport+line

Saturday, July 12, 2025

Vancouver's forgotten streetcars and interurban trams

https://www.vancouverisawesome.com/transportation-old/interurban-streetcar-hydrogen-rail-line-fraser-valley-bc-1942783

Fortunately, Toronto, NO, SF and Melbourne never got rid of all their streetcar and tram lines.

https://dailyhive.com/vancouver/downtown-vancouver-false-creek-streetcar-route-map

While backwards Vancouver wanted to be among the first cities to get rid of them, Vancouver will likely be one of the last cities to bring them back.

https://viewpointvancouver.ca/2021/04/06/a-bump-in-the-road-kits-points-hidden-streetcar-line/

Atlanta, SD, LA, Edmonton, Calgary, Seattle & Portland brought back some of their trollies in the form of modern LRT or tram-trains.

https://montecristomagazine.com/community/vancouvers-forgotten-streetcars

The sad irony is that Vancouver, Burnaby & NW really could have benefitted from following the Toronto, SF and Melbourne examples. 

https://www.vancouverisawesome.com/history/last-ride-oak-streetcar-vancouver-1937040

https://www.facebook.com/groups/128486813979056/posts/1968090176685368

 https://maps.nicholsonroad.com/bcer/

https://humantransit.org/2010/02/vancouver-the-almost-perfect-grid.html

There used too be a streetcar route along Robson St., Denman St. & Davie St. A revived version of this could provide a nice downtown transit loop. However, that would go against the backwards mentality of Vancouver. Fortunately, the Vancouver mentality never made it to Atlanta & Dallas.

https://en.wikipedia.org/wiki/Atlanta_Streetcar#Downtown_Loop_route_funded

https://en.wikipedia.org/wiki/Dallas_Streetcar

Unfortunatly, Vancouver & BC are all about congestive planning.

https://www.cbc.ca/news/canada/british-columbia/2026-fifa-world-cup-vancouver-1.7559067

With less than a year to go, its impossible to revive any streetcar lines, because that can take 5-10 years. There isn't even a network of regional bus bridges. Such inept transportation planning means that busses have to squeeze onto bridges that are mostly just 2 lanes each way. 

https://www.cbc.ca/news/canada/british-columbia/bc-rising-costs-fifa-2026-world-cup-1.7573669

Despite the first SkyTrain line opening in 1985, it took until 2025 to start having5 car trains. The 2nd & 3rd lines are still only running 2 car trains.

https://www.ctvnews.ca/vancouver/article/vancouver-short-on-hotel-rooms-silent-on-safety-costs-for-2026-world-cup/

Of course the city is decades behind in keeping up with having enough hotel rooms.

https://www.cbc.ca/news/canada/british-columbia/vancouver-hotel-shortage-2026-world-cup-1.7117696

https://vancouverfwc26.ca 

https://www.fifa.com/en/tournaments/mens/worldcup/canadamexicousa2026/articles/vancouver-host-seven-matches-canada-stadium-bc-place


https://jfdatalinks.blogspot.com/search?q=Trams-Trains+and+Streetcars

Friday, July 11, 2025

How Bike Lanes have affected Vancouver's urban infrastructure

https://www.youtube.com/watch?v=LvkifuIjq9I The BSB was a 6 lane crossing that even had a provision for a lower deck intended for streetcars. Eventually, 2 lanes were removed & the lower deck was never completed. However, Vancouver was unable to prevent Seattle & Portland from reviving some of their streetcar routes.

The problem isn't bike lanes, it's the lack of interest to build a proper regional network of bus & bike bridges. Thus, if a proper bike bridge was built next to the Burrard+Street+Bridge, then 2 of its 6 lanes could have been for buses or at least HOV lanes. The lower deck could have still been for streetcars or tram-trains going between Vancouver & Richmond. The irony of backwards Vancouver is that it was one of the first cities to get rid of its streetcars & will likely be one of the last to bring them back.

The Fraser River Tunnel Project https://www.youtube.com/watch?v=NWhHJWKa6CQ Unfortunatly, this will still be a chokepoint or congested crossing.

Of course the new Richmond-Delta+Tunnel wasn't designed to be part of a rail link between the airport and the ferry terminal. There should have been 2 HOV lanes, as well as 2 bus lanes, but that would be a big-city 10 lane crossing. Instead, just an 8 lane tunnel with no train component. Eventually, a train and HOV bridge or tunnel will have to be built next to it. 

At least the first SkyTrain line can now have 5 car trains. However, the 2 car joke of a train still exists between Vancouver & Coquitlam, as well as between Vancouver & Richmond. The Montreal Metro can have 9 car trains and BART in SF can have 10 car trains. Such things are possible because they don't have a congestive BC panning mentality.


https://jfdatalinks.blogspot.com/search?q=Bike+Lanes

Thursday, July 10, 2025

SkyTrain enters its Mark V era with 5 car trains

 https://www.vancouverisawesome.com/local-news/skytrain-mark-v-first-new-train-service-translink-expo-line-july-2025-10927323

With such a high capital construction cost, its foolish and very short sighted that Vancouver & BC never allowed for enough clearance to eventually have 10 car trains.

https://dailyhive.com/vancouver/mark-v-skytrain-train-enter-service-design-translink

At least the first 2 SkyTrain lines have stations that can accomodate a 5 car train. Unfortunatly, the joke that is the Canada embassament Line never allowed enough level clearance for 5 car trains, only a 2.5 car train. Combine short trains with mostly narrow bridges and no interest to build a series of bus-bridges and you have a fine example of congestive planning. Of course no one seems to know where the funds that should have gone towards big city infrastructure went. 

Thursday, June 26, 2025

SkyTrain's Commercial-Broadway Station escalators fully reopen after replacement work

 https://dailyhive.com/vancouver/skytrain-commercial-broadway-station-escalators-fully-reopen

This is going to be a major transit intersection, whenever the east-west line from Coquitlam to UBC is completed. Especially when the line from downtown Vancouver to Langley is completed. Unfortunatly, only the Expo_Line will have 5 car trains at some point in 2025. 

The Millennium_Line will try to only run a 2 car joke of a train for as long as possible. At least there is a potential to eventually have 5 car trains.

Unfortunatly, the joke that is the Canada_Line was deliberately designed to have stations that can only accomodate 2 2.5 car train, not a 5 car train.

Considering that Greater Vancouver mostly has narrow roads & bridges, one would think that the trains would be the longest in Canada, not the shortest. 

Saturday, June 21, 2025

The Pattullo Bridge replacement project

 https://dailyhive.com/vancouver/pattullo-bridge-new-indigenous-renaming-art

While it's great to have a new name for the new bridge, there should have been a few more bridges between Surrey, NW, Coquitlam & Port Coquitlam.

https://604now.com/pattullo-bridge-new-indigenous-name

Another lost opportunity for backwards BC. This new bridge should have opened with 6 lanes, plus have at least 2 wide shoulders for future capacity. Then there could have been 2 HOV lanes, as well as 4 general lanes. There also should have been a lower deck for something similar to what the Tilikum_Crossing has. https://trimet.org/tilikum

Such a lower deck not only could have provided 2 sidewalks & 2 bike paths, but a provision for 2 streetcar or tram-train tracks and even 2 separated SkyTrain tracks. Instead, all the traffic will be crammed into just 2 lanes each way with no bus & no HOV lanes & especially no breakdown lanes. In the future, the existing 2 track Skybridge between Surrey & NW might not be adequate. People from all over the world should study the BC bottleneck planning mentality & avoid such bad planning at all costs.

It is foolish for the most urban part of BC to not have wide or double deck bridges. Unfortunatly, this new 4 lane bridge wasn't designed to have 2 bus & 2 HOV lanes & no provision for at least 2 train tracks. At least it will have more than 1 sidewalk & 1 more lane than the LGB and even a safety divider. 

Despite Surrey eventually becoming the most populous city in backwater BC, no 2 track train bridge like the Tilikum has been allowed to be built in backwards BC. https://trimet.org/tilikum/#about

https://trimet.org/tilikum/#:~:text=Bus%20lines%20FX2%2DDivision%2C%209,both%20sides%20of%20the%20river.


https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge+replacement

https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge

Thursday, June 12, 2025

Vancouver never properly planned for High Density Mass Transit like Toronto and Montreal did

 https://cityhallwatch.wordpress.com/2025/06/12/cartoon-ucs57-vancouver-plans-for-high-density-1-mass-transit/

1950s Toronto and 1960s Montreal were able to have 152.5m or 500 foot long TTC subway and STM metro stations. The 1970s underground Edmonton LRT stations were built to be 120m-130m long, because unlike backwards Vancouver, Edmonton planned for significant future capacity, just like Seattle would also do. Unfortunatly, backwards Vancouver only has 80m stations for the first 2 Skytrain stations. The 3rd line or the Canada (embasement) Line, only has 50m short stations. Vancouver has had generations of watered down infrastructure. Who knows where so much of the money went, because it sure didn't go towards proper big city trains & express bus bridges.