Showing posts sorted by relevance for query Knight Street. Sort by date Show all posts
Showing posts sorted by relevance for query Knight Street. Sort by date Show all posts

Thursday, April 3, 2025

From the old and inadequate Fraser Street Bridge to the inadequate KSB

Somewhere in between 1950 & 1960, the old Fraser_Street_Bridge (FSB) should have been replaced with a new 4 lane bridge, with 2 very wide sidewalks for bikes & a future provision for 2 bus lanes. Vancouver needs a street and transit connection with No. 5 Rd. in Richmond. Unfortunatly, backwards Vancouver has always been a city without a proper big city transportation vision.

https://evelazarus.com/the-fraser-street-swing-span-bridge

https://en.wikipedia.org/wiki/Fraser_Street_Bridge_(1894)#Provincial_government_headache

https://www.richmond-news.com/local-news/photos-and-video-was-this-the-unluckiest-bridge-between-richmond-and-vancouver-4475444

https://search.nbca.unbc.ca/index.php/fraser-st-road-bridge-in-vancouver-bc-1 In the late 1800s, just being able to have a bridge roadway width of 2 wagon-roads in backwater BC was amazing. Then, decades & even several generations later, any BC bridge that could provide 2 wagon-roads each way was even more amazing. 

https://structurae.net/en/structures/fraser-avenue-street-bridge

As usual, Vancouver & BC lost & messed up an opportunity to have 2 great new bridges.

https://structurae.net/en/structures/knight-street-bridge (KSB)

https://evelazarus.com/the-knight-street-bridge-part-2

Once again, the lack of a proper big city vision resulted in the inadequate design for the 4 lane Knight+Street+Bridge (KSB). However, it makes sense from a bottleneck congestive planing mentality. Despite Vancouver being part of what is suppose to be a major port region and in need of proper transportation corridors, the Knight_Street_Bridge is a classic chokepoint.

https://www.richmond-news.com/local-news/work-on-knight-street-bridge-in-richmond-below-deck-as-well-7319230

Just because the Knight_Street_Bridge started out as a 4 lane joke, there immediately should have been 2 wide shoulders, which could have eventually become 2 extra bus lanes. Plus, there should have been a future provision to add 2 HOV lanes. Two wide sidewalks & 2 wide bike lanes. However, that would go against the congestive planning mentality of Vancouver & BC.

Indeed, by deliberately planning the KSB to be a 4 lane chokepoint and not building a new Fraser+Street+Bridge, there clearly was no interest to have proper dedicated bus lanes in that part of the Greater Vancouver Region. With so many inadequate, narrow bridges, there should be bus & HOV lane bridges to help improve regional transportation.

A regional express bus system or a rapid bus network requires dedicated lanes. The LGB should have 2 bus lanes & 2 HOV lanes in a tunnel near it. The Iron Bridge, OSB & KSB, all should have a 4 lane bus & HOV bridge next to them. That would allow for a rapid bus lane each way & a HOV lane each way.


https://jfdatalinks.blogspot.com/search?q=old+and+new+narrow+bridges

Friday, November 1, 2024

Vancouver's narrow bridges over the Fraser River

 https://dailyhive.com/vancouver/vancouver-knight-street-video-concern

The Knight_Street_Bridge (KSB) was deliberately designed to not have a couple of emergency lanes. No truck lanes and especially no bus and HOV lanes. No proper bike lanes, just 2 narrow sidewalks. 

https://en.wikipedia.org/wiki/Knight_Street_Bridge#Infrastructure

Thus, the Knight_Street_Bridge is one of the best examples of BC bottleneck planning.

https://images.drivebc.ca/bchighwaycam/pub/html/www/695.html

The Knight_Street_Bridge is so narrow and inept, that a new HOV, bus and bike bridge should be built right next to it. The Knight+Street+Bridge is only 4 lanes wide in the middle, so a parallel 4 lane bridge would greatly improve things. One lane on and one lane off between the twin bridge crossing and Marine-Drive. Then the main 3 lanes each way onto the 6 lanes of Knight+Street up to Kingsway. 


The incredibly narrow Fraser_Street_Bridge (FSB) was torn down and should have been rebuilt or replaced by the 1970s, especially by the 1990s. The city and the Provincial_government didn't seem to understand that a new bridge there would be great as a HOV, bus and bike bridge. A couple of wide emergency lanes would have made it a lot easier for emergency vehicles to go between Vancouver & Richmond.


Despite Oak Street being 6 lanes wide, the BC bottleneck mentality wanted to force everything into a 4 lane Oak_Street_Bridge (OSB). Even if there was no concept to have bus lanes in the late 1950s, the OSB should have had 6 lanes, plus 2 wide emergency lanes and 2 wide sidewalks.

https://en.wikipedia.org/wiki/Oak_Street_Bridge#Infrastructure

By now, there should have been a HOV, bus & bike bridge built next to the narrow & inept Oak_Street_Bridge


The Arthur-Laing-Bridge (ALB) is only 2 lanes each way. https://en.wikipedia.org/wiki/Arthur_Laing_Bridge


The multigenerational inept Vancouver & BC planning agenda is all about creating more congestion. 

Fortunately, the 8 lane Champlain+Bridge also has 2 passenger train tracks. This was possible, because Montreal and Quebec don't have anything like the Vancouver & BC mentality to hinder them.

Why have a provision for 10 car SkyTrains, when a 2-4 car joke of a train can enable more congestion? That's the backward BC way.

It's amazing that the Montreal+Metro was designed to have 9 car trains, even back in the 1960s. Montreal and Quebec in general, just don't have anything like a backwater BC mentally to contend with. Quebec isn't just able to do more because it has more people than BC, Quebec has been able to accomplish more because it isn't BC.

https://vancouver.ca/streets-transportation/bridges-and-structures.aspx

Despite being a newer crossing, the Arthur+Laing+Bridge was only designed to have 4 lanes, just like the older Oak+Street+Bridge. Both bridges should have been built with very wide shoulders, so that they eventually could have provided 6 lanes. Plus, both bridges should have had very wide sidewalks. However, that goes against the chokepoint planning mentality.

Friday, January 24, 2025

Clark and Knight Street Corridor

 https://en.wikipedia.org/wiki/Knight_Street 

https://council.vancouver.ca/20050329/tt5App1.pdf

The Knight+Street+Corridor mostly has the potential to provide 3 lanes each way. However, the middle of the Knight_Street_Bridge and the Clark Drive diversion only has 2 lanes each way. However, by 12th Avenue, Clark Drive would be 6_lanes_wide up to Hastings Street.


https://jfdatalinks.blogspot.com/search?q=Knight+Street

Monday, January 13, 2025

Knight Street Bridge

Despite the Knight_Street_Bridge opening in the 1970s for a seaport city, it wasn't designed to have 2 bus lanes, 2 HOV lanes & 2 truck lanes or even 2 emergency lanes. It was hardly designed with any future corridor-capacity in mind. Such narrow sidewalks that there should have been a bus & bike bridge built next to it decades ago. 

https://trafficcams.vancouver.ca/knightMarineBridge.htm

https://images.drivebc.ca/bchighwaycam/pub/html/www/695.html

https://trafficcams.vancouver.ca/knight.htm

https://buzzer.translink.ca/2024/06/knight-street-bridge-the-first-bridge-repaved-with-innovative-material


https://jfdatalinks.blogspot.com/search?q=Knight+Street+Bridge

Monday, August 12, 2024

Several Vancouver narrow bridge issues

 https://dailyhive.com/vancouver/metro-vancouver-bridge-cyclist-wire-allegations

Someone might have been very angry with bike people and not with car, bus & truck people. The real problem is that so much of the older BC infrastructure just wasn't designed to be more of a multi-modal crossing. The+Lion+Bridge+and+The+Iron+Bridge have no rail rapid transit crossings to help them.

The Ironworkers-Bridge is so narrow for a highway bridge in that location & wasn't designed for substantial future capacity. When it was initially designed in the 1950s, there was no concept to have 2 bus lanes, 2 HOV lanes, 2 truck lanes & 2 emergency lanes for a port city. Plus, at least 2 general traffic lanes each way & a provision for 2 train tracks. Thus, the 6 lane bridge is so overwhelmed, because it just can't do the job of an 8-10 lane wide bridge. While the Iron Bridge has 2 improved bike+lanes, they are part of the sidewalks.  

The former 8 lane Granville+Street will have 6 lanes, while the  & Oak+Street only has 4 lanes. The inadequate Oak+Street+Bridge (OSB) should have opened with at least 8 lanes, instead of only 4. Plus, 2 wide emergency lanes & 2 wide sidewalks. There still should be a new southbound OS Bridge, but the city would be against it. A narrow 4 lane bridge just doesn't have the space & capacity for 2 express bus lanes, 2 HOV & 2 truck lanes. Apparently, it's better to just funnel everything into only 2 lanes each way.  

The OSB should be twinned or replace with something like the Samuel-De_Champlain_Bridge in Montreal. The largest city in Quebec is allowed to have a nice wide bridge & long metro trains, because Quebec isn't bound by anything like the backwards BC mentality. 

https://www.theglobeandmail.com/canada/article-montreals-new-44-billion-champlain-bridge-opens-to-traffic-for Fortunatly, the Vancouver mentality wasn't able to ever reach back to Montreal & prevent such a nice modern bridge from being built there. https://www.flatironcorp.com/project/champlain-bridge If you are from Montreal & have visited Vancouver, you will be surprise to see how much shorter an underground Vancouver train station is than what is allowed underground in Montreal, Toronto, Edmonton, Seattle, SF & LA...

https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx A bike & foot bridge should have been built next to it decades ago. Then the Granville Bridge could have 3 general lanes each way, plus a bus & HOV lane each way. Instead, if 2 bus & HOV lanes are designated, there will only be 2 general lanes each way in the downtown core.

The Burrard Bridge should have had a bike & foot bride next to it. Instead, it was reduced from a 6 lane crossing to a 4 lane bridge.

The very narrow Oak+Street+Bridge & the Knight Street Bridge, should have had bus+and+bike+bridges built next to them decades ago. 

Most bridges in Vancouver & the metropolitan region just weren't designed with that much future capacity in mind, especially for buses & HOV lanes. Thus, it's a travesty that by now, almost every crossing should have had bus & bike bridges built next to them. 

https://vancouver.ca/streets-transportation/walk-bike-and-transit.aspx Unfortunatly, provisions for bus & bike lanes just weren't the thing to do several decades ago in BC.  

A truck lane is just as important as a bus & HOV lane. That's because freight should be efficiently & easily be transported in any major urban region.

https://vancouver.ca/streets-transportation/trucks-commercial-and-oversize-vehicles.aspx

https://jfdatalinks.blogspot.com/search?q=Oak+Street+and+Granville+Street

https://jfdatalinks.blogspot.com/search?q=Iron+Bridge 

https://jfdatalinks.blogspot.com/search?q=Lion+Bridge

Saturday, April 19, 2025

The narrow bridges of Vancouver, Canada

https://montecristomagazine.com/community/forgotten-bridges-vancouver

The LGB just wasn't designed with any future capacity in mind. 

History of the Lions Gate Bridge https://www.youtube.com/watch?v=JHqi7Kijedw 

https://en.wikipedia.org/wiki/Lions_Gate_Bridge#History

https://upload.wikimedia.org/wikipedia/commons/7/7e/Lions_Gate.jpg 

The inadequate 3 lane LGB is currently the most narrow road bridge in backwards & stubborn Vancouver. It's been in that category since the removal of the 2 lane Fraser Street Bridge in the 1970s. There was a refusal to twin the absurdly narrow LGB between the 1950s & 1970s. By the 1980s there should have been a subway tunnel and an 8 lane tunnel. Then two of the lanes could have been for buses. Georgia+Street is 7 lanes wide as it gets closer to Stanley Park. Thus, the main part of a tunnel through the park could have provided 3 general lanes each way & a bus lane each way. Instead, the 7 lanes of the westernmost part of Georgia Street are funneled into a 3 lane causeway & a 3 lane bridge. The LGB would be fantastic as just a bike & foot crossing, with train, bus & road tunnels well beneath & beside it.    

The Burrard_Bridge, BB or  BSB opened with 6 lanes, but now it only has 4 lanes. There are 2 bike lanes & 2 sidewalks. Had a parallel bike-bridge been built, the BB could have still had 6 lanes. While the BB has a lower level provision for streetcars or tram-trains, Vancouver did its damndest to phase out streetcars well before the 1960s. 

The Ironworkers_Memorial_Bridge has 6 lanes, but should also have had 2 wide shoulders & 2 very wide sidewalks. Unfortunatly, there was no provision for a lower deck, as is also the case with all of the other Vancouver  bridges. https://en.wikipedia.org/wiki/Ironworkers_Memorial_Second_Narrows_Crossing

Any replacement of the inadequate Ironworkers+Memorial+Bridge should be on the scale of what Perth, Seattle and Montreal have done.

https://en.wikipedia.org/wiki/Granville_Street_Bridge#Third_bridge_(1954)

https://www.youtube.com/watch?app=desktop&v=vPSdF0jRTC4 The Granville-Bridge or GSB is the widest bridge in the city limits. It opened with 8 lanes, but is being transformed into a 6 lane bridge with 2 bike lanes & 2 sidewalks. Had there been a paralel bike & foot bride, the GSB could have still been 8 lanes wide. Then there could have been 2 exclusive bus lanes.

https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx

The Oak Street Bridge should have been 8 lanes wide, with 2 wide sidewalks.

The Knight+Street+Bridge should have been 8 lanes with 2 wide sidewalks. Instead, its a 4 lane chokepoint.

The Arthur+Laing+Bridge should have been at least 6 lanes with 2 proper bike lanes & 2 sidewalks.

If the Cambie_Street_Bridge had 2 very wide sidewalks, then its likely that it would still have 6 lanes instead of 5. https://en.wikipedia.org/wiki/Cambie_Bridge#The_present_bridge

Unfortunatly, bottleneck or chokepoint planning is part of the Vancouver & BC mentality.

Of course BC & the Metro+Vancouver Region just hasn't put enough funds and effort towards proper big-city planning & infrastructure development. 

If Perth+and+Seattle had to conform to the extremely restrictive Vancouver approach to things, those cities would be in a perpetual state of chaos. Fortunately, nothing like the BC Mind Virus has ever reached WA.


https://jfdatalinks.blogspot.com/search?q=Oak+Street+and+Granville+Street

Wednesday, November 12, 2025

Cities, the BIG and the small of it

 https://en.wikipedia.org/wiki/CN_Tower 

https://upload.wikimedia.org/wikipedia/commons/thumb/9/9c/CN_Tower_1976.jpg/330px-CN_Tower_1976.jpg , https://www.britannica.com/topic/CN-Tower Standing at a height of 1,815 feet (553 meters)  
1815' divided by 581' is almost 3.13 times the height of a stump in Vancouver.
https://en.wikipedia.org/wiki/Harbour_Centre "Skyscraperpage lists the buildings height to the roof as being only 139.6 m (458 ft). This is stated to be the height from the Hastings Street entrance while the height from the back entrance on Cordova Street is 146 m (479 ft). It also lists the buildings pinnacle height to the tip of the antenna as being 177.1 m (581 ft)." STUMP!
This Vancouver stump is only 32% of the CN Towers height. 
https://upload.wikimedia.org/wikipedia/commons/thumb/5/5a/A_look_downtown_%28759827996%29.jpg/960px-A_look_downtown_%28759827996%29.jpg The Harbour_Centre building should have been on the scale of something like the Hopewell_Centre_(Hong_Kong)

https://en.wikipedia.org/wiki/First_Canadian_Place The BMO. Unlike Chicago, Toronto has no 100 story office towers.

https://upload.wikimedia.org/wikipedia/commons/thumb/5/5a/First_Canadian_Place_August_2017_01.jpg/500px-First_Canadian_Place_August_2017_01.jpg Its a 72 story HQ tower in Toronto.

https://en.wikipedia.org/wiki/Bentall_Centre_(Vancouver)#Three_Bentall_Centre A 32 story BC office stump.

https://upload.wikimedia.org/wikipedia/commons/thumb/4/4a/Bentall_3.jpg/330px-Bentall_3.jpg

Being from small Vancouver, its amazing that Canada even has one megacity. Toronto is certainly a big city on a lakeshore like Chicago is. Montreal isn't allowed to have buildings as tall as Melbourne, let alone NYC. Montreal has allowed only one office tower to be over 50 floors and a few residential towers in the 60s. 

Calgary has more 50+ story office towers than Denver and Perth. No 40 story office tower exists in BC. The office section of the Harbour_Centre doesn't even have a 30th floor and the revolving restaurant is closer to being like 35 floors up. However, with the overall building being 481 feet, it would be equivalent to 40 floors, if the windows went right up to the top. The flagpole has no windows, but the flag would be like the equivalent of being 48 floors up.

Not just Toronto & Montreal, but Edmonton and Seattle have longer underground train stations than backwards, congested Vancouver. 

The Iron+BridgeOak+Street+BridgeKnight+Street+Bridge & the Arthur+Laing+Bridge should all have a bus+and+bike bridge built next to them. The extremely inadequate Lion+Bridge should have already had a bus and train tunnel close to it. 

Thursday, July 10, 2025

The Milizie Bridge in Italy and the Windan Bridge in W, Australia and The Cushing Bridge in Calgary, Alberta

 https://www.lombardiabeniculturali.it/fotografie/schede/IMM-5w050-0000107/

It used to be like a narrow 4 lane Vancouver bridge.

https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEhdL1nsrfQlu2fehTGEprH7FGBsYGcr_TPyqucsA-EWRJdwwHCROFB-V_oTimMt3jA863q25r8g5pY83s0yOUppOM1EuVsBaGO4kc846blp-xCt8G3xQs7Srg2Ro9nPKPom-V5YOdCRm1bM/s1600/PontiMilizie-NotizAtmMarApr74-ridotto.jpg

https://milanoneisecoli.blogspot.com/2014/10/lo-scomparso-torrione-fascista-di.html

Eventually, the Ponte+Delle+Milizie was rebuilt to have 2 bus lanes as well as 4 general lanes.

https://www.google.com/maps/place/Ponte+Delle+Milizie

Something like the 6 lane Windan_Bridge and the double track Goongoongup_Bridge, just aren't allowed in Vancouver. The city should do something similar like the Cushing+Bridge+in+Calgary.

Unfortunatly, the backwards Vancouver approach is to take lanes away, while pretending to be building an efficient regional rapid bus network. 

The Arthur+Laing+BridgeOak+Street+Bridge and Knight+Street+Bridge only have 2 lanes each way in the middle and there was no provision to have 2 bus lanes. Thus, unless a 2 lane bus-bridge is built next to each of them, the regional express bus network will remain a sad BC joke.

There should also be a 6 lane Boundary+Road+Bridge crossing Burrard_Inlet and another one crossing the Fraser_River

Thursday, April 3, 2025

The inadequate Arthur Laing Bridge

https://en.wikipedia.org/wiki/Arthur_Laing_Bridge Another fine example of how Vancouver doesn't allow for proper big city infrastructure planning. The ALB has no sidewalks, no proper bike lanes, & especially, no bus lanes.

https://en.wikipedia.org/wiki/Arthur_Laing_Bridge#Since_opening

https://upload.wikimedia.org/wikipedia/commons/6/61/Arther_Lang_Bridge_and_Fraser_River%2C_Vancouver_%28504734%29_%2823678427633%29.jpg The 4 lane BC bottlenek mentality is so firmy entreched. There just wasn't any proper concept to have 2 bus lanes, in addition to 4 general lanes. There is no good reason as to why the Arthur+Laing+Bridge wasn't designed to have 2 sidewalks & 2 bike lanes. 

Unless the bridge can slightly be widened on each side, safe & properly separated bike lanes will be unlikely. 

https://bikehub.ca/about-us/news/arthur-laing-bridge-bike-lane-widening


  • Arthur Laing Bridge (Richmond-Vancouver): As there are no sidewalks on the bridge, cyclists ride on the shoulders of the roadway. Northbound cyclists can get to the bridge via Russ Baker Way or an off-street pathway that can be accessed from the Airport Station bus loop or from the Airport Connector bridge.

https://www.richmond.ca/parks-recreation/parks-trails-cycling/cycling/cycling_maps.htm


https://www.yvr.ca/en/passengers/transportation/bicycles-and-cycling

https://evelazarus.com/?s=the+Arthur+Laing+Bridge

This bridge & the Knight+Street+Bridge & the Queensborough_Bridge are so narrow, that there should be bus & bike bridges built next to each of them. 


https://jfdatalinks.blogspot.com/search?q=Arthur+Laing+Bridge

Thursday, August 20, 2015

Why is the Canada (embarrassment) Line built the way it is?

Despite its high cost, the C+Line or YVR-Line was designed to have shorter stations than the underground stations in Edmonton & Seattle. Even shorter than the ground level stations in Calgary & Portland. Considering that a Montreal Metro station is 152.5m or 500 feet in length, the absurd C Line stations are only 50m. 

A one third size train still could have been designed for proper future capacity expansion. Unfortunatly, this joke of a train was only designed to have 2 coaches & eventually 2.5 car trains, not 5 & certainly not 10. Because that's what a proper big city would do.

The light rail train bridge to Richmond wasn't designed to have any bus lanes, just 1 bike lane. No proper bus & HOV lane bridge has been built next to the narrow Knight+Street+Bridge , Oak+Street+Bridge , or Arthur+Laing+Bridge. By now, all 3 road bridges should have had 4 lane bus & HOV bridges next to them. Indeed, each bridge should have had 2 bus & 2 HOV lanes beside them by now. But why do that when everything can be crammed into just 2 lanes each way. Combine that with no breakdown lanes or wide shoulders & you have classic BC bottleneck planning. Since the C Line isn't running 24 hours, there should have been a 24 hour express bus to the airport on 2 dedicated lanes on the C Line bridge. That would have made it possible to always have an airport express bus, especially when the C Line is only running 2 car trains.

It's all such a sad joke that should be laughed at all over the world. It's also symbolic of the refusal to properly think & build big in backwards BC. Its like a whole lot of money was never efficiently or properly put into the regional infrastructure over the course of several generations. Any serious big city airport+line should be designed for significant future capacity. 




Friday, November 29, 2024

Cambie Street Bridge repairs choke traffic out of downtown Vancouver

 https://dailyhive.com/vancouver/cambie-bridge-repairs-choke-traffic-downtown

Of course Vancouver won't build anything like the Boorloo_Bridge for bikes & pedestrians. Apparently, it's much better to take a lane away from the Cambie Bridge. 

Fortunately, the backward Vancouver mentality never made it over to Perth. Otherwise, the The_Third_Causeway bridge would have had 1 or 2 lanes removed.

With 6 lanes, The_Causeway_in_Victoria_Park, Perth provides a nice 6 lane crossing. Unlike backward Vancouver the Causeway in Perth was allowed to have 3 lanes each way. The key component is that the 3rd lane each way is for busses. In contrast, absurd Vancouver won't allow for a proper bus & bike bridge network to be built, because it would rather keep its bridges as narrow & congested as possible. 

https://upload.wikimedia.org/wikipedia/commons/5/5a/Causeway_-_Victoria_Park.JPG

It's very strange that Vancouver refused to have something like the 6 lane Causeway+Bridge in the 21st century. A 3rd lane each way for buses on the Causeway+Bridge makes so much sense in Perth. However, for stubborn Vancouver, such measures might help to improve mobility.

Apparently, Vancouver has no plans to build something like the Boorloo_Bridge or the Esplanade+Riel+Footbridge next to the Cambie & Burrard Bridges. Thus, the Cambie has lost a lane & the Burrard has lost 2 lanes. Had both bridges been allowed to retain 6 lanes, they both could have provided 2 bus lanes.

The Cushing+Bridge is a 4 lane bridge in Calgary. Thus, like the Oak Bridge & Knight Bridge in Vancouver, there was no room for 2 bus lanes on them. Unlike, backward Vancouver, Calgary was able to build a 2 lane bus bridge right next to its Cushing+Bridge.

Fortunately, the horrible transportation planning mentality of Vancouver was never adopted in Perth & Calgary. Either you have a wide enough bridge for busses, or you build bus & bike bridges to help the existing bridges.

The Norwood+Bridge in Winnipeg provides at least 6 lanes, so a couple of bus lanes isn't a problem.

Singapore built its Helix_Bridge instead of removing lanes from the other bridges.


https://jfdatalinks.blogspot.com/search?q=Cambie+Street+Bridge

Tuesday, April 29, 2025

Why is Metro Vancouver Creating a New Downtown?

https://www.youtube.com/watch?v=ybMhTlj-l5s 

Unlike Seattle and Calgary, Vancouver has no office towers over 50 stories. There aren't even any 40 story office towers in BC. Vancouver is firmly against permitting any office tower from having a 40th floor. However, Vancouver cant stop Burnaby and especially Surrey from having an office tower over 40 stories. While a 50 story office tower anywhere in backwater BC still seems unlikely, Burnaby and Surrey will likely be the first 2 cities in BC to have at least a 45 story office tower. 

 https://dailyhive.com/vancouver/50-storey-tower-community-hub-edmonds-burnaby 

So far, stubborn and strict Vancouver has only permitted 2 buildings to be taller than the tallest in Bellevue,_Washington

Vancouver has only permitted one building to be taller than the tallest in Vaughan, Ontario.

https://www.skyscrapercenter.com/building/cg-tower/32139 

Since Burnaby and Surrey aren't under the backwards and thwarting restrictions that Vancouver has, Burnaby and eventually Surrey, will have taller buildings than stumpy Vancouver. Indeed, Burnaby already has some buildings taller than Downtown_Bellevue. Surrey will eventually have some buildings taller than the Vaughan_Metropolitan_Centre.          

Vancouver will continue to limit the height of its buildings for as long as possible. Vancouver won't allow a bus and train tunnel near the lion Bridge, let alone a 6 lane highway tunnel. Despite the Iron Bridge needing a parallel bus bridge and a Skytrain bridge, progress remains at a snail's pace. There still seems to be no interest in building a bus bridge next to the Oak and Knight Bridges. A city on the moon and Mars might happen before stubborn Vancouver ever builds a new Fraser Street bus & bike bridge. Not only should there be a Boundary Road Bridge to Richmond, but at least a Boundary bus & bike bridge to the North Vancouver.  

Its like backwards BC keeps hoping that by symbolically refusing to build up proper big city size transportation infrastructure, people will stay away. However, its only because no one has been able to effectively challenge the bottleneck-chokepoint mentality, that not much has been done.