Sunday, October 26, 2025

All cables and final steel girders now installed for the Pattullo Bridge replacement

 https://dailyhive.com/vancouver/pattullo-bridge-construction-milestone-cables-deck Unlike the old, inadequate bridge, which only has 4 narrow lanes and just 1 sidewalk, this will have 2 sidewalks and 2 bike lanes. Unfortunatly, there won't be any bus or HOV lanes. Thus, all the traffic will be funneled into just 2 lanes each way. Of course there won't be any emergency lanes or breakdown lanes, so this is another quintessential BC bottleneck by design. At least a provision for a lower deck would have provided some hope. While this bridge can eventually be widened to 6 lanes, there seems to be no serious consideration for there to be bus and HOV lanes. So it will end up like the overloaded 6 lane Iron Bridge.

https://en.wikipedia.org/wiki/SkyBridge_(TransLink) No bike lanes and sidewalks and it wasn't built wide enough to eventually accomodate 3-4 tracks and 2 bus lanes. There is just something about backwards BC that makes it so obtuse and inept. 

https://upload.wikimedia.org/wikipedia/commons/thumb/1/1d/SkyBridge_from_SkyTrain_%285770458210%29.jpg/500px-SkyBridge_from_SkyTrain_%285770458210%29.jpg At the very least, this bridge should have had 3 tracks and 2 bus lanes, a bike lane and a sidewalk on a lower deck. There is only a middle service track and apparently, no provision for a bike lane and a sidewalk.

https://en.wikipedia.org/wiki/New_Westminster_Bridge Still, only a single track bridge for freight and passenger trains. 

https://upload.wikimedia.org/wikipedia/commons/thumb/1/1f/New_Westminster_Swing_Bridge.jpg/960px-New_Westminster_Swing_Bridge.jpg This old single track bridge should have been double tracked on a lower deck and have at least 4 lanes on an upper deck. Then when the first 4 lane Pattullo Bridge opened, it might not have been quite as overloaded in its later decades. 

In order for this joke of a river railway crossing to be properly upgraded and efficient is for there to be at least a new double track bridge.  

NW should have really had something like its own version of the Steel_Bridge in Portland. 

https://upload.wikimedia.org/wikipedia/commons/thumb/5/51/Amtrak_talgo_train_crossing_steel_bridge.jpg/960px-Amtrak_talgo_train_crossing_steel_bridge.jpg Fortunatly, Portland didn't have a provincial backwater mentality like NW. Thus, they could build a lot more bridges. 
https://upload.wikimedia.org/wikipedia/commons/thumb/8/80/SteelBridgePano1.jpg/960px-SteelBridgePano1.jpg MAX light rail on the upper deck and Amtrack and freight trains on the lower deck. Fortunately, Oregon is far enough away from ever catching the BC Mind Virus. 
https://upload.wikimedia.org/wikipedia/commons/thumb/e/e3/Aerial_view_of_Willamette_River_crossings_in_Portland%2C_February_2018.JPG So many nice bridges in Portland. 
 
There is such a the lack of bridges between NW and Surrey.
https://upload.wikimedia.org/wikipedia/commons/thumb/0/0a/New_Westminster_Aerial_view_2015.jpg/960px-New_Westminster_Aerial_view_2015.jpg For most of the history of NW, Surrey was just some farmland south of the river with not much going on, but its many times larger than little NW. 

There just didn't seem to be that much a big city vision for little provincial backwater NW. Back in the day, NW could have acquired what would become the Tri-Cities and perhaps, even Surrey. There just wasn't any desire to have a big river city in BC on the scale of Portland,_Oregon. So while NW is stuck as a tiny city, Surrey is on its way to becoming the biggest city in BC.

Unfortunately, the Iron Bridge and Granville Bridge were never designed to have a lower deck for trains and buses either. That's just how it is in backwards BC.  




Wednesday, August 20, 2025

Pacific National Exhibition (PNE)

The Pacific_National_Exhibition, which is in Hastings+Park, should have been much bigger and better by now, but this is watered down Vancouver. https://www.pne.ca/hastings-park-access , https://en.wikipedia.org/wiki/Hastings_Park

https://thecanadianencyclopedia.ca/en/article/pacific-national-exhibition-pne

https://www.pne.ca/about-us/history-legacy 

Generations ago, one could take a streetcar to the PNE. Of course it's still possible at the CNE.

https://vancouversun.com/news/this-week-in-history-1890-vancouver-gets-cutting-edge-with-an-electric-streetcar-and-light-system 

https://montecristomagazine.com/community/vancouvers-forgotten-streetcars#gsc.tab=0

https://kumtuks.ca/streetcars-and-metro-vancouver/

https://macleans.ca/culture/i-started-working-at-the-pacific-national-exhibition-when-i-was-12-it-was-a-wild-ride/

https://www.vancouverisawesome.com/history/brief-history-of-pne-playland-1935285 

https://dailyhive.com/vancouver/pne-history-photos-vancouver  

https://604now.com/history-pne-vancouver-bc/ 

https://www.ctvnews.ca/vancouver/article/heres-how-many-people-attended-the-pne-this-year (2024)

https://vancouversun.com/news/pne-draws-nearly-638000-people-the-highest-since-the-pandemic

https://dailyhive.com/vancouver/pne-fair-attendance-2024

https://www.chronicallyvintage.com/2014/08/a-vintage-photo-filled-look-at-history.html

https://evelazarus.com/the-pne-then-and-now 

https://www.echostories.com/backstory/pne-anniversary-book/


Unfortunatly, it hasn't always been a fun place.

https://hastingspark1942.ca/

https://hastingspark1942.ca/buildings-overview/

https://hastingspark1942.ca/history/momiji-gardens/



https://jfdatalinks.blogspot.com/search?q=PNE 

https://jfdatalinks.blogspot.com/search?q=Hastings+Community+Park+and+Hastings+Park

Monday, April 27, 2026

Old Pattullo Bridge and its Still Narrow Replacement

 https://www.youtube.com/watch?v=8_mNfn4zjcI 

Even in the 1930s there should have been some type of a big city vision, but with NW being so small and Surrey being so out of the way, this part of BC was on the urban periphery. Apparently, there was no concept of an emergency lane on the Pattullo Bridge. Still, in addition to the 2 narrow lanes each way, there should have been 2 lane for horses and wagons. Then, by the 1950s the PB could have had 3 wide lanes each way, pulse a strong traffic divider. Instead, the narrow PB was stuck with only two lanes each way, no safety divider and only 1 narrow sidewalk.

For most of its history, NW just saw it self as a provincial backwater. The lack of a big city vision in the early 1900s meant that it never bothered to absorb what would become the Tri-Cities. For most of its history, Surrey never considered that it could eventually become the largest city in BC. Of course now that has changed.

Despite being so small, NW has become a Metro Vancouver regional transit hub, because of the New_Westminster_station

Scott_Road_station is a transit hub for the South_Westminster area.

Surrey and NW really should have had a proper big city size bridge.

This is how the new road configuration could have gone for what should have been a 10 lane bridge, not another 4 lane BC joke. Even if it can eventually have 6 lanes, there is no provision for a lower deck for trains and busses.

This shows how existing key roads could have linked into a 10 lane bridge, all without having to widen the surrounding roads. Thus, no need for any major land expropriation.

2 lanes from Royal Avenue onto the new bridge and 2 lanes from the bridge onto Royal Avenue in New+Westminster.   

One lane onto and one lane off linking the bridge to the South_Fraser_Perimeter_Road in Surrey.

2 lanes onto McBride boulevard and 2 lanes onto the bridge from McBride in New+Westminster.  

From Columbia_Street_in New_Westminster, 1 lane onto the bridge, as well as 1 lane off the bridge

2 lanes from King_George_Boulevard onto the new bridge and 2 lanes from the bridge onto KGB in Surrey

2 lanes from Scott Road onto the new bridge and 2 lanes from the bridge onto Scott_Rd in Surrey.  

Things weren't properly explained to the public as to how important a wide big city bridge could have been possible and without having to widen the roads connecting to it.

Unfortunately, all of this is being funneled into just 2 lanes each way. Its as if someone symbolically wanted the new bridge to open without any bus and HOV lanes. That's how BC bottleneck and chokepoint planning works. 


https://en.wikipedia.org/wiki/Metro_Vancouver_Regional_District  

https://en.wikipedia.org/wiki/Fraser_Valley

Some day, the BC Lower_Mainland should be planned and developed to function more like a proper big urban area. 


https://jfdatalinks.blogspot.com/search?q=Pattullo+Bridge+replacement

Tuesday, October 14, 2025

Granville Bridge, Vancouver, etc.

 https://vancouver.ca/streets-transportation/granville-bridge.aspx 

Even after 3 tries, Vancouver still couldn't quite get the Granville_Street_Bridge (GSB) correct. Of course the 3rd bridge wasn't designed to have a lower deck for streetcars or tram-trains. Even though it was generally designed to be a car, truck and bus bridge, the sidewalks should have been double width and have an inner railing. If the city couldn't wait until late March, it should have had the official dedication in early March, not in crappy February 1954.

https://en.wikipedia.org/wiki/Granville_Street_Bridge#Third_bridge_(1954) "On February 4, 1954, the current Granville Street Bridge opened to traffic after five years of planning and construction; its dedication ceremony was attended by 5,000 spectators after it had been delayed a week due to heavy snow." 

https://en.wikipedia.org/wiki/Granville_Street_Bridge#21st_century Unfortunatly, new bike lanes and extra sidewalks couldn't be installed below the 8 lane deck. Thus, Vancouver went for strike 3 and removed 2 lanes from the bridge. The Burrard+Street+Bridge lost 2 lanes and the Cambie+Bridge lost 1 lane. A bike and foot bridge could have been built on the west side of the Burrard Bridge, then no lanes would have been removed. The Cambie Bridge already had a wide sidewalk on its east side. The west sidewalk should have been widened, then no lane would have been removed. 

The Granville+Bridge could have had 6 lanes and 2 bus lanes. Now, if there are ever 2 bus lanes, there will only be 2 general lanes each way.

Several cities around the world have bike & foot bridges and don't have to remove lanes from the existing bridges.

For such a congested city to have removed 5 lanes from 3 bridges, could there even be more of a reduction of lanes Well, there are some who would like to have the LGB just for bike and foot traffic.

https://globalnews.ca/news/1946543/government-says-lions-gate-bridge-will-not-close-to-cars-come-2030 

That would be OK if an 8 lane tunnel could be built near it. Such a First Narrows Tunnel could have 3 lanes each way, plus a bus lane each way. A parallel triple track commuter train tunnel should be built close to it as well.

The new & improved tunnel between Richmond and Delta won't be ready until 2030. Since things move so slow in constipated, backwards BC, perhaps a First_Narrows_Tunnel might not be completed until 2040, or even 2050.



https://jfdatalinks.blogspot.com/search?q=Granville+Bridge

Friday, November 1, 2024

Vancouver's narrow bridges over the Fraser River

 https://dailyhive.com/vancouver/vancouver-knight-street-video-concern

The Knight_Street_Bridge (KSB) was deliberately designed to not have a couple of emergency lanes. No truck lanes and especially no bus and HOV lanes. No proper bike lanes, just 2 narrow sidewalks. 

https://en.wikipedia.org/wiki/Knight_Street_Bridge#Infrastructure

Thus, the Knight_Street_Bridge is one of the best examples of BC bottleneck planning.

https://images.drivebc.ca/bchighwaycam/pub/html/www/695.html

The Knight_Street_Bridge is so narrow and inept, that a new HOV, bus and bike bridge should be built right next to it. The Knight+Street+Bridge is only 4 lanes wide in the middle, so a parallel 4 lane bridge would greatly improve things. One lane on and one lane off between the twin bridge crossing and Marine-Drive. Then the main 3 lanes each way onto the 6 lanes of Knight+Street up to Kingsway. 


The incredibly narrow Fraser_Street_Bridge (FSB) was torn down and should have been rebuilt or replaced by the 1970s, especially by the 1990s. The city and the Provincial_government didn't seem to understand that a new bridge there would be great as a HOV, bus and bike bridge. A couple of wide emergency lanes would have made it a lot easier for emergency vehicles to go between Vancouver & Richmond.


Despite Oak Street being 6 lanes wide, the BC bottleneck mentality wanted to force everything into a 4 lane Oak_Street_Bridge (OSB). Even if there was no concept to have bus lanes in the late 1950s, the OSB should have had 6 lanes, plus 2 wide emergency lanes and 2 wide sidewalks.

https://en.wikipedia.org/wiki/Oak_Street_Bridge#Infrastructure

By now, there should have been a HOV, bus & bike bridge built next to the narrow & inept Oak_Street_Bridge


The Arthur-Laing-Bridge (ALB) is only 2 lanes each way. https://en.wikipedia.org/wiki/Arthur_Laing_Bridge


The multigenerational inept Vancouver & BC planning agenda is all about creating more congestion. 

Fortunately, the 8 lane Champlain+Bridge also has 2 passenger train tracks. This was possible, because Montreal and Quebec don't have anything like the Vancouver & BC mentality to hinder them.

Why have a provision for 10 car SkyTrains, when a 2-4 car joke of a train can enable more congestion? That's the backward BC way.

It's amazing that the Montreal+Metro was designed to have 9 car trains, even back in the 1960s. Montreal and Quebec in general, just don't have anything like a backwater BC mentally to contend with. Quebec isn't just able to do more because it has more people than BC, Quebec has been able to accomplish more because it isn't BC.

https://vancouver.ca/streets-transportation/bridges-and-structures.aspx

Despite being a newer crossing, the Arthur+Laing+Bridge was only designed to have 4 lanes, just like the older Oak+Street+Bridge. Both bridges should have been built with very wide shoulders, so that they eventually could have provided 6 lanes. Plus, both bridges should have had very wide sidewalks. However, that goes against the chokepoint planning mentality.

Wednesday, September 13, 2023

The Stack Tower, or is it just another stumpy office building in Vancouver, BC?

 https://dailyhive.com/vancouver/the-stack-office-tower-1133-melville-street-vancouver-tallest-greenest

It's all about Stumps+and+Towers.

There is no office tower in Vancouver or BC that has ever been allowed to have a 40th floor. Seattle has the 76 story B of A tower & Toronto has the 72 story BMO tower. That's because those cities aren't under anything like the restrictions and limitations that Vancouver has. If you can't build a wall around BC, the next best thing is to limit or reduce the scale of things. Then continually fall behind with the overall infrastructure.

Vancouver not only has limited the scale of office towers, but residential towers as well. It would seem that there is more of a demand now for residential towers than office towers.

Seattle, Calgary & Edmonton all have allowed a residential tower to be taller than anything in Vancouver. 

https://thedigitallabyrinth.blogspot.com/search?q=Vancouver+House

London, UK for the longest time, refused to permit taller buildings. Then eventually as the land became so expensive, they eventually started to allow some towers that even rivaled that of Paris & Frankfurt. Some of the towers would not even be stumps when compared to those in NYC & Chicago.

https://vancouversun.com/news/local-news/no-rooms-at-the-inns-knock-on-effects-of-vancouvers-hotel-shortage If the city would allow taller buildings, then the hotel companies could build more rooms on the lower half, while providing condos on the upper half. Or, visa versa. 

https://storeys.com/vancouver-hotel-shortage-council-motion Fortunatly, many other cities are able to keep up with getting more hotel rooms built. https://vancouver.citynews.ca/2023/09/08/vancouver-hotels-shortage-city-councillor/

https://dailyhive.com/vancouver/metro-vancouver-hotel-supply-shortage-demand

https://www.bcbusiness.ca/Land-Values-How-the-hotel-shortage-in-Vancouver-is-coinciding-with-a-boom-in-tourism

https://dailyhive.com/vancouver/city-of-vancouver-hotel-room-shortage-new-policies

Of course by the late 1800s, Montreal & Toronto had a sense of becoming major cities. Then by the early & mid 1900s, it became even more apparent. In the early 21st century, Vancouver is still stuck in a multi-decade rut of wanting to stunt, thwart or hold back the city in any way possible.

https://thedigitallabyrinth.blogspot.com/search?q=The+No+Fun+City

Most of the regional bridges or crossings have been deliberately kept so narrow that it's almost impossible to have a proper regional express bus network to compliment the short sighted Skytrain stations.

All the narrow bridges should have had additional Bus+and+HOV+Lane bridges by now.

https://thedigitallabyrinth.blogspot.com/search?q=HOV

The stump city has so much potential, but only if Vancouver reaches for the sky.


https://jfdatalinks.blogspot.com/search?q=stumps

Monday, October 13, 2025

Majority polled in Calgary and Edmonton are unhappy with the pace of population growth

 https://www.cbc.ca/news/canada/calgary/too-much-too-fast-majority-polled-in-calgary-edmonton-unhappy-with-pace-of-population-growth-9.6935121 

If you are visiting Vancouver or Victoria from Calgary or Edmonton, you will be shocked as to how narrow most of the bridges are in Greater Vancouver and Victoria. Edmonton was wise in the 1970s to have 125 m long underground LRT stations. Foolish Vancouver opted to only have 80 m stations on its first 2 lines and an absurd 50 m for the 3rd line. 

https://en.wikipedia.org/wiki/Green_Line_(Calgary) , https://www.calgary.ca/green-line.html 

https://www.calgarytransit.com/plans---projects/lrt/green-line.html

https://engage.calgary.ca/greenline/UndergroundStations Fortunatly, any underground stations in Calgary will be closer in length to that of the Edmonton LRT and not backwards Vancouver.

https://www.railjournal.com/regions/north-america/tunnel-preferred-for-calgary-lrt-green-line/

https://www.tunnelsandtunnelling.com/news/calgary-city-council-approves-green-line-lrt-construction/?cf-view

https://www.calgary.ca/green-line/stations.html

https://www.tunnelsandtunnelling.com/news/calgary-city-council-approves-green-line-lrt-construction/?cf-view 

The main roads and bridges in urban parts of Alberta are allowed to be wider than their counterparts in backwards BC. So while people in the urban parts of Alberta are concerned or even angry about rapid growth, at least Alberta can easily build more urban infrastructure. That's because Albertal isn't affect by the (unofficial) BC Mind Virus (BCMV). 

A timely example is a new bridge between Surrey & NW. Despite Surrey being expected to become the largest city in BC, the new bridge will only open with 4 lanes. No 3rd or 4th lane each way for busses, HOVs and trucks. Thus, all the road traffic at either end is funneled into just 2 lanes each way. Plus, there are no breakdown or emergency lane, just like the old bridge.   

While this new bridge can eventually be widened to 6 lanes, there is no provision for a lower deck for LRT, busses and trucks. Despite SW BC being a seaport area, trucks are funneled onto mostly narrow bridges. There has been a lack of interest to build bus bridges next to almost all of the bridges in Greater Vancouver. Yet, there is a Half-A$$ED attempt to have a better regional express bus network. This regional Rapid Bus attempt will always be a joke, unless a series of bus bridges are built. The Half-A$$ED approach is to try to have bus lanes on 4 to 6 lane bridges. Designating 2 bus lanes would reduce the narrow bridges to only 1 or 2 lanes each way for general traffic in what is suppose to be a major seaport and urban area.   

Most of the worlds population is non-white and for a big part of the history of BC, there has been a refusal to build up bigtime infrastructure for everyone. While some Albertains might wish that there was a wall built around their province or a force-field like out of Star Trek, BC is almost pretending like there is. Thus, the keep things small and backwards mentality. 

Several decades ago, BC implemented a symbolic slow-growth approach. Despite BC not having any control over immigration, or trying to establish an internal passport & checkpoint system, to KEEP PEOPLE OUT, it opted for the next best thing. Stunt or scale back the urban infrastructure to project a strong symbolic reluctance to growth and thinking big. 

When you realize how much larger things are allowed to be in Alberta, Washington State and even Western Australia & compare them to watered down BC, you see quite a difference. Despite BC & Canada in general, being multicultural, BCs cities keep finding ways to water the scale of things down. Canada has yet to have even 1% of the world's population, despite its size.  

While there are good arguments to occasionally slowdown immigration, that can eventually become problematic, just like too much immigration. Even in the 2020s, some people in the former White colonial parts of the world still wish that Canada & Australia, etc., could be a White Man's paradise. However, that seems so impractical on a planet that mostly has a non white population. 

https://humanrights.ca/story/chinese-head-tax-and-chinese-exclusion-act

https://thecanadianencyclopedia.ca/en/article/chinese-head-tax-in-canada 

https://royalalbertamuseum.ca/blog/chinese-head-tax-george-yees-story 

https://www.musee-mccord-stewart.ca/en/blog/chinese-exclusion-act/

https://parks.canada.ca/culture/designation/evenement-event/exclusion-chinois-chinese

https://www.canada.ca/en/canadian-heritage/campaigns/asian-heritage-month/important-events.html

https://stanleyparkvan.com/stanley-park-van-monument-komagata-maru.html

https://vancouver.citynews.ca/2022/10/05/vancouver-komagata-maru-memorial

https://vancouver.citynews.ca/2023/01/30/vancouver-komagata-maru-memorial-vandalism/

Even if Alberta were to eventually become its own country, it would be extremely unlikely that it could ever impose a White Man's Paradise Agenda. The same could be stated for backwards BC. However, something very peculiar has been happening in BC for several generations. 

Several BC cities and municipalities play off each other with various slow-growth agendas. Vancouver being one of the most restrictive & backwards on the the planet. Somehow the legitimate anti freeway fears of the 1960s & 70s didn't get the city & region to still build a series of bus & HOV bridges. Plus, a long-term, high capacity urban rail system.

While Montreal planned for 152.4 m stations to accomodate 9 car trains, backwards Vancouver only built 80 m Skytrain stations for the first 2 lines. Then to top that, was a plan to build a line to Richmond with only enough level clearance for 50 m stations. The 1st line only started to run 5 car trains in 2025. Eventually, the 2nd line will also have 5 car trains. However, the line to the airport was deliberately designed not to have 5 car trains. Just a Half-A$$ED 2.5 car train, someday. WTH?

For Greater Vancouver to mostly have narrow bridges, one would think the all the stations could ultimately be at least as long as a Montreal Metro train station. Indeed, Greater Vancouver should have built for 10 car trains, but will only have 5 car trains on the 1st  two lines & a 2.5 car joke of a train on the 3rd line. As of 2025, the 2nd & 3rd lines are still only running 2 car trains. Such a great way to symbolically show the resistance to eventually link YVR to both of the main BC ferry terminals. 

The inadequate 3 lane Lion Bridge still has no bus & HOV tunnels near it. Urban parts of Australia never seemed to have a similar reluctance to build tunnels as does backwards Vancouver. Tunnels for Montreal & Seattle aren't a problem either. At least BC is slated to have a new and improved tunnel by 2030, that's only a couple of generations late.   

Oh, if only people would stop moving to BC, especially Vancouver & Victoria. Well, that's not the case, its just that various BC cities want to only build urban infrastructure that is inadequate. Despite the frustrations that some people have in Alberta, at lest wider bridges, longer trains & taller buildings are allowed there. This watering things down in BC approach is symbolically indicative to refuse to properly build for a growing population. 

Surrey should have already had at least 1 hospital the size of VGH. At least Surrey like Burnaby, can build up taller in what is still mostly a mountain wilderness province. 

BC is a long way from New England & Southern Quebec. The restrictive urban planning measures in Greater Vancouver keep preventing it from becoming a proper big metropolitan area like Greater Boston and Montreal. 

Calgary and Edmonton each should have hand an airport+line by now.

https://en.wikipedia.org/wiki/Green_Line_(MBTA) Calgary will have its own version of a Green Line, eventually. https://jfdatalinks.blogspot.com/search?q=Calgary+Green+Line

Thursday, November 21, 2024

How the City of Vancouver will pay for its 2026 FIFA World Cup costs

 https://dailyhive.com/vancouver/fifa-world-cup-vancouver-hotel-tax-costs

https://vancouver.ca/streets-transportation/bus-network-improvements.aspx With so many narrow streets, its difficult to have a proper network of bus-lanes, especially on the bridges.

https://visionzerovancouver.ca/2024/07/10/take-action-add-bus-lanes-to-translinks-priority-routes Unfortunatly, most of the bridges in the Greater Vancouver Region are just too narrow. There was no logic to have enough extra width for future bus-lanes and HOV lanes.

https://www.biv.com/news/transportation/vancouver-new-dedicated-bus-lanes-translink-2024-9267523

Unless there is a regional network of new bus-bridges, Greater Vancouver will remain in a bottleneck or chokepoint nightmare. Stuck with only a half-assed express or BRT attempt. I suppose that would be impressive to Kelowna-Victoria-Prince+George-Kamloops (K-V-PG-K) standards. Unfortunatly, those aren't big league cities.

Of course the 3rd line, or the YVR-Canada-Line or the Canada (embarrassment) Line, still hasn't been expanded up to a 2.5 car train, let alone having 5 car trains. Right from the start, the trains should have consisted of at least three, 20m coaches, with a provision for 6 car trains. Apparently, because of budget cuts, the station platforms weren't built to be 60-100m long in the first phase, they are only a 50m joke. 

The stations could have been roughed out to initially accomodate 3-4 car trains and eventually, 8 car trains. 8 x 20m= 160m. The Montreal Metro stations were built to accommodate a 152.5m train. Fortunately, Quebec doesn't have anything like a backward BC planning mentality to hinder it.

The YVR-Canada (embarrassment) Line doesn't have to be stuck as a symbolic example to not properly plan & build for longer trains in BC. This 3rd Metro-Vancouver rapid transit line doesn't have to be stuck with a 2.5 car train buildout. The incredibly short stations should be extended to 60m, which could accomodate a proper 3 car, walkthrough train. Then, with Selective_Door_Operation Technology, a 3 car train can become a 5 car train of 100m. Then, only the middle 3 cars would directly have access to the YVR-Canada-Line station platforms. 

Unfortunatly, due to the shortsighted planning mentality that is Vancouver & BC, the underground stations don't have enough level clearance to be lengthened to 152.5m or 500 feet, like the Montreal Metro stations, which can accomodate nine, 55 foot cars. At least a 5 car, 100m or 328 foot train is still possible in short-minded Vancouver.

For some strange reason, the YVR Canada+Line wasn't designed to eventually provide a link beyond the Vancouver_International_Airport to Waterfront_station. Indeed, a 2nd phase of the inadequate line should have connected Waterfront_station with the Park_Royal_Shopping_Centre and the Horseshoe_Bay_ferry_terminal. Then the 3rd phase to connect the YVR-Airport_station with the Tsawwassen_ferry_terminal

Like the Catheter Line, the George_Messey_Tunnel was designed to be inadequate, right from the start.

The George_Massey_Tunnel should have had at least 2 wide emergency lanes for future truck or HOV lanes. Plus, there should have been another tunnel section to accommodate a future express or rapid bus corridor & 2 tracks for a light rail train. Instead, cars, busses & trucks were all funneled into a 4 lane chokepoint. Ironically, over the past few decades, a bus & train tunnel or bridge should have been built, at least.

Express Bus lanes or Rapid Bus lanes vs. HOV & Truck lanes. Any bus lane has the potential to move many more people than any HOV lane. Any major port city & metropolitan area should have a truck lane as well as a bus lane. Thus any HOV lane would be more efficient in bussing people & trucking payloads.

Of course the new George_Massey_Tunnel still won't have a provision for a train section. No emergency lanes, but 2 bus lanes in addition to only 3 general lanes each way. Once again, backward BC gets its wrong. Greater Vancouver is suppose to be a major seaport. Unfortunatly, the new tunnel will only have 4 lanes each way & no HOV or emergency lanes, of course.  

Even if there are only 3 general lanes each way, there should have been a provision for a truck lane in addition to a bus lane each way. That would be at least 5 lanes each way, but no emergency lanes & still no provision for 2 train tracks either. 

Thus, the new tunnel will eventually have to have a bus & train bridge or tunnel next to it. That would allow the tunnel to have 3 general lanes each way & 1 HOV lane each way. A rapid bus & rail corridor would ensure 24 hour high capacity transit, even when the YVR-Canada-Line is shutdown overnight. 

Unfortunatly, none of the 80m & 50m SkyTrain stations were designed to have 4 tracks. That would have allowed for a proper express & local train system. The BC mentality seems to be about keeping the trains as well as the roads inadequate to meet future high transportation demands.

The LG Bridge in Vancouver should have had bus, HOV & train tunnels near it decades ago. Surrey_and_Richmond also should have had proper bus, HOV & train tunnels, decades ago.

Why have 3 sets of tracks like the O'Hare_station in Chicago? Or, have at least have 2 tracks like at the SeaTac/Airport_station. The small-scale YVR-Airport_station just has a single track to make congestion more likely. The Vancouver_International_Airport should have had at least 4 long runways by now.

The multigenerational backwater BC mentality is a combination of overlapping restrictions and a, keep it small or backwards agenda. Why plan and build like a big city, when Vancouver can mostly do things that are only impressive to smaller places like, Kelowna-Victoria-Prince+George-and-Kamloops?

Short trains, mostly stumpy buildings and mostly narrow bridges, provides powerful symbolism for the  antigrowth agenda. Building up proper size infrastructure is the opposite. 


https://jfdatalinks.blogspot.com/search?q=Canada+Line

https://jfdatalinks.blogspot.com/search?q=C+Line

Saturday, April 19, 2025

The narrow bridges of Vancouver, Canada

https://montecristomagazine.com/community/forgotten-bridges-vancouver

The LGB just wasn't designed with any future capacity in mind. 

History of the Lions Gate Bridge https://www.youtube.com/watch?v=JHqi7Kijedw 

https://en.wikipedia.org/wiki/Lions_Gate_Bridge#History

https://upload.wikimedia.org/wikipedia/commons/7/7e/Lions_Gate.jpg 

The inadequate 3 lane LGB is currently the most narrow road bridge in backwards & stubborn Vancouver. It's been in that category since the removal of the 2 lane Fraser Street Bridge in the 1970s. There was a refusal to twin the absurdly narrow LGB between the 1950s & 1970s. By the 1980s there should have been a subway tunnel and an 8 lane tunnel. Then two of the lanes could have been for buses. Georgia+Street is 7 lanes wide as it gets closer to Stanley Park. Thus, the main part of a tunnel through the park could have provided 3 general lanes each way & a bus lane each way. Instead, the 7 lanes of the westernmost part of Georgia Street are funneled into a 3 lane causeway & a 3 lane bridge. The LGB would be fantastic as just a bike & foot crossing, with train, bus & road tunnels well beneath & beside it.    

The Burrard_Bridge, BB or  BSB opened with 6 lanes, but now it only has 4 lanes. There are 2 bike lanes & 2 sidewalks. Had a parallel bike-bridge been built, the BB could have still had 6 lanes. While the BB has a lower level provision for streetcars or tram-trains, Vancouver did its damndest to phase out streetcars well before the 1960s. 

The Ironworkers_Memorial_Bridge has 6 lanes, but should also have had 2 wide shoulders & 2 very wide sidewalks. Unfortunatly, there was no provision for a lower deck, as is also the case with all of the other Vancouver  bridges. https://en.wikipedia.org/wiki/Ironworkers_Memorial_Second_Narrows_Crossing

Any replacement of the inadequate Ironworkers+Memorial+Bridge should be on the scale of what Perth, Seattle and Montreal have done.

https://en.wikipedia.org/wiki/Granville_Street_Bridge#Third_bridge_(1954)

https://www.youtube.com/watch?app=desktop&v=vPSdF0jRTC4 The Granville-Bridge or GSB is the widest bridge in the city limits. It opened with 8 lanes, but is being transformed into a 6 lane bridge with 2 bike lanes & 2 sidewalks. Had there been a paralel bike & foot bride, the GSB could have still been 8 lanes wide. Then there could have been 2 exclusive bus lanes.

https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx

The Oak Street Bridge should have been 8 lanes wide, with 2 wide sidewalks.

The Knight+Street+Bridge should have been 8 lanes with 2 wide sidewalks. Instead, its a 4 lane chokepoint.

The Arthur+Laing+Bridge should have been at least 6 lanes with 2 proper bike lanes & 2 sidewalks.

If the Cambie_Street_Bridge had 2 very wide sidewalks, then its likely that it would still have 6 lanes instead of 5. https://en.wikipedia.org/wiki/Cambie_Bridge#The_present_bridge

Unfortunatly, bottleneck or chokepoint planning is part of the Vancouver & BC mentality.

Of course BC & the Metro+Vancouver Region just hasn't put enough funds and effort towards proper big-city planning & infrastructure development. 

If Perth+and+Seattle had to conform to the extremely restrictive Vancouver approach to things, those cities would be in a perpetual state of chaos. Fortunately, nothing like the BC Mind Virus has ever reached WA.


https://jfdatalinks.blogspot.com/search?q=Lions+Gate+Bridge

https://jfdatalinks.blogspot.com/search?q=Oak+Street+and+Granville+Street 

https://jfdatalinks.blogspot.com/search?q=Oak+Street+Bridge OSB

Tuesday, February 24, 2026

Delays out of North Shore continue after truck stalls for hour on Lions Gate Bridge

 https://vancouver.citynews.ca/2026/02/24/stall-on-lions-gate-bridge-causing-massive-delays-out-of-north-shore/ 

The LGB bottleneck is indicative of how some people don't want Vancouver to become a properly planned functioning big city.

https://www.reddit.com/r/vancouver/comments/1mehud6/theres_a_single_car_stopped_in_the_only/

Unfortunately, Vancouver still isn't allowed to function like a real proper big city. For several decades, so many key people, especially urban planners don't want to have a wider structural crossing to at least match what Prince George and Kamloops have. Or, to match what Kelowna has and especially don't want to have what Ft. McMurray has. 

Indeed, most proper major cities by now would have had a 6-8 lane tunnel right under the park and close to the LGB. Georgia Street is already 7 lanes wide in the first few blocks closest to the park, so the potential for a 7-8 lane tunnel should be possible.

An 8 lane tunnel would be best in that the 3 & 4 lane counterflow on Georgia could easily feed into an 8 lane tunnel. Then once in the tunnel there world be 3 standard lanes each way, plus a bus lane each way. 

A commuter train tunnel or an extension of the YVR-Canada Line should also run close to where the LGB is. Unfortunately, some key people for several decades don't seem to want or understand the benefits of having a train connecting YVR with both of the regional BC-Ferries terminals. That's because it could actually help to relieve transportation congestion. https://www.bcferries.com/current-conditions/TSA-SWB 

At least by now, there should have been a 2 lane BRT tunnel and a 2 lane truck tunnel, as well as at least a provision for a 2 track LRT tunnel beside that very narrow bridge. 

It's always amazing to see what other cities around the world can do, simply because they aren't trapped within the backwards Vancouver mindset or don't have a backwater BC mentality to thwart them. 

https://www.th.gov.bc.ca/atis/lgcws/index.html 

This has to be one of the worlds best examples of bottleneck-chokepoint planning around. 

https://www.translink.ca/schedules-and-maps/skytrain A rail rapid transit connection to both ferry terminals and YVR would be a huge improvement, but it's still not likely in the foreseeable future. 


https://jfdatalinks.blogspot.com/search?q=Lions+Gate+Bridge

Monday, August 12, 2024

Several narrow Vancouver bridge issues

 https://dailyhive.com/vancouver/metro-vancouver-bridge-cyclist-wire-allegations

Someone might have been very angry with bike people and not with car, bus & truck people. The real problem is that so much of the older BC infrastructure just wasn't designed to be more of a multi-modal crossing. The+Lion+Bridge+and+The+Iron+Bridge have no rail rapid transit crossings next them.

The Ironworkers-Bridge is so narrow for a highway bridge in that location & wasn't designed for substantial future capacity. When it was initially designed in the 1950s, there was no concept to have 2 bus lanes, 2 HOV lanes, 2 truck lanes & 2 emergency lanes for a port city. Plus, at least 2 general traffic lanes each way & a provision for 2 train tracks. Thus, the 6 lane bridge is so overwhelmed, because it just can't do the job of an 8-10 lane wide bridge. While the Iron Bridge has 2 improved bike+lanes, they are part of the sidewalks.  

The former 8 lane Granville+Street will have 6 lanes, while the  & Oak+Street only has 4 lanes. The inadequate Oak+Street+Bridge (OSB) should have opened with at least 8 lanes, instead of only 4. Plus, 2 wide emergency lanes & 2 wide sidewalks. There still should be a new southbound OS Bridge, but the city would be against it. A narrow 4 lane bridge just doesn't have the space & capacity for 2 express bus lanes, 2 HOV & 2 truck lanes. Apparently, it's better to just funnel everything into only 2 lanes each way.  

The OSB should be twinned or replace with something like the Samuel-De_Champlain_Bridge in Montreal. The largest city in Quebec is allowed to have a nice wide bridge & long metro trains, because Quebec isn't bound by anything like the backwards BC mentality. 

https://www.theglobeandmail.com/canada/article-montreals-new-44-billion-champlain-bridge-opens-to-traffic-for Fortunatly, the Vancouver mentality wasn't able to ever reach back to Montreal & prevent such a nice modern bridge from being built there. https://www.flatironcorp.com/project/champlain-bridge If you are from Montreal & have visited Vancouver, you will be surprise to see how much shorter an underground Vancouver train station is than what is allowed underground in Montreal, Toronto, Edmonton, Seattle, SF & LA...

https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx A bike & foot bridge should have been built next to it decades ago. Then the Granville+Bridge could have 3 general lanes each way, plus a bus & HOV lane each way. Instead, if 2 bus & HOV lanes are designated, there will only be 2 general lanes each way in the downtown core.

The Burrard Bridge should have had a bike & foot bride next to it. Instead, it was reduced from a 6 lane crossing to a 4 lane bridge.

The very narrow Oak+Street+Bridge & the Knight Street Bridge, should have had bus+and+bike+bridges built next to them decades ago. 

Most bridges in Vancouver & the metropolitan region just weren't designed with that much future capacity in mind, especially for buses & HOV lanes. Thus, it's a travesty that by now, almost every crossing should have had bus & bike bridges built next to them. 

https://vancouver.ca/streets-transportation/walk-bike-and-transit.aspx Unfortunatly, provisions for bus & bike lanes just weren't the thing to do several decades ago in BC.  

A truck lane is just as important as a bus & HOV lane. That's because freight should be efficiently & easily be transported in any major urban region.

https://vancouver.ca/streets-transportation/trucks-commercial-and-oversize-vehicles.aspx 



https://jfdatalinks.blogspot.com/search?q=Oak+Street+and+Granville+Street

https://jfdatalinks.blogspot.com/search?q=Iron+Bridge 

https://jfdatalinks.blogspot.com/search?q=Lion+Bridge 

https://jfdatalinks.blogspot.com/search?q=Burrard+Bridge 

https://jfdatalinks.blogspot.com/search?q=Granville+Bridge 

https://jfdatalinks.blogspot.com/search?q=Oak+Street+Bridge 

https://jfdatalinks.blogspot.com/search?q=the+missing+element

Wednesday, June 17, 2026

Ironworkers Memorial Second Narrows Crossing Collapse of 1958

 https://en.wikipedia.org/wiki/Ironworkers_Memorial_Second_Narrows_Crossing#Collapse 

After the collapse, there was a chance that the Iron_Bridge (IwB) could have been totally redesigned, but this is BC. Its very difficult in BC to design transportation infrastructure with significant future capacity. The Iron Bridge should have been built along the lines of the 12 lane Ship_Canal_Bridge (SCB) in Seattle. https://en.wikipedia.org/wiki/Ship_Canal_Bridge 

Unlike Seattle and Washington State, so much in BC is built to a provincial backwater standard. Thus, nothing on the scale of the SCB has ever been allowed in BC. https://pauldorpat.com/2014/05/17/seattle-now-then-the-ship-canal-bridge Sunce an LRT line wasn't possible for the SCB, it runs sort of parallel in a tunnel to the UW. Of course LRT to UBC is still an incomplete BC pipe dream.

The IwB should have had at least 8 lanes on an upper deck and 4 lanes on a lower deck for extra bus and truck lanes. There should have also been a provision for 2 LRT tracks on a lower deck, but that would be properly planning for the future. 

Unfortunately, the Vancouver Mind Virus (VMV) ruined the Burrard-Bridge. The Burrard_Street Bridge (BSB) opened with 6 lanes and a lower level provision for a double track streetcar crossing.

https://www.vancouverisawesome.com/local-news/5-things-you-probably-didnt-know-about-the-burrard-bridge-7129420 

Foolishly, because the city didn't want to build a parallel bike bridge, 2 lanes were removed from the BSB. This has made it very unlikely that the BSB will be able to have 2 bus lanes. No lower level streetcar crossing was ever built. Yet, a streetcar line on both side of False Creek could have been a nice thing to have up and running. Ironically, Vancouver was one of the first cities to get rid of its streetcars and will likely be one of the last to bring them back. The VMV is such a horrible thing, yet it officially doesn't exist. 



https://jfdatalinks.blogspot.com/search?q=Second+Narrows+Bridge

Monday, August 26, 2024

The Boundary Road Corridor between North Vancouver, Burnaby and Richmond

 https://dailyhive.com/vancouver/boundary-road-vancouver-burnaby-shared-maintenance-history

https://dailyhive.com/vancouver/driving-in-vancouver-the-worst

Boundary+Road should have had a bridge over Burrard_Inlet and over the North_Arm_of_the_Fraser_River by now. A North and South Boundary Road+Bridge could provide a good truck, bus & bike connection between the North Shore, Vancouver & Burnaby. Then between Burnaby & Richmond with a Number 8 Road Bridge. Then a Nelson Road Bridge to Delta and the Deltaport. However, such regional port city infrastructure still seems beyond what the backwater BC mentality can fathom.

https://dailyhive.com/vancouver/boundary-road-bridge-vancouver-burnaby-richmond An April Fools article highlighted the absurdity of Greater Vancouver ignoring or neglecting The Boundary Road Corridor. (BRC)

Boundary+Road has the potential to be a regional north-south axis for trucks, buses, cars & bikes, that would really enable more people & goods to efficiently get around.  


https://jfdatalinks.blogspot.com/search?q=Boundary+Road+Corridor

Friday, April 19, 2024

The 3 Lane Bridge

 A 3 lane bridge, viaduct or tunnel can be great if its for one direction. However, if it's for 2 way traffic, it can easily get very congested, unless its in a rural area.

The Johnson_Street_Bridge in Victoria, BC & the Lions_Gate_Bridge in Vancouver, are quintessential 3 BC lane bottlenecks. How is this possible? Make sure that a bus & HOV tunnel or bridge isn't built next to them. Especially make sure that a heavy rail or a light rail tunnel or bridge isn't built close to them. Thus, both crossings are fine examples of BC congestive planning. It's also crucially symbolic, as BC has been refusing to keep up with urban transportation needs. Thinking big & building big in Texas is no problem, because it's so far away from the backwater BC planning mentality. However, even Alberta & Washington State never seemed interested in taking a backward BC approach to things as well.

If you are from Montreal & haven't visited Vancouver or Victoria, nothing can prepare you for the shock, if you ever do. As preparation, it might be good to drive over to Jacques+Bizard+Blvd and then over the 3 lane Jacques_Bizard_Bridge. Of course this is in a backwater part of Montreal. However, imagine if this 3 lane bottleneck was at one of the main crossings in Montreal. Well, that's what you would have to prepare yourself for, if you visit Vancouver or Victoria. Whether its a low level bridge or a high level bridge, as long as it's a 3 lane chokepoint, it meets the BC standard. Fortunately, Montreal was able to build a new bridge there, simpy because it doesn't have a Vancouver like mentality. https://montreal.ca/en/articles/building-new-bridge-pont-jacques-bizard-26379

The Windsor+Bridge is a backwater, 3 lane Sydney crossing. Just imagine if that was on the edge of the CBD. Well, if you are from NSW & you visit backwards BC, nothing can prepare you for such narrow bridges, short trains & stumpy buildings. Fortunately, nothing like the BC mentality was ever allowed to take over NSW.

If you are from New_Haven,_Connecticut, you might be shocked if you visit the 2 largest urban areas in the BC part of Canada.

https://www.google.com/maps/place/New+Haven,+CT,+USA/@41.3012189,-72.9233923,83m/data=!3m1!1e3!4m6!3m5!1s0x89e7d8443a8070e5:0xf6a354c659b264ed!8m2!3d41.308274!4d-72.9278835!16zL20vMGYybmY?entry=ttu 3L next to 8L.


https://www.google.com/maps/place/Ted+Smout+Memorial+Bridge,+Brisbane,+Australia

"The bridge features

  • 3 traffic lanes (originally 2 for regular traffic and a T2 (bus, taxi and vehicles with more than 2 occupants) lane, but the T2 lane has now been converted to a regular lane).
  • A 4.5 m (15 ft) wide pedestrian and cycle path that connects footpath and cycle networks on either side of Bramble Bay. The path is separated from traffic by a concrete barrier." https://en.wikipedia.org/wiki/Ted_Smout_Memorial_Bridge Of course after duplication, it became a 6 lane crossing.

Friday, December 26, 2025

Would people pay a bridge toll if it helps solve traffic woes on the North Shore?

 https://www.nsnews.com/opinion/letter-i-would-gladly-pay-a-bridge-toll-if-it-helps-solve-our-traffic-woes-11665442 

https://en.wikipedia.org/wiki/North_Shore_(Greater_Vancouver) 

As of 2026, no bus, car, truck and commuter train tunnel was ever built near the extremely inadequate 3 lane Lions+Gate+Bridge. For if there had then, the LGB could have become a nice bike and foot crossing.

Of course no bus, truck and commuter train bridge was built next to the Iron+Bridge. The inadequate Iron Bridge is so narrow that there isn't any room for emergency lanes and especially no proper express or rapid bus lanes.

By now, there should be a SeaBus crossing of at least every 5 minutes in both directions. 

Its extremely difficult to bring the Greater Vancouver Region up to a proper urban transportation standard. Partly because this is part of backwards BC and partly because there is just such a lack of a normal big city vision. 

For some reason, congestive transportation planning just isn't that popular outside of backwards Vancouver, BC.

Monday, January 13, 2025

Still, No Twinning the Lions Gate Bridge, and for good reason, sort of

The Lions+Gate+Bridge has been the quintessential, multigenerational symbol of backwards Vancouver planning. While it has a couple of nice bike lanes & sidewalks, the one deck bridge is too narrow for an efficient express bus & train crossing. This is a crossing area that should be on a grand scale like The Sydney_Harbour_Bridge and Harbour_TunnelHowever, the Vancouver version would just focus on the tunnel portion. 

https://viewpointvancouver.ca/2017/09/28/twinning-the-lions-gate-bridge/

https://viewpointvancouver.ca/2013/10/04/1939-traffic-on-and-above-the-lions-gate-bridge/

https://viewpointvancouver.ca/2014/10/21/trick-question-how-fast-has-traffic-been-growing-on-the-lions-gate-bridge/

By now, there should have been a 6 lane highway tunnel, plus 2 dedicated express bus lanes and at least a double track train tunnel. Then the LG Bridge could remain as a very nice bike & foot crossing. 

https://globalnews.ca/news/1946543/government-says-lions-gate-bridge-will-not-close-to-cars-come-2030

Unlike Vancouver, Sydney, SF, Seattle and Montreal don't use water as an excuse to hold back their cities scale of transportation infrastructure.


https://jfdatalinks.blogspot.com/search?q=Lions+Gate+Bridge

https://jfdatalinks.blogspot.com/search?q=LGB