Showing posts sorted by date for query Tsawwassen ferry terminal. Sort by relevance Show all posts
Showing posts sorted by date for query Tsawwassen ferry terminal. Sort by relevance Show all posts

Tuesday, November 18, 2025

The Tsawwassen, Delta Dilemma

 https://dailyhive.com/vancouver/tsawwassen-town-centre-redevelopment-delta-housing-supply-rejection 

Unfortunatly, there are some serious examples of poor transportation planning in backwards BC. There never seemed to be a multistage plan to gradually have at least 5 car trains running between YVR and the BC Ferry terminal. Indeed, the YVR-Canada Line has stations that are only designed to eventually accomodate a 2.5 car train, not 5 cars. Plus, no train tunnel or bridge into Delta. 

https://en.wikipedia.org/wiki/Roberts_Bank_Superport

https://www.delta-optimist.com/local-news/competing-proposals-for-deltaport-expansion-still-not-over-11215614 

https://www.portvancouver.com/project/deltaport-truck-staging-facility 

Despite being on the same ocean, but half a world away, the Port_of_Brisbane has much better highway and freight railway infrastructure in place. 

While the YVR Line or the Canada (Embarrassment) Line only runs trains that are a 2 car joke, Brisbane actually has a proper big city Airport_railway_line with longer trains. 

https://en.wikipedia.org/wiki/Airport_railway_line,_Brisbane#Criticism While long trains are better for capacity, a frequent number of trains per hour is also important.

https://en.wikipedia.org/wiki/Domestic_Airport_railway_station,_Brisbane  

https://en.wikipedia.org/wiki/Brisbane_Airport#Rail  

https://upload.wikimedia.org/wikipedia/commons/f/fd/Airtrain_NGR_Indigenous.jpg

Fortunately, Queensland was never stunted by anything like a BC Mind Virus (BCMV).

Wednesday, October 15, 2025

The Battle continues over Vancouver Aquatic Centre

 https://globalnews.ca/video/11480236/battle-continues-over-vancouver-aquatic-centre-renovations 

There isn't officially a Vancouver Mind Virus (VMV), but somehow through the decades, the KEEP VANCOUVER SMAL AND BACKWARDS mentality keeps manifesting.

https://cityhallwatch.wordpress.com/2025/10/15/aquatic-centre-25vs50m-officials-misled "This scandal exposes how Vancouver’s development approval processes can be corrupted if staff predetermine outcomes and manufacture justifications rather than conducting evidence-based analysis. If municipal staff can systematically mislead elected representatives on a project this significant—with technical evidence this clear—what other decisions have been corrupted in the past or could be corrupted in the future?"

Why have a modern full-size pool, when there can be a half size, Half-A$$ED pool? That's the VMV resurfacing again.

https://vancouversun.com/news/proposed-vancouver-aquatic-centre-seeks-height-density-relaxations "Swimmers have mounted a court petition over plans to replace the 50-metre Olympic-sized pool with one half that length"

A scaled down Vancouver+Aquatic+Centre is part of the pay more to get less mentality. One of the most obvious ways to perpetuate the BC antigrowth agenda is to go backwards and build smaller infrastructure. Where does the money go if it's not always going towards proper big city size infrastructure?

Half sized buildings, half sized trains, half sized bridges, that's the VMV & BCMV in action. 

https://jfdatalinks.blogspot.com/search?q=SHIT-BOX 

https://jfdatalinks.blogspot.com/search?q=Lions+Gate+Bridge An absurd 3 lane bridge without a parallel bus and train tunnel to help relieve this quintessential chokepoint. 

https://jfdatalinks.blogspot.com/search?q=Canada+Line A 2 car train that should have started with 5 cars, but can only be expanded into a 2.5 car train, someday. 

https://jfdatalinks.blogspot.com/search?q=Richmond-Delta+Tunnel No provision for a train tunnel, because that would make it easier to have a line connecting YVR with the Tsawwassen+ferry+terminal. Just like there is no desire to have a train between YVR and the Horseshoe+Bay+ferry+terminal.

This Vancouver and BC Mind Virus is horrible, because it keeps stunting the potential of BC by watering down the infrastructure.

Tuesday, August 12, 2025

The Lion Bridge and The Iron Bridge

https://jfdatalinks.blogspot.com/search?q=Lion+Bridge As of 2025, still no official plan for a train tunnel and a bus & HOV tunnel. A 3-4 track train tunnel and a 6-8 lane road tunnel would actually improve that absurd 3 lane crossing area.  

https://jfdatalinks.blogspot.com/search?q=Iron+Bridge As of 2025, still no official construction plan to add a 4 lane bus & HOV bridge, plus a 3-4 track rapid transit train bridge. 

Why a 3-4 track train tunnel or bridge? Someday, enough sensible people might realize the benefit and importance of having a train linking the Horseshoe+Bay+ferry+terminal to YVR and to the Tsawwassen+ferry+terminal

Unfortunatly, when so much money was wasted on a $HIT-PIPE and a $HIT-BOX, more money was lost that could have gone towards improving transit to & from the North Shore.


https://jfdatalinks.blogspot.com/search?q=The+Lion+Bridge+and+The+Iron+Bridge 

https://jfdatalinks.blogspot.com/search?q=Lions+Gate+Bridge

Friday, July 25, 2025

Who controls the 3 lane Lions Gate Bridge?

 https://www.cbc.ca/news/canada/british-columbia/who-controls-the-centre-lane-on-the-lions-gate-bridge-1.7589996

The LGB has to be the worst or at least one of the worst traffic bottlenecks & chokepoints on the planet. Over the course of the past several decades, there should have been a bus and HOV tunnel and then a train tunnel close to the alignment of the LGB. 

Seven lanes of Georgia+Street funneled into a 3 lane LGB is nuts! The LGB is already a nice bike bridge, with sidewalks, but it should also be a bus bridge. That would be possible if a proper big city tunnel was built. An eight-lane-tunnel would really help the LGB.

Of course in both cases, the Lion Bridge was never expanded, twinned or duplicated & the M Tunnel (H-99) wasn't replace with a 10 lane bridge. Unfortunatly, no serious consideration for rail rapid transit was considered for both crossings. It was as if the regional & BC governments just didn't think it was that important to have a train from the Horseshoe+Bay+ferry+terminal and the Park+Royal+Shopping+Centre to Vancouver-International-Airport. Just like not having a train from the Tsawwassen+ferry+terminal and Tsawwassen+Mills to the airport. 

Despite Richmond,_British_Columbia having YVR, its as if no one really considered that Richmond should be a major intermodal transportation hub. Proper Transportation Planning has always been lacking in backwards BC.

https://www.theprogress.com/news/province-receives-business-case-for-new-massey-crossing-1911335

https://www.highway99tunnel.ca While an 8 lane tunnel is a good start as the first phase, eventually there will have to be a train, bus & bike bridge (or tunnel) next to it.

https://www.highway99tunnel.ca/project-overview-frt Then the H-99 tunnel could be 3 lanes each way with the 4th as a HOV lane. A new parallel bridge (or tunnel) could then have 2 rapid bus lanes, as well as 2 wide sidewalks & 2 wide bike-lanes. Extra width could allow for eventually 2 tracks, 2 HOV lanes, in addition to the 2 bus lanes. That would enable the H-99 tunnel to ultimately have 4 general lanes each way in a later phase. Of course it would have been better to do things correct right from the start, but that goes against the backwards BC mentality.

Its so sad that there was never a proper big city vision to have an airport+train connect to both ferry terminals. 

Thursday, June 26, 2025

Airport rail links

 https://en.wikipedia.org/wiki/Airport_rail_link 

An airport+line should always be designed with future capacity in mind.

https://en.wikipedia.org/wiki/Airport_rail_link#Connection_types

https://en.wikipedia.org/wiki/Airport_rail_link#High-speed_rail_and_inter-city_rail

https://en.wikipedia.org/wiki/Airport_rail_link#Regional_rail_and_commuter_rail


 The Canada+Line is such a sad and pathetic joke. Nevermind planning for a 10 car train linking YVR with the Horseshoe+Bay+ferry+terminal and the Tsawwassen+ferry+terminal to YVR, BC opted for a half-assed little train. Apparently, its logical in backwards BC to not allow for future clearance to at least have a 5 car train connecting YVR with West Vancouver & Delta. It was difficult enough just to have a small 2 car train & eventually a 2.5 car train between Vancouver & Richmond. 

https://en.wikipedia.org/wiki/SeaTac/Airport_station While Seattle can have a 2 car short train, the SeaTac_Airport_Station was designed to accommodate a proper big city long train.

Unlike in backwards BC, the Seattle_Central_Link Airport Station has 2 tracks. https://upload.wikimedia.org/wikipedia/commons/2/26/SeaTac_light_rail_station_from_airport_parking_garage_%282010%29.jpg Most proper cities around the world plan & build big infrastructure or at least allow for future expansion clearence.

https://en.wikipedia.org/wiki/SeaTac/Airport_station#Station_layout


https://en.wikipedia.org/wiki/RER_B#List_of_RER_B_stations

https://en.wikipedia.org/wiki/Leonardo_Express

https://en.wikipedia.org/wiki/Jazz_(Italian_EMU)


https://en.wikipedia.org/wiki/San_Francisco_International_Airport_station

https://www.bart.gov/stations/sfia  https://www.bart.gov/guide/airport/sfo    


https://jfdatalinks.blogspot.com/search?q=airport+line

Saturday, May 24, 2025

Thursday, May 1, 2025

Horseshoe Bay upgrades

 https://dailyhive.com/vancouver/bc-ferries-passenger-booking-changes-horseshoe-bay-upgrades

Its very strange that there wasn't any proper planning to have a train connecting the Horseshoe+Bay+ferry+terminal, YVR and the Tsawwassen+ferry+terminal.

https://dailyhive.com/vancouver/bc-ferries-popular-route-busy-weekend

Unfortunatly, it was difficult enough just to have a 2 car SkyTrain-Canada+Line between Vancouver & Richmond, nevermind the Tsawwassen ferry terminal.

Saturday, February 1, 2025

This Day in History 1960: Phil Gaglardi, a bulldozer and the Tsawwassen ferry terminal

B.C. Ferries was announced after the two privately owned ferries to Vancouver Island both went on strike https://vancouversun.com/news/this-day-in-history-1960-phil-gaglardi-tsawwassen-ferry-terminal?tbref=hp

Unfortunatly, then & now, there seems to be no plan to have a train from the Tsawwassen+ferry+terminal to YVR.



Monday, September 16, 2024

Climate change costs growing for B.C. municipalities

 https://www.vancouverisawesome.com/highlights/climate-change-costs-growing-for-bc-municipalities-9530035

This is very sad & pathetic for the largest urban part of BC. Most of the major bridges in Greater Vancouver should already have had bus & bike bridges built next to them. However, that would go against the bottleneck or chokepoint planning mentality.

The first 2 SkyTrain lines are still only running 4 car trains of the newer coaches. The 3rd line, C Line or Canada Line is still only running 2 car joke of a train. Fortunately, most real cities will at least run 6, but usually 8, 9 or 10 car trains. Again, that would go against the congestive planning approach, which BC has favoured for several generations.

So, one of the big questions is, why isn't a significant portion of climate change funds going into the BC infrastructure? Especially for longer trains and stations and express bus bridges.

https://www.vancouverisawesome.com/opinion/geoff-johnson-educators-need-to-begin-planning-for-coming-population-bump-9500192

Schools & hospitals for decades were designed not to easily be expanded. The multigenerational BC agenda is to hold things back for as long as possible. Long trains & wide bridges are symbolic of accommodating growth. Thus, congestive planning is symbolic of not putting enough funds into the infrastructure. Thus, another big question is, where has the money gone through the decades, because the infrastructure is always lagging?


"Duke Point is a major ferry terminal owned and operated by BC Ferries that provides ferry service across the Strait of Georgia to Tsawwassen. The ferry terminal is located at Duke Point in Nanaimo and is the only major terminal in the BC Ferries system without a public transit connection." https://en.wikipedia.org/wiki/Duke_Point_ferry_terminal

Tuesday, May 2, 2017

Is Tsawwassen Mills is one of Metro Vancouver's worst urban planning mistakes?

http://dailyhive.com/vancouver/tsawwassen-mills-worst-urban-planning-metro-vancouver

Instead of having a train between the ferry terminal, the mall and YVR, Delta remains underserved by public transit, as well as inadequate roads. Had there been better urban transportation planning, Tsawwassen+Mills could have been an easy stop in-between the Delta ferry terminal and Richmond and the airport (YVR). 

Greater Vancouver & BC continually opt for under capacity transportation choices. It's like there has been an unofficial, multi decade agenda to encourage congestive planning. Fortunately, most urban regions around the world refuse to follow the backwards BC approach to things.