Showing posts sorted by date for query Horseshoe Bay. Sort by relevance Show all posts
Showing posts sorted by date for query Horseshoe Bay. Sort by relevance Show all posts

Sunday, March 29, 2026

YVR-Canada Line and REM

 https://www.youtube.com/watch?v=a1ouk0VifwM&t=42s Even if the YVR-Canada Line had to initially be built as a symbolically small city train, urban transportation infrastructure can be designed in ways that can double or even triple capacity to meet future demand. Unfortunately, its very difficult to build anything in BC with significant future capacity in mind.

Ultimately, the YVR-Canada Line should have had level station clearances to eventually be able to accommodate 10 car trains. Unfortunately, in typical backwards BC planning the stations weren't even designed with enough level clearance to accommodate 5 car trains. The joke that is the Canada Line only has a level station clearance of 50m to eventually accommodate just a 2.5 car train. 

Most other cities actually build long stations to accommodate long trains right in the first place. Or, at least allow for enough level clearance so that the stations can eventually be doubled or tripled in length. 

The YVR-Canada Line should have started with the Vancouver & Richmond segment, then the Vancouver and Horseshoe+Bay+ferry+terminal segment. Then finally, the YVR to Delta and the Tsawwassen+ferry+terminal

The SkyTrain Stations in Greater Vancouver https://www.youtube.com/watch?v=6Qg78Bmf1fk

Unfortunately, proper big city transportation planning is very difficult to achieve in backwards BC. So much is watered down in Vancouver.


Montreal’s Biggest REM Expansion Yet https://www.youtube.com/watch?v=4G1oeIAfxDU&t=106s 

The Montreal REM https://www.youtube.com/watch?v=g9O6RzsXIqQ 

While the REM was designed to help the Metro, it should have the capability to be gradually expanded. Eventually, REM trains should be lengthened from 4 car trains to 6 and even 8 car trains. 

In contrast, every Skytrain line should have been designed with enough level future station clearance to eventually accommodate a train as long as a 152.5 (500 ft.) long Montreal Metro train. The first 2 Skytrain lines have 80m stations and the joke that is the Canada Line only has 50m stations. 

While the first 2 lines can accommodate 5 car trains, the C Line wasn't designed to accommodate 5 car trains. Just 2.5 car trains, someday. 

Despite there being such a symbolic push for Vancouver to keep having short trains, narrow bridges and stumpy buildings, things are gradually changing in backwards BC. The Vancouver or BC Mind Virus should have been challenged decades ago, but too many loud people wanted to perpetuate the, KEEP THINGS SMALL AND INDEQUATE agenda.

Given how most of the bridges in Greater Vancouver are so narrow, there isn't enough room for proper bus and HOV lanes, or even wide emergency lanes. One would think that at least the trains & stations would have been designed to eventually be doubled or tripled in length. But that would go against the mutigenerational congestive planning agenda. That's why there still is only a 3 lane LGB when there should have been at least a parallel bus, HOV and train tunnel. The Pattullo+Bridge replacement didn't open with 2 bus and 2 HOV lanes, not even wide shoulders or emergency lanes. NW really likes the congestive planning approach. Of course the new tunnel between Richmond and Delta won't have an additional provision for a train tube. This will also help to perpetuate the congestive transportation mandate. 

Fortunately, Selective_door_operation technology can eventually allow more sensible transportation planners to enable longer trains. 

https://en.wikipedia.org/wiki/Selective_door_operation#International_variations , https://www.youtube.com/watch?v=YdH5d1ZthmM 

This means that a 5 car Skytrain (85m) could eventually become a 7 car train, despite the 80m stations. 

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)_rolling_stock#Alstom_Mark_V Thus, an 80m train can become a 117m train.

A two car and 2.5 car (50m) train on the multibillion dollar Canada Line is so absurd and inept! With some slight station modifications, there could be a potential to eventually accommodate three, 20m cars at such short platforms. Then, once 3 car trains could become possible, its just a matter of having an extra 20m car at both ends of each train. A 5 car train of 100m is so much better than a 50m joke of a train. 

https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)#Alstom_Mark_V_fleet 


https://jfdatalinks.blogspot.com/search?q=SkyTrain-Canada+Line

https://jfdatalinks.blogspot.com/search?q=REM

Wednesday, March 4, 2026

Major expansion of B.C. Highway 1 in Fraser Valley to begin soon

 https://dailyhive.com/vancouver/bc-highway-1-fraser-valley-expansion Ideally, the section from Horseshoe Bay to Hope shouldn't be a hopeless joke. A main highway in an urban region of over 3 million people should have at least 3 general lanes each way. Plus, a rapid bus lane and a HOV lane each way, but that would be at least 5 lanes each way. 

https://transcanadahighway.com/british-columbia/bc-highway-itinerary-horseshoe-bay-to-hope When a highway is only 2-3 lanes each way, it's too damn narrow to accomodate 2 bus lanes and 2 HOV lanes.

https://en.wikipedia.org/wiki/British_Columbia_Highway_1#Lower_Mainland_section 

BC Hwy 1 - Trans-Canada Highway, Vancouver, BC https://www.youtube.com/watch?v=uf9QTmnxkqw

Wednesday, October 15, 2025

The Battle continues over Vancouver Aquatic Centre

 https://globalnews.ca/video/11480236/battle-continues-over-vancouver-aquatic-centre-renovations 

There isn't officially a Vancouver Mind Virus (VMV), but somehow through the decades, the KEEP VANCOUVER SMAL AND BACKWARDS mentality keeps manifesting.

https://cityhallwatch.wordpress.com/2025/10/15/aquatic-centre-25vs50m-officials-misled "This scandal exposes how Vancouver’s development approval processes can be corrupted if staff predetermine outcomes and manufacture justifications rather than conducting evidence-based analysis. If municipal staff can systematically mislead elected representatives on a project this significant—with technical evidence this clear—what other decisions have been corrupted in the past or could be corrupted in the future?"

Why have a modern full-size pool, when there can be a half size, Half-A$$ED pool? That's the VMV resurfacing again.

https://vancouversun.com/news/proposed-vancouver-aquatic-centre-seeks-height-density-relaxations "Swimmers have mounted a court petition over plans to replace the 50-metre Olympic-sized pool with one half that length"

A scaled down Vancouver+Aquatic+Centre is part of the pay more to get less mentality. One of the most obvious ways to perpetuate the BC antigrowth agenda is to go backwards and build smaller infrastructure. Where does the money go if it's not always going towards proper big city size infrastructure?

Half sized buildings, half sized trains, half sized bridges, that's the VMV & BCMV in action. 

https://jfdatalinks.blogspot.com/search?q=SHIT-BOX 

https://jfdatalinks.blogspot.com/search?q=Lions+Gate+Bridge An absurd 3 lane bridge without a parallel bus and train tunnel to help relieve this quintessential chokepoint. 

https://jfdatalinks.blogspot.com/search?q=Canada+Line A 2 car train that should have started with 5 cars, but can only be expanded into a 2.5 car train, someday. 

https://jfdatalinks.blogspot.com/search?q=Richmond-Delta+Tunnel No provision for a train tunnel, because that would make it easier to have a line connecting YVR with the Tsawwassen+ferry+terminal. Just like there is no desire to have a train between YVR and the Horseshoe+Bay+ferry+terminal.

This Vancouver and BC Mind Virus is horrible, because it keeps stunting the potential of BC by watering down the infrastructure.

Wednesday, August 20, 2025

Popular Vancouver outdoor pool forced to close until further notice

 https://dailyhive.com/vancouver/new-brighton-pool-closed-mechanical-issue

Its strange that the area from Horseshoe+Bay to Hope,_BC, which has over 3 million people, only has a few outdoor swimming pools. That's the, pay more and get LE$$ in BC approach to things.

https://vancouver.ca/parks-recreation-culture/swimming-pools.aspx While Vancouver has less than a million people, the Lower_Mainland of BC does have over 3 million residents.

https://604now.com/vancouver-will-be-opening-more-outdoor-swimming-pools-this-may-long-weekend Unfortunatly, the Greater Vancouver Region should have had two dozen swimming pools by now, with most of them being enclosed.


https://jfdatalinks.blogspot.com/search?q=swimming+pools

Tuesday, August 19, 2025

Vancouver harbour sailings

 https://www.vancouverisawesome.com/travel/vancouver-cruises-top-harbour-sailings-2025-11093357  

The SeaBus and the Aqua-Bus just aren't enough, there needs to be more capacity.

https://en.wikipedia.org/wiki/SeaBus , https://theaquabus.com/

https://www.translink.ca/schedules-and-maps/seabus 

https://en.wikipedia.org/wiki/SeaBus#Service Ideally, there should be a daytime departure every 5 minutes & 10 minutes during the evening.

https://www.translink.ca/schedules-and-maps/line/seabus/direction/0/schedule 

https://en.wikipedia.org/wiki/SeaBus#History

As of 2025, there still isn't a Downtown to Deep+Cove ferry and not in 2026 either. Thus, the 6 lane Iron+Bridge will still be overloaded. Had the bridge been constructed to have very wide shoulders, there could have been an efficient bus lane each way. Instead, any bus is stuck in the almost perpetual traffic jam. A Boundary+Road Bridge could make for an excellent bus and HOV lane crossing consisting of at least 4 lanes, with a provision for a middle rail section.

Of course there is no ferry from Downtown+Vancouver to the Horseshoe+Bay+ferry+terminal. Just like there is no train from Horseshoe+Bay to Deep+Cove and to the Tri-Cities

It's strange that the North-Shore didn't keep up with improving its passenger rail system.

https://en.wikipedia.org/wiki/North_Shore_(Greater_Vancouver) , https://monova.ca/the-story-of-streetcar-153/


https://jfdatalinks.blogspot.com/search?q=Tri-Cities

Friday, August 15, 2025

Taking a second look at a third crossing for the North Shore

 https://www.nsnews.com/opinion/eve-lazarus-taking-a-second-look-at-third-crossings-for-the-north-shore-11084045

You couldn't have a worse congestion scenario there. 

https://www.westernstandard.news/topic/lions-gate-bridge An enduring 3 lane pathetic joke of a bridge! No bus & HOV tunnel & especially no train tunnel around there.

https://www.westernstandard.news/topic/ironworkers-memorial-bridge A 6 lane crossing that should have had at least 2 emegency lanes & 2 wide shoulders for future dmand. No bus & HOV bridge & especially no train bridge around there.

No one ever stopped the Horseshoe+Bay+ferry+terminal from being built. However, its like various people have done their damndest to make sure that no express bus lanes & no HOV lanes cross the inlet, & especially no rail rapid transit. It's so sad that the congestive planning folks keep rising to the top of the B$.

https://vancouversun.com/news/local-news/this-week-in-history-1967-wacky-bennett-and-tom-terrific-team-up-to-push-for-a-third-crossing

Tuesday, August 12, 2025

The Lion Bridge and The Iron Bridge

https://jfdatalinks.blogspot.com/search?q=Lion+Bridge As of 2025, still no official plan for a train tunnel and a bus & HOV tunnel. A 3-4 track train tunnel and a 6-8 lane road tunnel would actually improve that absurd 3 lane crossing area.  

https://jfdatalinks.blogspot.com/search?q=Iron+Bridge As of 2025, still no official construction plan to add a 4 lane bus & HOV bridge, plus a 3-4 track rapid transit train bridge. 

Why a 3-4 track train tunnel or bridge? Someday, enough sensible people might realize the benefit and importance of having a train linking the Horseshoe+Bay+ferry+terminal to YVR and to the Tsawwassen+ferry+terminal

Unfortunatly, when so much money was wasted on a $HIT-PIPE and a $HIT-BOX, more money was lost that could have gone towards improving transit to & from the North Shore.


https://jfdatalinks.blogspot.com/search?q=The+Lion+Bridge+and+The+Iron+Bridge 

https://jfdatalinks.blogspot.com/search?q=Lions+Gate+Bridge

Friday, July 25, 2025

Who controls the 3 lane Lions Gate Bridge?

 https://www.cbc.ca/news/canada/british-columbia/who-controls-the-centre-lane-on-the-lions-gate-bridge-1.7589996

The LGB has to be the worst or at least one of the worst traffic bottlenecks & chokepoints on the planet. Over the course of the past several decades, there should have been a bus and HOV tunnel and then a train tunnel close to the alignment of the LGB. 

Seven lanes of Georgia+Street funneled into a 3 lane LGB is nuts! The LGB is already a nice bike bridge, with sidewalks, but it should also be a bus bridge. That would be possible if a proper big city tunnel was built. An eight-lane-tunnel would really help the LGB.

Of course in both cases, the Lion Bridge was never expanded, twinned or duplicated & the M Tunnel (H-99) wasn't replace with a 10 lane bridge. Unfortunatly, no serious consideration for rail rapid transit was considered for both crossings. It was as if the regional & BC governments just didn't think it was that important to have a train from the Horseshoe+Bay+ferry+terminal and the Park+Royal+Shopping+Centre to Vancouver-International-Airport. Just like not having a train from the Tsawwassen+ferry+terminal and Tsawwassen+Mills to the airport. 

Despite Richmond,_British_Columbia having YVR, its as if no one really considered that Richmond should be a major intermodal transportation hub. Proper Transportation Planning has always been lacking in backwards BC.

https://www.theprogress.com/news/province-receives-business-case-for-new-massey-crossing-1911335

https://www.highway99tunnel.ca While an 8 lane tunnel is a good start as the first phase, eventually there will have to be a train, bus & bike bridge (or tunnel) next to it.

https://www.highway99tunnel.ca/project-overview-frt Then the H-99 tunnel could be 3 lanes each way with the 4th as a HOV lane. A new parallel bridge (or tunnel) could then have 2 rapid bus lanes, as well as 2 wide sidewalks & 2 wide bike-lanes. Extra width could allow for eventually 2 tracks, 2 HOV lanes, in addition to the 2 bus lanes. That would enable the H-99 tunnel to ultimately have 4 general lanes each way in a later phase. Of course it would have been better to do things correct right from the start, but that goes against the backwards BC mentality.

Its so sad that there was never a proper big city vision to have an airport+train connect to both ferry terminals. 

Thursday, June 26, 2025

Airport rail links

 https://en.wikipedia.org/wiki/Airport_rail_link 

An airport+line should always be designed with future capacity in mind.

https://en.wikipedia.org/wiki/Airport_rail_link#Connection_types

https://en.wikipedia.org/wiki/Airport_rail_link#High-speed_rail_and_inter-city_rail

https://en.wikipedia.org/wiki/Airport_rail_link#Regional_rail_and_commuter_rail


 The Canada+Line is such a sad and pathetic joke. Nevermind planning for a 10 car train linking YVR with the Horseshoe+Bay+ferry+terminal and the Tsawwassen+ferry+terminal to YVR, BC opted for a half-assed little train. Apparently, its logical in backwards BC to not allow for future clearance to at least have a 5 car train connecting YVR with West Vancouver & Delta. It was difficult enough just to have a small 2 car train & eventually a 2.5 car train between Vancouver & Richmond. 

https://en.wikipedia.org/wiki/SeaTac/Airport_station While Seattle can have a 2 car short train, the SeaTac_Airport_Station was designed to accommodate a proper big city long train.

Unlike in backwards BC, the Seattle_Central_Link Airport Station has 2 tracks. https://upload.wikimedia.org/wikipedia/commons/2/26/SeaTac_light_rail_station_from_airport_parking_garage_%282010%29.jpg Most proper cities around the world plan & build big infrastructure or at least allow for future expansion clearence.

https://en.wikipedia.org/wiki/SeaTac/Airport_station#Station_layout


https://en.wikipedia.org/wiki/RER_B#List_of_RER_B_stations

https://en.wikipedia.org/wiki/Leonardo_Express

https://en.wikipedia.org/wiki/Jazz_(Italian_EMU)


https://en.wikipedia.org/wiki/San_Francisco_International_Airport_station

https://www.bart.gov/stations/sfia  https://www.bart.gov/guide/airport/sfo    


https://jfdatalinks.blogspot.com/search?q=airport+line

Wednesday, June 18, 2025

Capilano Mall redevelopment

 https://dailyhive.com/vancouver/capilano-mall-redevelopment-concept-proposal-north-vancouver-ocp

https://www.realestatenorthshore.com/news/market-minute/capilano-malls-big-makeover/

https://www.nsnews.com/local-business/new-capilano-mall-design-concept-includes-11-towers-in-two-distinct-neighbourhoods-9909160

https://dailyhive.com/vancouver/capilano-mall-north-vancouver-redevelopment-concept-quadreal

https://vancouvermarket.ca/2024/11/29/vision-for-capilano-mall-redevelopment-includes-11-towers-up-to-3100-units/

https://www.google.com/search?q=Bus+from+Horseshoe+Bay+to+Deep+Cove&sca_esv=e3d65ffe3d8fa1f9&rlz=1C1GCEA_enCA1111CA1111&ei=AJNUaNKBDY-A0PEP6e-DAQ&ved=0ahUKEwjSgbiAyP6NAxUPADQIHen3IAAQ4dUDCBA&uact=5&oq=Bus+from+Horseshoe+Bay+to+Deep+Cove&gs_lp=Egxnd3Mtd2l6LXNlcnAiI0J1cyBmcm9tIEhvcnNlc2hvZSBCYXkgdG8gRGVlcCBDb3ZlMgUQIRigATIFECEYoAFIzbsBUPAOWMGhAXAEeACQAQCYAXmgAe4NqgEEMTkuM7gBA8gBAPgBAZgCFaACnAzCAgoQABiwAxjWBBhHwgIIEAAYogQYiQXCAggQABiABBiiBMICBRAAGO8FwgIEECEYCpgDAIgGAZAGCJIHBDE3LjSgB8BfsgcEMTMuNLgHiQzCBwcwLjUuOS43yAdz&sclient=gws-wiz-serp

https://www.google.com/maps/place/Park+Royal+Shopping+Centre/@49.3215815,-123.140681,4438m/data=!3m2!1e3!5s0x54866e21b91a48ed:0x881f1844f26c98ec!4m15!1m8!3m7!1s0x548673f143a94fb3:0xbb9196ea9b81f38b!2sVancouver,+BC!3b1!8m2!3d49.2827291!4d-123.1207375!16zL20vMDgwaDI!3m5!1s0x54866e21a9e5b05d:0x1efd06dca728ade9!8m2!3d49.3254254!4d-123.1352761!16zL20vMGIxMjA5?entry=ttu&g_ep=EgoyMDI1MDYxNi4wIKXMDSoASAFQAw%3D%3D

https://www.google.com/maps/place/Capilano+Mall

https://jfdatalinks.blogspot.com/search?q=Horseshoe+Bay

Saturday, May 24, 2025

Is the Tsawwassen Mills (mall) set for an expansion?

 https://dailyhive.com/vancouver/tsawwassen-mills-expansion-dining-entertainment-upgrades

https://www.destinationvancouver.com/things-to-do/tsawwassen-mills-central-walk-tsawwassen-mills-inc

https://vancouversun.com/news/bc-billionaire-mall-owner-seeks-hudsons-bay-leases

https://centralwalk.com/tsawwassen-mills/

https://www.stantec.com/en/projects/canada-projects/t/tsawwassen-mills

https://www.tsawwassenmills.com/

Its mindboggling that there doesn't seem to be a proper regional rail transportation plan to connect Tsawwassen+Mills with the Tsawwassen+ferry+terminal, Richmond and YVR. Of course there doesn't seem to be a proper regional rail plan to connect Vancouver with the Park_Royal_Shopping_Centre and the Horseshoe+Bay+ferry+terminal, as well. 

The lack of vision to link both ferry terminals with the airport is a fine example of inept transportation planning in BC. 

Friday, May 23, 2025

BC Government orders West Vancouver to expand community plans for more housing

 https://www.nsnews.com/local-news/province-orders-west-vancouver-to-expand-community-plans-for-more-housing-10697660

There should have been an official plan to extend the Canada embarrassment Line to the Park+Royal+Shopping+Centre and the Horseshoe+Bay ferry terminal. Unfortunatly, Vancouver and the metropolitan region isn't a normal city with proper urban transportation planning. 

While a rapid bus line connecting Metrotown+to+Park+Royal is a good idea, a rapid rail transit line between the Horseshoe+Bay+ferry+terminal and downtown Vancouver must be considered an essential link, someday.

Monday, May 12, 2025

Horseshoe Bay ferry terminal

Why have a proper high capacity rail line connecting the Horseshoe_Bay_ferry_terminal to YVR, when so much traffic is funneled into the narrow 3 lane Lions+Gate+Bridge and the inadequate 4 lane Oak Street Bridge?

https://www.cbc.ca/player/play/video/9.6578199


https://jfdatalinks.blogspot.com/search?q=Horseshoe+Bay+ferry+terminal

Tsawwassen ferry terminal and Horseshoe Bay ferry terminal

Backwards BC has been under a multigenerational lack of vision planning trap. A primary example of this is the lack of an official plan to have a high capacity rail link connecting the Tsawwassen_ferry_terminal and the Horseshoe_Bay_ferry_terminal to YVR.

 https://www.bcferries.com/travel-boarding/terminal-directions-parking-food/vancouver-tsawwassen/TSA

https://www.bcferries.com/routes-fares/schedules/daily/TSA-SWB

https://www.bcferries.com/routes-fares/schedules/daily/TSA-DUK

https://www.youtube.com/watch?v=N6EaFGz9zXA

https://en.wikipedia.org/wiki/Tsawwassen_ferry_terminal#History

https://www.delta-optimist.com/local-news/60th-anniversary-of-tsawwassen-ferry-terminal-photos-3123928


https://jfdatalinks.blogspot.com/search?q=Tsawwassen+ferry+terminal 

https://jfdatalinks.blogspot.com/search?q=Horseshoe+Bay+ferry+terminal

Selective Door Operation (SDO)

 https://en.wikipedia.org/wiki/Selective_door_operation#UK_variations

SDO is a great way to add an extra car at both ends of a train. Thus, a 3 car train can become 5 & a 6 car train could become 8. 

https://en.wikipedia.org/wiki/London_Underground_S7_and_S8_Stock#Features

https://en.wikipedia.org/wiki/London_Underground_S7_and_S8_Stock#/media/File:Articulate_section_S_stock.JPG

https://www.witpress.com/elibrary/wit-transactions-on-the-built-environment/74/12046

https://www.rssb.co.uk/research-catalogue/CatalogueItem/T686

The Chicago L can run up to an 8 car train, because that's the maximum station platform length. If the L can ever have walkthrough trains, then an 8 car train could become a 10 car train with SDO.

Stubborn Vancouver & BC just can't seem to allow for proper comprehensive transportation planning. 

Unfortunately, the multibillion dollar Canada+Line wasn't designed for significant future capacity. No five car trains, just a 2.5 car joke. There was a lack of vision to connect the Horseshoe+Bay ferry+terminal with downtown Vancouver and the airport.


https://jfdatalinks.blogspot.com/search?q=Selective+Door+Operation

Thursday, May 1, 2025

Horseshoe Bay upgrades

 https://dailyhive.com/vancouver/bc-ferries-passenger-booking-changes-horseshoe-bay-upgrades

Its very strange that there wasn't any proper planning to have a train connecting the Horseshoe+Bay+ferry+terminal, YVR and the Tsawwassen+ferry+terminal.

https://dailyhive.com/vancouver/bc-ferries-popular-route-busy-weekend

Unfortunately, it was difficult enough just to have a 2 car SkyTrain-Canada+Line between Vancouver & Richmond, never mind the Tsawwassen ferry terminal.  


https://jfdatalinks.blogspot.com/search?q=Horseshoe+Bay+ferry+terminal

Friday, March 28, 2025

Western Canada's future tallest tower in Metro Vancouver

 https://dailyhive.com/vancouver/pinnacle-lougheed-burnaby-office-condo-use-revisions-tower

Living in BC & especially in Vancouver, you are conditioned to expect almost everything to be watered-down or half-assed. So, for Greater Vancouver to potentially have the tallest building in Western Canada, will be quite an achievement. Since a wall couldn't be built around BC, especially the Lower_Mainland to keep people out, the next best thing was to symbolically build half-size or half-assed infrastructure. In contrast, by building proper big city infrastructure, that's indicative of wanting to accommodate growth. 

Decades ago, there should have already been a bus & HOV tunnel built near the Lions+Gate+Bridge. Then followed up with a truck & passenger train tunnel. Unfortunatly, the Canada+Line doesn't seem to be planned to ever reach W. Vancouver & especially, Horseshoe+Bay. That might actually help to improve regional transportation, which is quite lacking in backwater BC.

Friday, February 28, 2025

Metro Vancouver regional district governance review changes

 https://dailyhive.com/vancouver/metro-vancouver-regional-district-governance-review-changes

https://www.cbc.ca/news/canada/british-columbia/metro-vancouver-treatment-plan-audit-1.7239051 Why have a train tunnel fromWest Vancouver to Waterfront_Station in Vancouver when instead, you can put a few extra billion dollars into a North Shore shit-pipe?


"The reasons behind the escalation are the subject of duelling lawsuits between the contractor Metro Vancouver fired and the regional district, but the now $3.9 billion is five times beyond the original $700 million budget Metro set a decade ago and more than double a revised $1 billion budget from 2021.

The issue’s complexity lies in the fact that Metro Vancouver’s sewage treatment services are broken up into four sewerage areas, unlike the drinking water system that is operated as a single entity.

Article content
Article content

The sewerage areas are: North Shore; Vancouver, which includes UBC and parts of Burnaby and Richmond; Lulu, which is most of Richmond and Fraser, which is most other Metro municipalities.

Article content
Article content

All municipalities pay for the capital costs of new facilities, but those within each district pay a bigger share for facilities in their own district." https://vancouversun.com/news/local-news/metro-vancouver-will-pay-for-north-shore-sewage-plant


https://www.nsnews.com/in-the-community/north-vancouver-district-asks-province-for-public-inquiry-on-sewage-plant-debacle-9777554 So much extra money will have to be paid out for a shit-box & a shit-pipe cost overrun. A few extra billion dollars could have easily paid for an improved Canada+Line and extension from downtown Vancouver to Park+Royal and the Horseshoe+Bay ferry terminal.


https://vancouversun.com/news/new-westminster-mayor-sides-with-metro-vancouver-in-surrey-spat Surrey wants to eventually become the biggest city in BC. That means not having similar restrictions that Vancouver, NW & Victoria have. Surrey wants to have taller buildings than restrictive Vancouver. First, it will have to rival Burnaby & Bellevue, WA and ultimately, Vaughan, Ontario. Instead of having 1 big downtown area, there will be a few town centres as well. 

While Surrey might want to have more autonomy, its still part of the Metro_Vancouver_Regional_District.


https://jfdatalinks.blogspot.com/search?q=SHIT-BOX